Banro CorporationTSX: BAA

Banro intersects significant gold mineralisation from its initial drilling results at Namoya

· Issued by Banro Corporation via CNW
Drilling results include 19.22 metres grading 10.54 g/t Au, 
26.54 metres at 5.96 g/t Au, 20.21 metres at 4.45 g/t Au and 
39.37 metres averaging 3.63 g/t Au

TORONTO, Nov. 10 /CNW/ - Banro Corporation ("Banro" or the "Company")
(AMEX - "BAA"; TSX - "BAA") is pleased to announce initial drilling results
from the Company's wholly-owned Namoya project, located on the Twangiza-Namoya
gold belt in the Democratic Republic of the Congo (the "DRC").
Assay results have been received from the first seven core holes drilled
at Namoya that are part of a 7,000 metre drilling program. These results are
from the Mwendamboko prospect which forms part of a 2.5 kilometre long
mineralised trend at Namoya.

Highlights include:

-  Hole NDD002 intersected 19.22 metres grading 10.54 g/t Au from
   71.61 metres including 4.00 metres averaging 37.53 g/t Au (hole
   bottomed in mineralisation)

-  Hole NDD003 intersected 26.54 metres grading 5.96 g/t Au from
   40.72 metres including 3.24 metres averaging 14.07 g/t Au and
   2.44 metres at 30.65 g/t Au

-  Hole NDD001 intersected 20.21 metres grading 4.45 g/t Au from
   20.82 metres

-  Hole NDD005 intersected 39.37 metres grading 3.63 g/t Au from
   52.95 metres

These drilling results are over a strike length of 160 metres with holes
spaced at 40 metre sections. Core holes were inclined at between minus 48 and
66 degrees and averaged 126 metres in depth with a maximum of 157 metres down
the hole. Core recovery for these holes averaged 92% with 90% in the
mineralised zones. It is estimated that the true widths of the mineralised
zones are approximately two thirds of the intersected widths in the holes. The
mineralised sections are found within a series of sub-vertically dipping
quartz veins and stockworks in quartz-sericite-chlorite schists.

Results from all the core holes are tabulated below:

<<
Summary of Drill Hole Results

-------------------------------------------------------------------------
HOLE No.    NORTHING    EASTING  AZIMUTH INCL.   MINERALISATION      Au
           ---------------------               -------------------
              (UTM)     (UTM)                  FROM    TO   WIDTH   (g/t)
                                               (m)    (m)    (m)
-------------------------------------------------------------------------
NDD001     9557632.82  560962.1    236    51  20.82  41.03  20.21   4.45
-------------------------------------------------------------------------
Including                                     29.45  31.52   2.07  33.65
-------------------------------------------------------------------------
                                              75.95  78.00   2.05   7.43
-------------------------------------------------------------------------

-------------------------------------------------------------------------
NDD002(xx) 9557674.27  560956.5    236    49  29.00  35.00   6.00   1.32
-------------------------------------------------------------------------
                                              56.05  63.00   6.95   2.99
-------------------------------------------------------------------------
                                              71.61  90.83  19.22  10.54
-------------------------------------------------------------------------
Including                                     83.00  87.00   4.00  37.53
-------------------------------------------------------------------------

-------------------------------------------------------------------------
NDD003     9557711.63    560944    236    48  40.72  67.26  26.54   5.96
-------------------------------------------------------------------------
Including                                     58.76  62.00   3.24  14.07
-------------------------------------------------------------------------
and                                           64.82  67.26   2.44  30.65
-------------------------------------------------------------------------

-------------------------------------------------------------------------
NDD004B    9557584.44  560952.7    236    50  37.87  43.82   5.95   3.55
-------------------------------------------------------------------------
                                              63.60  92.66  29.06   1.64
-------------------------------------------------------------------------

-------------------------------------------------------------------------
(x)NDD005   9557713.3  560942.7    236    66  12.50  16.86   4.36   4.39
-------------------------------------------------------------------------
                                              52.95  92.32  39.37   3.63
-------------------------------------------------------------------------
Including                                     59.73  64.30   4.57   6.09
-------------------------------------------------------------------------
                                              81.00  83.72   2.72  14.95
-------------------------------------------------------------------------

-------------------------------------------------------------------------
NDD006     9557537.11  560958.9    236    55  43.41  49.13   5.72   1.30
-------------------------------------------------------------------------
                                              79.52  83.02   3.50   3.56
-------------------------------------------------------------------------

-------------------------------------------------------------------------
NDD009     9557561.56  560998.1    236    53  82.71  85.91   3.20   1.24
-------------------------------------------------------------------------
                                             101.70 108.32   6.62   1.34
-------------------------------------------------------------------------

(x)  Additional hole assays pending.
(xx) Hole stopped in mineralisation due to poor drilling conditions.

The objectives of the core drilling program are to upgrade the remaining
Inferred Mineral Resource at Namoya of 657,000 ounces of gold (7.818 million
tonnes grading 2.61 g/t Au) into the Measured and Indicated categories and to
delineate additional resources. This drill program follows on from the
previous adit sampling program at Namoya, which resulted in the conversion of
436,000 ounces of gold (4.560 million tonnes grading 2.97 g/t Au) from the
Inferred to the higher confidence Indicated Mineral Resource category (see
Banro's press release dated July 22, 2005, a copy of which can be obtained
from SEDAR at www.sedar.com). The holes were drilled in areas where the
previous adit sampling spacing was inadequate to upgrade the resource base.
Drill samples were taken at a maximum of one metre intervals and the gold
values are uncut. Core samples were analysed for gold by fire assay using a
50g sample at the ALS Chemex Laboratory in Johannesburg, South Africa.
Internationally recognised standards, duplicates and blanks were inserted as
part of the Company's internal QA/QC analytical procedures.
Commenting on these drilling results at Namoya, Peter Cowley, President
and C.E.O. of the Company, said: "These initial drilling results from Namoya
are very encouraging and indicate good correlation with the resource modelling
based on the previous historical data."
Additional information with respect to the Namoya property is contained
in the technical report of Steffen, Robertson and Kirsten (UK) Ltd. dated
February 2005 (see also the Company's press release dated February 28, 2005
with respect to this report). Copies of these documents can be obtained from
SEDAR at www.sedar.com and from the Company's website at www.banro.com.

Banro is a Canadian-based gold exploration company focused on the
development of four major, wholly-owned gold projects along the 210  
kilometre-long Twangiza-Namoya gold belt in the South Kivu and Maniema
provinces of the DRC. Led by a proven management team with extensive gold and
African experience, Banro's strategy is to unlock shareholder value by
increasing and developing its significant gold assets in a socially and
environmentally responsible manner.

Qualified Person
----------------
The exploration results disclosed by this press release have been
reviewed, verified (including sampling, analytical and test data) and compiled
by the Company's geological staff based in Bukavu, DRC which includes a
"qualified person" (as such term is defined in National Instrument 43-101),
Michael Skead (Aus.I.M.M), the Company's Vice President of Exploration.

Cautionary Note to U.S. Investors: The United States Securities and
Exchange Commission (the "SEC") permits U.S. mining companies, in their
filings with the SEC, to disclose only those mineral deposits that a company
can economically and legally extract or produce. Certain terms are used in
this press release, such as "measured", "indicated", and "inferred"
"resources", that the SEC guidelines strictly prohibit U.S. registered
companies from including in their filings with the SEC. U.S. Investors are
urged to consider closely the disclosure in the Company's Form 40-F
Registration Statement, File No. 001-32399, which may be secured from the
Company, or from the SEC's website at http://www.sec.gov/edgar.shtml.

Forward-Looking Statements: This press release contains forward-looking
statements that are based on the Company's current expectations and estimates.
Forward-looking statements are frequently characterized by words such as
"plan," "expect," "project," "intend," "believe," "anticipate", "estimate" and
other similar words or statements that certain events or conditions "may" or
"will" occur, and include without limitation, statements regarding potential
mineralization and resources, exploration results and future plans and
objectives of the Company. Such forward-looking statements involve known and
unknown risks, uncertainties and other factors that could cause actual events
or results to differ materially from estimated or anticipated events or
results implied or expressed in such forward-looking statements. Factors that
could cause such differences include changes in world gold markets and equity
markets, political developments in the DRC, changes to regulations affecting
the Company's activities, uncertainties relating to the availability and costs
of financing needed in the future, the uncertainties involved in interpreting
drilling results and other ecological data and the other risks involved in the
gold exploration and development industry. Any forward-looking statement
speaks only as of the date on which it is made and, except as may be required
by applicable securities laws, the Company disclaims any intent or obligation
to update any forward-looking statement, whether as a result of new
information, future events or results or otherwise. Forward-looking statements
are not guarantees of future performance and accordingly undue reliance should
not be put on such statements due to the inherent uncertainty therein.

>>


Banro Corporation on 6ix

In the deck

Story so far

Earlier from Banro

Later from Banro

All Banro news releases