Banro — Prospectors and Developers Association of Canada (PDAC) Convention 2009
47 slides from Banro's conference presentation, Mar 2, 2009
Slide 1: From Gold Explorer to Mine Developer 'The Way Forward'
From Gold Explorer to Mine Developer ‘The Way Forward’ PROSPECTORS AND DEVELOPERS CONVENTION TORONTO, CANADA [DATE, 2008] March 2, 2009
Slide 2: Cautionary Notes
Cautionary Notes Cautionary Notes This presentation and references to specific press releases, contain forward-looking statements. All statements, other than statements of historical fact, that address activities, events or developments that the Company believes, expects or anticipates will or may
Slide 3: Table of Contents
Table of Contents 1. Company Structure 2. Operating in the DRC 3. Key Assets 3.1 Twangiza 3.1.1 Twangiza’s Feasibility 3.2 Namoya 3.3 Lugushwa 3.4 Kamituga 4. Regional Exploration 4.1 Sample Preparation Laboratory 5. Strategy 3
Slide 4: Banro is an emerging, mid-tier African gold producer
1. Company Structure Banro is an emerging, mid-tier African gold producer Banro Corporation is a Canadian-based gold exploration and development Company with four wholly-owned major gold properties along the 210 kilometre Twangiza-Namoya gold belt of the Democratic Republic of the Congo (DRC) Ba
Slide 5: Banro Corporation structure
1. Company Structure BANRO BANRO CONGO CORPORATION EXPLORATION TWANGIZA NAMOYA LUGUSHWA KAMITUGA All companies are 100% held by Banro under a mining convention An experienced Board and Management Team, with a Proven Track Record 5
Slide 6: Banro's portfolio of four high quality, rapidly advancing projects
1. Company Structure Banro’s attractive portfolio consists of four high quality, rapidly advancing projects Strategy to delineate and advance world class projects up the value curve TWANGIZA Status NAMOYA Status Scoping Study completed in Q2 2007 Scoping Study completed in Q2 2007 PFS comple
Slide 7: Substantial and growing resource base with exploration potential
1. Company Structure The Company boasts a substantial and growing resource base with significant exploration potential Banro believes the Twangiza-Namoya gold belt to be one of the largest undeveloped gold districts in Africa – with a substantial resource base and exciting exploration potential
Slide 8: Unique license arrangements in the DRC
1. Company Structure Banro benefits from unique license arrangements in the DRC Historical interaction with Government has allowed the Company to achieve favourable terms Banro was founded in 1996 and purchased its interests in the DRC through a 72% interest in SOMINKI (with the Government of Za
Slide 9: Democratic Republic of the Congo (DRC)
2. Operating in the DRC Democratic Republic of the Congo (DRC) Political, social and economic climate stable Improving logistics and infrastructure which has benefited from the provision of emergency aid work The Company has been well received to date No security issues Operated without in
Slide 10: Democratic Republic of the Congo (DRC) Continued
2. Operating in the DRC Democratic Republic of the Congo (DRC) Continued... Security situation has been relatively constant Some deterioration in North Kivu late last year Recent progress following Nairobi talks in December 2008 In terms of investment risk the Congo has been stable since 200
Slide 11: Logistics and Infrastructure
2. Operating in the DRC Logistics and Infrastructure Infrastructure is continuing to improve National Road N2 currently being upgraded (World Bank funding) Access road from N2 to Twangiza to be upgraded and refurbished (Banro funding) Port access through Mombasa Then by road through Keny
Slide 12: Community Relations – Banro Foundation
2. Operating in the DRC Community Relations – Banro Foundation Banro handles its community relations programme directly through the Banro Foundation, a registered charity in the DRC with the following mandate “Support education, health and infrastructure improvements, principally in the communit
Slide 13: Community Relations – Banro Foundation
2. Operating in the DRC Community Relations – Banro Foundation The Banro Foundation has led many local initiatives, improving living conditions for the local community (See the Banro website for further details on the Banro Foundation) We use local labour/contractors and work closely with NGO’s
Slide 14: Community Relations – Banro Foundation Continued
2. Operating in the DRC Community Relations – Banro Foundation Continued… Naluhwindja Secondary School at Luhwindja – Twangiza Starting the construction School in progress Kigumo Health Center at Lugushwa Before After 14
Slide 15: Road Construction in Twangiza area
2. Operating in the DRC Community Relations – Banro Foundation Continued… Road Construction in Twangiza area 15
Slide 16: Luhwindja Water Project
2. Operating in the DRC Community Relations – Banro Foundation Continued… Luhwindja Water Project in conjunction with the Roman Catholic Church Agency (BDD) Potable Water to the Village of Makalanga, near Lugushwa and Kange in Luchiga, near Luhwindja 16
Slide 17: Twangiza Project – Feasibility Study Completed January 2009
3. Key Assets – Twangiza Twangiza Project – Feasibility Study Completed January 2009 Potential to create a significant long life gold mine that after payback can/will provide the funding to develop other projects 300+ Koz per annum profile for 7-10 years Capital markets are currently not conduci
Slide 18: Twangiza Resource Development
3. Key Assets – Twangiza Twangiza Resource Development Significant resource development and conversion has been achieved over the last 3 years Planned Resource development and conversion 9 Inferred Resources not included in 8 June 2008 Pre-Feasibility Study following a change in the pit model 1.5
Slide 19: Twangiza Project – Overview (Main and North Deposits)
3. Key Assets – Twangiza Twangiza Project – Overview (Main and North Deposits) Commenced drilling in February 2006 694000 mE 692000 mE Announced new discovery of Twangiza North N in June 2007 M’CHITERA Scoping Study (Preliminary Assessment) completed in July 2007 9686000 m N 9686000 m N Pre-
Slide 20: Twangiza Feasibility – Key Parameters
3. Key Assets – Twangiza Twangiza Project Feasibility – Key Parameters (Based on Twangiza Main and North only) Open pit Heavily oxidised with easy initial processing/higher throughput/high recoveries Treats all of the ore as and when it gets mined Open ended (at depth) and potential to add a
Slide 21: Twangiza Feasibility – Key Parameters Continued
3. Key Assets – Twangiza Twangiza Project Feasibility – Key Parameters Continued… (Based on Twangiza Main and North only) Anticipated Timeline Completed Feasibility Study in January 2009 Continue resource expansion in 2009 Secure Strategic Partner to co-develop the Twangiza Project Constru
Slide 22: Twangiza Feasibility Study – Highlights
3. Key Assets – Twangiza Twangiza Project Feasibility Study – Highlights (Based on Twangiza Main and North only) Banro’s ‘Flagship’ Project has positive economics and significant value enhancing opportunities with the completion of Twangiza’s Feasibility Study Study completed in an improving Gol
Slide 23: Twangiza Feasibility – Highlights Continued
3. Key Assets – Twangiza Twangiza Project Feasibility - Highlights Continued… (Based on Twangiza Main and North only) Twangiza Project capital expenditure of US$409.6 million (which includes a contingency of US$38.9 million) A separate stand alone 30MW Hydro Electric Run-of River scheme (on the
Slide 24: Twangiza Feasibility Study – Reserve & Resource Estimates
3. Key Assets – Twangiza Twangiza Project Feasibility Study– Reserve & Resource Estimates (Based on Twangiza Main and North only) Mineral Resource Estimate (9 January, 2009) – Above 0,5 g/t are cut off Tonnes Grade Ounces Category (Million) (g/t Au) (Million) Measured 17.2 2.40 1.32 Indicated 90.3
Slide 25: Twangiza Feasibility Study – Operating/Financial Metrics
3. Key Assets – Twangiza Twangiza Project Feasibility Study – Operating/Financial Metrics Mine Planning Capital Costs Summary (1) Diesel Fuel Price US$1.20/ltr Feasibility Study HEP Costs US$0.084/kWh US$ Million Mine Throughput 5.0 Mtpa Mining 76 Mine Life (First Phase) 15 years Process Plant 175 D
Slide 26: Twangiza Feasibility Study - Base Case Results
3. Key Assets – Twangiza Twangiza Project Feasibility Study - Base Case Results Average Annual Gold Production and Associated Total Operating Cash Costs ‘Life of Mine of 15 Years’ 350 1000 320 Koz Au 900 300 Operating Cash Costs (US$/oz) Annual Gold Production (Koz) 262 Koz Au 800 250 700 600 200 17
Slide 27: Twangiza Feasibility Study - Sensitivity Analysis
3. Key Assets – Twangiza Twangiza Project Feasibility Study - Sensitivity Analysis on Base Case of (US$850/oz) IRR NPV (US$ million) at different discount rates (%) Gold Price US$/oz % 0% 5% 10% 750 12.7 328 154 44 850 20.5 593 342 185 950 27.4 858 530 325 All scenarios Include Banro’s funding p
Slide 28: Hydro Electric Power Project – A Key Cost Advantage
3. Key Assets – Twangiza Hydro Electric Power Project – A Key Cost Advantage A positive feasibility study has highlighted the potential for Run-of-River hydro electric power generation on the Ulindi River Four sites were investigated on two different rivers, with two sites on the Ulindi showing
Slide 29: Twangiza – Significant near surface exploration targets
3. Key Assets – Twangiza Twangiza Project – Significant near surface exploration targets (old workings and geological anomalies) Banro aims to delineate satellite ore bodies and create a total oxide/transition (non refractory) reserve of 4-5 Moz + in the Twangiza area that can be to be trucked to a
Slide 30: Aerial photographs of Kaziba
3. Key Assets – Twangiza Aerial photographs of Kaziba 30
Slide 31: Kaziba Panoramic view and Artisanal Workings
3. Key Assets – Twangiza Kaziba Panoramic view and Artisanal Workings on top of mountain 31
Slide 32: Geologists inspecting Kaziba Artisanal workings
3. Key Assets – Twangiza Geologists inspecting Kaziba Artisanal workings 32
Slide 33: Mufwa West and East Workings
3. Key Assets – Twangiza Mufwa West Workings Mufwa East Workings
Slide 34: Workings in the Mufwa Area (Moroc Workings)
3. Key Assets – Twangiza Workings in the Mufwa Area (Moroc Workings) Before After 34
Slide 35: Tshondo
3. Key Assets – Twangiza Tshondo
Slide 36: Namoya Project – Pre-Feasibility/Feasibility Study underway
3. Key Assets – Namoya Namoya Project – Pre-Feasibility/Feasibility Study underway Namoya able to be a simple heap leach, open pit operation Lower capex and operating costs than CIL as an initial option Plan is build a heap leach project for first 7 years and then a smaller CIL plant for the f
Slide 37: Namoya Resource Development
3. Key Assets – Namoya Namoya Resource Development Significant resource development and conversion has been achieved over the last 3 years Planned Resource 2.5 development and conversion 2 New Targets 0.5 Kakula West 1.5 Seketi Gold - Moz Matongo 0.6 Filon 1 0.6 0.7 1.5 0.5 0.9 0.7 0.4 0 J
Slide 38: Namoya Project – Key Parameters (Heap Leach Option)
3. Key Assets – Namoya Namoya Project – Key Parameters (Heap Leach Option) Open pit Heavily oxidised material at surface with easy initial processing/high recoveries Heap leach option has volume flexibility with crushing and low technical risk Open ended (at depth) and potential to add ounce
Slide 39: Lugushwa Project – Scoping Study Underway
3. Key Assets – Lugushwa Lugushwa Project – Scoping Study Underway Heavily oxidised shallow deposits Namoya’s experience and Heap Leach/CIL option alternatives, will provide a good learning curve and cost saving opportunity on design/equipment for the Lugushwa Heap Leach development alternative,
Slide 40: Lugushwa Project – Scoping Study Underway
3. Key Assets – Lugushwa Lugushwa Project – Scoping Study Underway Exploration continues with a broad drilling and surface program Mineralised trend now exceeds 4,5 km Geological model established and will drive drilling focus, to reconfirm resources B Combined Inferred resources of 37 Mt at
Slide 41: Kamituga Project – Desktop Study Underway
3. Key Assets – Kamituga Kamituga Project – Desktop Study Underway LiDAR, aeromagnetic and radiometric surveys of the property have been Tonnes Grade Ounces completed Category Deposit (Million) (g/t Au) (Million) Previously high grade veins were mined Inferred Surface 4.14 2.40 0.32 (adits) Infe
Slide 42: Regional Exploration
4. Regional Exploration Regional Exploration Significant potential to expand the portfolio of projects through exploration Regional Radiometric Survey on the highly prospective Twangiza- Namoya gold belt Airborne Geophysical (aeromagnetic and radiometric) surveys have identified new targets Fl
Slide 43: Sample Preparation Laboratory in Bukavu
4. Regional Exploration Sample Preparation Laboratory in Bukavu 43
Slide 44: Strategy – Review of 2008
5. Strategy Review of 2008 In Twangiza, Banro now has its flagship project “ready to go” with Further future upside on oxide ounces Further upside on input parameters when Feasibility Study is reviewed and further optimised Opportunity to improve on refractory recoveries (metallurgical testw
Slide 45: Strategy – Review of 2008 Continued
5. Strategy Review of 2008 Continued… Banro has reviewed and reassessed its position at the end of 2008 and will proceed with an amended and more prudent strategy in the current world financial climate/environment Reduced budget for F2009 following completion of infill drilling and the Feasibili
Slide 46: Banro has developed a new near term strategy
5. Strategy Banro has developed a new near term strategy Given current market conditions the Company is focused on positioning itself for the development of Twangiza, ahead of Namoya and Lugushwa To do this Banro is seeking a Strategic Partner To participate in funding of the Twangiza Project
Slide 47: The Rationale - growth through partnership
5. Strategy The Rationale - growth through partnership Demonstration of a prudent strategy Allows time to seek a Strategic Partner for Twangiza Allows time to grow Twangiza’s ounce profile with additional ounces from the neighbouring deposits (all close to Hydro power and a centralised plant)