Banro — Investor Presentation (March 2012)
25 slides from Banro's investor presentation, March 2012
Slide 1: Building the Premier African Gold Mining Company
Building the Premier African Gold Mining Company Simon Village, President & CEO March 2012
Slide 2: Cautionary Notes
Cautionary Notes This document shall not constitute an offer to sell or the solicitation of an offer to buy any securities of Banro Corporation (“the Company”). Cautionary Note Concerning Forward-Looking Statements: This presentation contains forward-looking statements. All statements, other than st
Slide 3: Corporate summary
Corporate summary TSX, NYSE AMEX: BAA 200 million shares outstanding + US$1 billion market cap Democratic Republic of the Congo Offices: Toronto (Corporate) Bukavu & Kinshasa (Operations) Financial position: Free cash-flow in Q1 2012 Twangiza Phase I (Oxide) estimated to generate circa US$10 million
Slide 4: Board with proven track records in Africa & in Gold
Board with proven track records in Africa & in Gold Simon Village, President & CEO • Former Managing Director, World Gold Council; founder of Exchange Traded Gold; HSBC Managing Director for Global Mining , Mining Engineer (Anglo American/De Beers), Chairman since 2004; appointed CEO in 2010 Arnold
Slide 5: Strong in-country expertise, flat management structure
Strong in-country expertise, flat management structure minimal turnover at all levels Board of Directors Executive Committee 4
Slide 6: The Opportunity
The Opportunity Twangiza-Namoya Gold Belt (DRC) Democratic 210km long Republic of Highly-prospective the Congo 400000 mE 450000 mE 500000 mE 550000 mE 600000 mE 650000 mE 700000 mE 750000 mE Lake Kivu N Bukavu Walungu 9700000 mN Shabunda 9700000 mN Kindu TWANGIZA N2 N5 road provides limited access t
Slide 7: A Strategy to maximize shareholder value
A Strategy to maximize shareholder value Strategy to focus on rapid development of Banro’s oxide resources Priority of developing Oxides ahead of the sulphides Lower financing risk & higher return on capital Limited further dilution as a result of Banro’s ability to fund internally Shortest
Slide 8: Value Proposition
Value Proposition Banro’s 2012 business plan is built on 3 core objectives: Achieve steady gold production at Twangiza Optimizing mine, plant and human capital performance to secure consistent cash flow of $10 million per month Increase oxide M&I resources to 4 million ounces of gold Banro has +
Slide 9: Targeted Production Pipeline
Targeted Production Pipeline Oxide ounces take priority over Sulphides (projections ONLY) Moz 0.8 0.7 0.6 Twangiza 0.5 Phase II 0.4 Kamituga 0.3 Lugushwa 0.2 Namoya 0.1 Twangiza Phase I 2011 2012 2013 2014 2015 2016 2017 8
Slide 10: Growing & replacing Banro's mineral reserves through exploration
Growing & replacing Banro’s mineral reserves through exploration To increase Oxide M&I resources to 4.0 million ounces Twangiza West and East, updated resource estimates underway; Review of Twangiza mineral resources underway Regional exploration to commence in Mufwa during Q1 2012 Define 1.0
Slide 11: Project Highlights - Twangiza
Project Highlights - Twangiza Banro’s attractive portfolio consists of high quality, open pit, and rapidly advancing projects Strategy to deliver oxide projects into the pipeline to maximize free cash-flow TWANGIZA Status 120,000 oz/yr Currently attaining 250 oz/day Ramping up to 320-340 oz/
Slide 12: Project Highlights - Namoya
Project Highlights - Namoya Banro’s Namoya project supports the Oxide Strategy – open pit, easily brought into production, simple processing NAMOYA Status Site access now completed Preparation underway for 2 mtpa gravity heap leach plant Production anticipated at 125,000 oz/yr at approximately
Slide 13: Project Highlights - Lugushwa
Project Highlights - Lugushwa Banro’s Lugushwa project indicates similar potential to Namoya - oxide resource, good grade, simple processing LUGUSHWA Status Heap Leach scoping study in progress Metallurgical test work underway Resources* Target: oxides +1.0 Moz by Currently have: Inferred: 2
Slide 14: Project Highlights - Kamituga
Project Highlights - Kamituga Banro’s Kamituga project continues to be one of the top exploration priorities along the Twangiza-Namoya gold belt KAMITUGA Kamituga Project Overview • Kamituga is located 100 km south of Bukavu and consist of 3 PEs covering an area of 649 km2 • Gold was first discovere
Slide 15: Kamituga Work Program – Geochemistry Survey
Kamituga Work Program – Geochemistry Survey 14
Slide 16: Kamituga Work Program – Geology
Kamituga Work Program – Geology 15
Slide 17: Kamituga Work Program – Trenching
Kamituga Work Program – Trenching 628000 mE 628500 mE 629000 mE 629500 mE N 9661000 mN KIB-CH1 9661000 mN 5.00 m @ 3.92 g/t Au from 37 m 40 KIBUKILA PROSPECT 2.00 m @ 2.96 g/t Au from 66 m KIB-T1 70 64 KIB-T2 16.00 m @ 1.32 g/t Au from 70 m 68 80 incl. 3.00 m @ 5.26 g/t Au from 80 m 40 32.00 m @ 2.3
Slide 18: Kamituga Work Program – Regional structures
Kamituga Work Program – Regional structures 17
Slide 19: Regional Exploration
Regional Exploration Regional Exploration Significant potential to expand the Palaeoproterozoic portfolio of projects through (2500 – 1600 Ma) exploration on the highly prospective 25 km Twangiza-Namoya gold belt Basalt (Recent) Airborne Geophysical (aeromagnetic and radiometric) Twangiza survey
Slide 20: Social Development: Ensuring the long-term development of the belt
Social Development: Ensuring the long-term development of the belt The Foundation is the mechanism to deliver Banro’s commitment to corporate social responsibility throughout it’s communities in the DRC Registered in the DRC as a charity with a mandate to support Education Health Infrastructu
Slide 21: Infrastructure along the gold belt
Infrastructure along the gold belt Lake Kivu 400000 mE 450000 mE 500000 mE 550000 mE 600000 mE 650000 mE 700000 mE 750000 mE N2 road completed by World Bank Project N provides access to Twangiza and Bukavu Kamatuga Walungu 9700000 mN Shabunda 9700000 mN Requires road construction to Lugushwa and Nam
Slide 22: Banro - Building the Premier African Gold Mining Company
Banro - Building the Premier African Gold Mining Company Banro has demonstrated its in-country capabilities, with strong technical skills in exploration, project development and now gold mining Banro has a proven and extensive project pipeline with untapped exploration upside and is well on its
Slide 23: Shareholders
Shareholders By Category Institutions 80% Top 5 institutions 38% Retail 20% Top shareholders Blackrock (UK) 12.5% JP Morgan Asset Mgmt 9.7% Tradewinds Global 7.3% Van Eck Associates 4.9% Tocqueville Asset Mgmt 4.6% Franklin Advisors 4.0% Contact Banro Investor Relations Naomi Nemeth +1 416 366 2221,
Slide 24: Resources & Reserves
Resources & Reserves Mineral Resources Property Measured Indicated Inferred Tonnage Grade Ounces Tonnage Grade Ounces Tonnage Grade Ounces (Mt) (g/t) Moz (Mt) (g/t) Moz (Mt) (g/t) (Moz) Twangiza 11.1 2.49 0.89 6.8 1.9 0.4 1.7 4.2 0.1 Oxide Twangiza 6.1 2.22 0.43 83.5 1.4 3.9 6.4 1.3 0.3 Non‐oxide Na
Slide 25: Hydropower underpins long term cost structure
Hydropower underpins long term cost structure Hydro power generation will significantly reduce the power costs along the belt At a cost of US$120 million, the first phase of a hydro electric power generating facility could be built 25km from Twangiza with a generation capacity of 30MW Additional