Banro Corporation

Banro — 3rd Annual Gold Investment Summit November 2004

16 slides from Banro's conference presentation, November 2004

  1. Slide 1: Banro Corporation

    Banro Corporation TSX-V: BNR “Developing One Of Africa’s Major Gold Belts” D.R. Congo Twangiza-Namoya DRC Gold Belt Peter Cowley 3rd Annual Gold Investment Summit President & C.E.O. November 2004 www.banro.com 1

  2. Slide 2: Gold Mines developed during the late 80's and 90's

    Gold Mines developed during the late 80’s and 90’s TSX-V: BNR MALI GUINEA TANZANIA GHANA D.R. CONGO Producing Mine>100,000 oz/year www.banro.com 2

  3. Slide 3: D.R. Congo

    D.R. Congo TSX-V: BNR An improving political, social and economic climate to tap the country’s vast undeveloped natural resources Kilo Moto Gold Belt DRC Twangiza-Namoya Gold Belt www.banro.com 3

  4. Slide 4: D.R. Congo: An improving political, social and economic climate

    D.R. Congo TSX-V: BNR An improving political, social and economic climate • December 2002: Peace accord signed between the government and rebel groups. • April 2003: Joseph Kabila is sworn in as interim head of state to preside over a transitional government for a two year period leading to democrat

  5. Slide 5: Banro Corporation: A long term investor in DRC

    Banro Corporation TSX-V: BNR “A long term investor in DRC” • Based in Toronto and London, listed on: - TSX-V:BNR • Shares (millions) - Issued 13.2 - Fully Diluted 15.2 • Adjusted Market Cap US$ 87 Million • Large Mineral Resource base of 2.01 Million ounces Measured & Indicated + significant inferre

  6. Slide 6: Banro's Twangiza-Namoya Gold Belt

    Banro’s Twangiza-Namoya Gold Belt TSX-V: BNR • A 210 km long gold belt with historical production of over 1.4 Million Ounces • Four significant projects at Twangiza, Kamituga, Lugushwa and Namoya under separate exploitation concessions and mining conventions totalling 2,600 km2 • Awaiting title for

  7. Slide 7: Twangiza Project's Untested Resource Potential

    Twangiza Project’s Untested Resource Potential TSX-V: BNR • Project evaluated by Charter Consolidated during mid 70’s. • Banro drilled 19 core drill holes totaling 9,122m over a strike length of 800m in 1997-8. UNTESTED POTENTIAL • Total Mineral Resources of 3.2 Million Ounces outlined. • Represents

  8. Slide 8: Twangiza – Significant drill intercepts from 1997-98 core drilling programme

    Twangiza – Significant drill intercepts from 1997-98 core drilling programme TSX-V: BNR TW 97-1 209m @3.5g/T from 63.2m TW 97-3 64m @3.0g/T from 189m and 57m @2.1g/T from 284m TW 97-4 36m @3.6g/T from 0m and 46m @3.0g/T from 46m and 28m @2.8g/T from 99m and 38m @2.8g/T from 220m and 50m @2.2g/T from

  9. Slide 9: Twangiza – Total Resources 3.2Mozs

    Twangiza – Total Resources 3.2Mozs TSX-V: BNR Type Measured & Indicated* Inferred* (1g/T cut-off) (1g/T cut-off) Tonnes Grade Ounces Tonnes Grade Ounces (g/T) (g/T) Oxide 5,785,000 3.24 604,626 3,031,000 2.94 287,456 Sulfide 24,601,000 1.78 1,412,574 16,211,000 1.71 894,220 Total 30,386,000 2.06 2,0

  10. Slide 10: Namoya Project's Resource Potential

    Namoya Project’s Resource Potential TSX-V: BNR SHEAR ZONE •Mine closed in 1961 •Gold mineralization associated with sub-vertical quartz veins and Resource zone stockworks associated with “jogs” along 2,500m long shear zone. Namoya Total Inferred Resource* New parallel zone Tonnes Grade Ounces (g/T)

  11. Slide 11: Lugushwa Project's Resource Potential

    Lugushwa Project’s Resource Potential TSX-V: BNR G20-21 Prospect (faulted D18-19 Prospect) •Historical production of 460,000 oz •4 kilometre mineralised trend •Several prospects with significant adit/trench results requiring drilling: • D18-19 Prospect (440m strike) 44m @ 3.9g/T 36m @ 2.9g/T • D20-2

  12. Slide 12: Exploration Program Status

    Exploration Program Status TSX-V: BNR • Exploration office in Bukavu, South Kivu Province. • Field camps at Twangiza, Lugushwa and Namoya project areas being established • A US$10 million country exploration budget has been outlined that includes 28,000 metres of core drilling(approx.140 holes) on T

  13. Slide 13: 2004-5 Exploration Objective

    2004-5 Exploration Objective TSX-V: BNR “Increase Measured & Indicated Resource categories to +4.0 Million Ounces by the end of 2005” Property Measured and Inferred Resource Indicated (Ounces) Resource (Ounces) Twangiza* Oxides 604,626 287,456 5.8MT@3.2g/T 3MT@2.9g/T Sulphides 1,412,574 894,220 24.6

  14. Slide 14: In Conclusion

    In Conclusion TSX-V: BNR • Africa has two major undeveloped gold belts, both in D.R.Congo • The improving political, social and economic climate provides the catalyst for development of this country’s vast natural resources • Banro controls the Twangiza-Namoya gold belt and has a favourable mining c

  15. Slide 15: The Unlocking of Value on Banro's projects in DRC is just beginning

    The Unlocking of Value on Banro’s projects in DRC is just beginning…. TSX-V: BNR Twangiza-Namoya Gold Belt (DR Congo) Ashanti Gold Belt (Ghana) Both maps at same scale www.banro.com 15

  16. Slide 16: Cautionary Note Regarding Forward-Looking Statements

    Cautionary Note Regarding Forward- Looking Statements TSX-V: BNR This presentation contains forward-looking statements that are based on Banro Corporation’s current expectations and estimates. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could