Stock listing

TSX:BAA Banro Corporation Stock Price

Follow Banro Corporation into a list and get an email when it puts out news.

Delisted TSX:BAA no longer trades. Its last trading date is unknown. Company history and updates stay available on this page.

Ticker
TSX:BAA
Asset type
Stock
Exchange
TSX
Currency
CAD

Latest news

All Banro Corporation news

Banro Corporation on 6ix

News releases
138 in all · newest May 3, 2018 · oldest 2005
Decks
9 decks · latest January 2015

Decks

DeckKindSlidesDate
Investor Presentation (January 2015)Investor deck15 slidesJanuary 2015
Investor Presentation (March 2012)Investor deck25 slidesMarch 2012
Prospectors and Developers Association of Canada (PDAC) Convention 2009Conference47 slidesMar 2, 2009
INDABA Mining Conference 2006Conference18 slidesFebruary 2006
RBC Mining Conference 2005Conference31 slidesNov 10, 2005
Investor Presentation (October 2005)Investor deck33 slidesOctober 2005
Investor Presentation (June 2005)Investor deck26 slidesJune 2005
3rd Annual Gold Investment Summit November 2004Conference16 slidesNovember 2004
Investor Presentation (June 2004)Investor deck31 slidesJune 2004

Open Decks

Drill core

ReleaseDateProjectHeadline hole
Banro Intercepts Further Significant Gold Mineralization While Feasibility Drilling At Namoya Project, The Second Project Being Tabled For Production In Q1 2013
NDD223 7.56 g/t Au over 9.34 m from 134.48 m
NDD228 2.88 g/t Au over 22.08 m from 101.13 m
Jun 27, 2011Namoya projectNDD221 3.72 g/t Au over 12.10 m from 76.00 m
Banro intercepts broad zones of gold mineralization at its Lugushwa project
LDD067 1.55 g/t Au over 49.85 m from 0.00 m
LDD068 1.56 g/t Au over 65.75 m from 0.00 m
Nov 17, 2008Lugushwa projectLDD066 1.26 g/t Au over 73.90 m from 0.00 m
Banro intersects 29.00 metres grading 5.59 g/t Au, 7.70 metres grading 18.58 g/t Au and 13.50 metres grading 9.14 g/t Au in Pre-Feasibility Drilling at its Namoya Gold Project
NDD133 2.24 g/t Au over 1.00 m from 7.00 m
NDD134 0.56 g/t Au over 1.78 m from 29.70 m
Aug 19, 2008Namoya Gold ProjectNDD132 0.62 g/t Au over 4.10 m from 0.90 m
Banro intercepts 192 metres grading 2.02 g/t Au, 149 metres grading 1.71 g/t Au, 68 metres grading 3.77 g/t Au, 77.8 metres grading 2.17 g/t Au and 60 metres grading 3.50 g/t Au as part of the bankable feasibility drilling program at its Twangiza project
TDD219 4.16 g/t Au over 16.00 m from 25.00 m
TDD220 0.65 g/t Au over 1.66 m from 69.00 m
Jul 31, 2008Twangiza projectTDD218 0.77 g/t Au over 4.18 m from 52.26 m
Banro Intersects 16.60 metres grading 8.03 g/t Au and 47 metres grading 2.38 g/t Au in Pre-Feasibility Drilling at Twangiza Gold Project
TDD191 0.92 g/t Au over 1.83 m from 32.00 m
TDD192 1.02 g/t Au over 1.00 m from 9.00 m
May 29, 2008Twangiza Gold ProjectTDD190 2.46 g/t Au over 3.74 m from 19.46 m
Banro Intersects 18.62 metres grading 20.15 g/t Au and 7.25 metres grading 73.67 g/t Au in Pre-Feasibility Drilling at Namoya Gold Project
NDD100 2.00 g/t Au over 5.42 m from 11.18 m
NDD101 1.07 g/t Au over 1.00 m from 4.00 m
Apr 29, 2008Namoya Gold ProjectNDD099 4.45 g/t Au over 0.53 m from 52.65 m
Banro intersects wide zones of gold mineralization at its Lugushwa Project
LDD056 1.38 g/t Au over 33.00 m from 0.00 m
LDD057 1.56 g/t Au over 78.77 m from 112.33 m
Aug 23, 2007Lugushwa projectLDD055 1.55 g/t Au over 30.35 m from 0.00 m
Banro updates drilling results at Lugushwa
LDD017 1.09 g/t Au over 6.40 m from 46.90 m
LDD019 1.81 g/t Au over 17.00 m from 9.20 m
Feb 22, 2007Lugushwa projectLDD016 1.98 g/t Au over 28.20 m from 13.65 m
Banro announces further drilling results from its Namoya project
NDD049 1.83 g/t Au over 10.13 m from 63.87 m
NDD050 4.42 g/t Au over 9.95 m from 3.05 m
Feb 20, 2007Namoya projectNDD047 3.09 g/t Au over 17.24 m from 100.50 m
Banro completes initial drilling program at Twangiza with further wide zones of gold mineralization intersected
TDD063 2.16 g/t Au over 91.63 m from 109.15 m
TDD064 5.05 g/t Au over 11.30 m from 0.00 m
Jan 23, 2007Twangiza projectTDD062 1.97 g/t Au over 5.00 m from 37.80 m
All 18 releases
ReleaseDateProjectHeadline hole
Banro continues drilling wide zones of gold mineralization and intersects new zone at Twangiza
TDD042 2.16 g/t Au over 78.44 m from 14.56 m
TDD044 1.60 g/t Au over 25.45 m from 64.27 m
Dec 14, 2006Twangiza projectTDD041 1.85 g/t Au over 6.30 m from 0.00 m
Banro intersects wide zones of near surface gold mineralization at Lugushwa and extends mineralized trend
LDD011 12.67 g/t Au over 11.59 m from 80.11 m
LDD015 1.66 g/t Au over 43.90 m from 0.00 m
Jun 7, 2006Lugushwa projectLDD008 2.49 g/t Au over 20.80 m from 0.00 m
Banro intersects gold mineralization from its drilling at Twangiza
TDD004 1.86 g/t Au over 48.46 m from 0.00 m
TDD003 2.63 g/t Au over 31.32 m from 0.00 m
May 10, 2006Twangiza projectTDD008 5.00 g/t Au over 21.55 m from 0.00 m
Banro intersects wide zones of gold mineralisation from its initial drilling at Lugushwa
LDD002 1.47 g/t Au over 58.56 m from 0.00 m
LDD005 2.76 g/t Au over 27.89 m from 0.00 m
Apr 25, 2006G20 ProspectLDD001 1.81 g/t Au over 42.90 m from 0.00 m
Banro intersects further gold mineralisation from its drilling at Namoya
NDD038 3.71 g/t Au over 19.27 m from 41.63 m
NDD034 2.61 g/t Au over 28.64 m from 62.91 m
Apr 17, 2006Namoya projectNDD036 5.26 g/t Au over 17.76 m from 62.56 m
Banro reports further significant gold intercepts from its Namoya drilling program
NDD026 7.46 g/t Au over 15.74 m from 47.34 m
NDD028 16.01 g/t Au over 7.10 m from 55.10 m
Jan 24, 2006Namoya projectNDD018 38.63 g/t Au over 7.98 m from 144.4 m
Banro intersects further significant gold mineralisation from its drilling at Namoya
NDD008 9.20 g/t Au over 14.02 m from 110.23 m
NDD014 9.68 g/t Au over 9.43 m from 67.69 m
Dec 14, 2005Namoya projectNDD010 16.66 g/t Au over 12.36 m from 42.30 m
Banro intersects significant gold mineralisation from its initial drilling results at Namoya
NDD003 5.96 g/t Au over 26.54 m from 40.72 m
NDD001 4.45 g/t Au over 20.21 m from 20.82 m
Nov 10, 2005Namoya projectNDD002 10.54 g/t Au over 19.22 m from 71.61 m

Open Drill core

3D model

Built by 6ix from Banro Corporation’s releases · 73 holes · newest release Aug 19, 2008

Holes placed
73
Newest release
Aug 19, 2008

Open 3D model

Studies

Open Studies

Properties

PropertyCommoditiesPlaceStageOn 6ixLast news
Namoya projectGoldDemocratic Republic of the CongoEconomic study1 study · 8 drill releases · 2 resourcesJun 27, 2011
Twangiza projectGoldDemocratic Republic of the CongoEconomic study3 studies · 5 drill releases · 4 resourcesJun 8, 2009
Lugushwa projectDemocratic Republic of the Congo4 drill releasesNov 17, 2008
G20 Prospect1 drill releaseApr 25, 2006

Open Properties

People

6ix reads each seat by machine from the page it links to, and can misread one.

PersonSeat
Michael BeckettDirector · Since Nov 30, 2009 · Appointed, no departure found
Mike PrinslooChief Executive Officer · Since Aug 21, 2007 · Appointed, no departure found

Open People

Log in to ask 6ix AI your own questions about Banro Corporation.