Banro Corporation

Banro — RBC Mining Conference 2005

31 slides from Banro's conference presentation, Nov 10, 2005

  1. Slide 1: Banro Corporation

    Banro Corporation AMEX: BAA “Developing One Of Africa’s Major Gold Belts” D.R. Congo DRC Twangiza-Namoya Gold Belt RBC Mining Conference 10th November 2005 Simon Village - Chairman 1 www.banro.com

  2. Slide 2: Cautionary Note Regarding Forward-Looking Statements

    Cautionary Note Regarding Forward- Looking Statements AMEX: BAA This presentation contains forward-looking statements that are based on Banro Corporation’s current expectations and estimates. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could

  3. Slide 3: Gold Mines developed during the late 80's and 90's

    Gold Mines developed during the late 80’s and 90’s AMEX: BAA MALI GUINEA TANZANIA GHANA D.R. CONGO Producing Mine>100,000 oz/year 3 www.banro.com

  4. Slide 4: D.R. Congo

    D.R. Congo AMEX: BAA An improving political, social and economic climate to tap the country’s vast undeveloped natural resources Kilo Moto Gold Belt (Ituri Province) DRC Twangiza-Namoya Gold Belt (Maniema & South Kivu Provinces) ..evidenced by the number of international companies investing in the D

  5. Slide 5: D.R. Congo - Demographics

    D.R. Congo - Demographics AMEX: BAA Language / Ethnic distribution Banro is located in South Kivu / Maniema province, with common ethnicity and language supporting developments in the region 5 www.banro.com

  6. Slide 6: D.R. Congo

    D.R. Congo AMEX: BAA An improving political, social and economic climate „ Dec - 2002: Peace accord signed between the government and rebel groups with transitional government established to hold democratic elections by June ‘06. „ Jun – Jul 2003: New Mining Code implemented with the support of the

  7. Slide 7: Banro's Commitment to Strong Relationships at Central, Provincial and Local Levels

    Banro’s Commitment to the Establishment of strong relationships at Central, Provincial and AMEX: BAA Local Levels „ Established Banro’s credentials with the central Government in Kinshasa „ Pro-actively facilitated and established excellent working and “transparent” relationships between Central Gov

  8. Slide 8: Banro's Twangiza-Namoya Gold Belt

    Banro’s Twangiza-Namoya Gold Belt AMEX: BAA ƒ A 210 km long gold belt with historical production of over 2.4 Million Ounces ƒ Four significant projects under separate exploitation concessions with mining conventions and 8mozs delineated to date ƒ In process of documenting title on intervening ground

  9. Slide 9: Banro - structured to unlock value & provide flexibility

    Banro - structured to unlock value & provide flexibility AMEX: BAA Banro Corporation 100% 36% TSX-V BRC Diamond Corporation 25 Year Mining Convention Applies Twangiza SARL Kamituga SARL Lugushwa SARL Namoya SARL Database Gold Gold Gold Gold Banro Congo Mining SARL Accumulated 1164 km2 649km2 641 km2

  10. Slide 10: Banro – Convention underpins investors future returns from the gold belt

    Banro – Convention underpins investors future returns from the gold belt AMEX: BAA „ Banro is one of the few companies that has had its tenure stress-tested, and has secured a favorable mining convention „ 25 year Mining Convention renewable in 2027 for a further 25 years introduces significant expl

  11. Slide 11: Twangiza Project

    Twangiza Project AMEX: BAA „ Project evaluated by Charter Consolidated during mid 70’s „ Phase I - Banro drilled 19 core drill holes totaling 9,122m over a strike length of 800m „ Total Mineral Resources of 3.2 Million Ounces delineated from only 20% of the total mineralized trend „ Phase II – Comme

  12. Slide 12: Twangiza Project's Untested Resource Potential

    Twangiza Project’s Untested Resource Potential AMEX: BAA TW 97-1 209m @3.5g/T from 63.2m TW 97-3 64m @3.0g/T from 189m and 57m @2.1g/T from 284m TW 97-4 36m @3.6g/T from 0m and 46m @3.0g/T from 46m and 28m @2.8g/T from 99m and UNTESTED 50m @2.2g/T from 288m DRILL POTENTIAL TW 97-5 53m @2.4g/T from 7

  13. Slide 13: Twangiza – Total Resources 3.2Mozs

    Twangiza – Total Resources 3.2Mozs AMEX: BAA Type Measured & Indicated Inferred (1g/T cut- cut-off) (1g/T cut- cut-off) Tonnes Grade Ounces Tonnes Grad Ounces (g/T) e (g/T) Oxide 5,785,000 3.24 603,000 3,030,000 2.94 286,000 Sulphide 24,601,000 1.78 1,407,000 16,211,000 1.71 889,400 Total 30,386,000

  14. Slide 14: Twangiza Deposit Upside

    Twangiza Deposit Upside AMEX: BAA N Open Open Open Upside Potential Mineralisation (>0.8g/T) 14 www.banro.com

  15. Slide 15: Twangiza Project (3.2 Moz to date)

    Twangiza Project (3.2 Moz to date) AMEX: BAA North South Plunge 15 www.banro.com

  16. Slide 16: Twangiza Project – Additional Exploration Potential

    Twangiza Project – Additional Exploration Potential AMEX: BAA N BUGOY MUFWA Potential for Centralised Plant TWANGIZA Legend: Prospect Granite Intrusive Shale Conglomerate TSHONDO 0 2 Km. 16 www.banro.com

  17. Slide 17: Namoya Project

    Namoya Project AMEX: BAA ƒGold mineralization associated with sub-vertical quartz veins and stock- works associated with “jogs” along 2.5km shear zone ƒHistorical production of 237,000oz prior to closure in 1961, despite reserves being available ƒLarge historical database has enabled low cost and ra

  18. Slide 18: Namoya Project – Drilling to upgrade & expand resource

    Namoya Project – Drilling to upgrade & expand resource AMEX: BAA „ Resource upgrade from July 05 „ Confirmation and extension drilling Q3 ’05-Q1 ’06 and scoping study Q1/2 ‘06 to determine mining, processing parameters & economics „ Ridge & spur sampling has delineated parallel trend which will be d

  19. Slide 19: Namoya Project – Exploration Activity

    Namoya Project – Exploration Activity AMEX: BAA 19 www.banro.com

  20. Slide 20: Lugushwa Project

    Lugushwa Project AMEX: BAA „ Historical production of 460,000 oz „ Abnormally high grade alluvials shedding from a series of prominent ridges with extensive artisanal activity „ Initial focus on D18/19, G20/21 & G7 Mapale Mineralised zones & Extensions „ High grade alluvials to the NNE and SSW indic

  21. Slide 21: Lugushwa Project: Significant additional potential along mineralised trend

    Lugushwa Project “Significant additional potential along mineralised AMEX: BAA trend” MAPALE G7 LUGUSHWA D18 D19 LUGUSHWA G20 G21 Colour Coding for Stream Sediment Polygons g/m3 SIMALI D8 D9 21 www.banro.com

  22. Slide 22: Lugushwa Project's Resource Potential

    Lugushwa Project’s Resource Potential AMEX: BAA ƒ Ground works ongoing, with significant new trench results ƒ G20 Prospect - 99m @4.39g/t (incl. 47m @6.24g/t) - 84m @1.97g/t (incl. 20m @3.9g/t) - 70.5 metres @4.90g/t - 93 metres @2.24g/t - 39 metres @8.67g/t Lugushwa Total Inferred Resource Tonnes G

  23. Slide 23: Kamituga Project

    Kamituga Project AMEX: BAA ƒHistorical Production of 1.5 Moz from alluvials and hard rock. ƒPrimary mineralisation of shallow dipping sheeted quartz veins and stock works ƒOpen pit and underground potential for disseminated wall rock mineralisation ƒEvaluation to commence Q2 ‘06 Kamituga Inferred Re

  24. Slide 24: Kamituga Project

    Kamituga Project Major historical Producer(1.5 Moz) – AMEX: BAA Hydroelectric Potential on Banro’s properties 24 www.banro.com

  25. Slide 25: Exploration Program Status

    Exploration Program Status AMEX: BAA Project Camp Ground works Drilling M & I Upgrade Scoping Pre- Set-up (Gridding/soil Study/Pit feas. sampling / Optimisation trenching) Namoya Nov ’04 Ongoing August ’05 Q3 ’05-Q1 ‘06 Q1 ’06 Q4 ’06 Lugushwa Dec ’04 Ongoing Q4 ’05 Q3 ’06 Q3 ’06 Q4 ’06 Twangiza Q3 ’

  26. Slide 26: Exploration Expenditure & Drilling

    Exploration Expenditure & Drilling AMEX: BAA Project Exploration Budget Drilling Drilling Scoping (US$000 to 2006) (Metres 2005) (Metres 2006) Study Namoya $7,638 7,200 20,400 Q1 ’06 Lugushwa $7,044 3,600 19,200 Q3 ’06 Twangiza $6,251 3,600 14,400 Q2/3 ’06 Total $20,933 14,400 54,000 Grand Total 68,

  27. Slide 27: 2005 Exploration Objective

    2005 Exploration Objective AMEX: BAA “Increase Measured & Indicated Resource categories to +6.0 Mozs by end 2006” Property Measured and Inferred Resource Indicated (Ounces) Resource (Ounces) Twangiza Oxides 604,626oz 287,456 5.8MT@3.2g/T 3MT@2.9g/T Sulphides 1,412,574 894,220 24.6MT@1.8g/T 16MT@1.7g

  28. Slide 28: A Board with Proven Track Records in Africa & in Gold

    A Board with Proven Track Records in Africa & in Gold AMEX: BAA ƒ Simon Village, Chairman Former: Managing Director World Gold Council & Managing Director HSBC; Director Exchange Traded Gold ƒ Peter Cowley, President & CEO Former M.D. of Ashanti Exploration and Technical Director of Cluff Resources

  29. Slide 29: A Management Team with Depth & strong Technical Expertise

    A Management Team with Depth & strong Technical Expertise AMEX: BAA ƒ Mike Skead, V.P Exploration Former Expl. Manager of Samax Resources and Ashanti Goldfields ƒ Dan Bansah, Mineral Resources Manager Former Minerals Resource Manager of Ashanti Goldfields Howard Fall, Chief Geologist Former Expl. Ma

  30. Slide 30: Corporate Information

    Corporate Information (As of November 2005) AMEX: BAA „ Based in Toronto and listed on: „ TSX: BAA „ AMEX: BAA „ Shares (millions) „ Issued 32.56 „ Fully Diluted 37.01 „ Shareholders „ Management 13% „ Retail 20% „ Institutional 67% „ Adjusted Market Cap US$207Million „ Cash US$28Million „ Adj. Mkt

  31. Slide 31: Banro - Assets of a Major – Passion of a Junior

    Banro - “Assets of a Major – Passion of a Junior” AMEX: BAA Gridding - Lugushwa Helicopter Supported Programs Lugushwa Camp Bukavu Office Drilling Namoya Core examination Namoya 31 www.banro.com

Banro — RBC Mining Conference 2005 on 6ix