Slide 1: Banro Corporation
Banro Corporation AMEX: BAA “Developing One Of Africa’s Major Gold Belts” D.R. Congo DRC Twangiza-Namoya Gold Belt INDABA Mining Conference February 2006 Simon Village - Chairman 1 www.banro.com
Slide 2: Cautionary Note Regarding Forward-Looking Statements
Cautionary Note Regarding Forward- Looking Statements AMEX: BAA This presentation contains forward-looking statements that are based on Banro Corporation’s current expectations and estimates. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could
Slide 3: Exploration Success
Exploration Success Despite a recovery in Exploration Expenditure, Success AMEX: BAA has been limited, and the trend of discovery cost for major finds on the increase Major Gold Discoveries vs Total Cost to the Industry 10 $1,200 8 $1,000 Major (>3moz) Discoveries Expenditure $800 (US$Mill) 6 $600 4
Slide 4: Exploration Success
Exploration Success Discoveries have slowed in the past 5 years, with the AMEX: BAA average cost of discovery over this period at US$68/oz Exploration Ounces Discovery Year Spend Discovered Cost/oz (US$Mill) (Mill ozs) (US$Mill) 1991 1,000 15.4 65 1992 839 63.5 13 1993 925 74.4 12 1994 1,200 15.1 79
Slide 5: D.R. Congo
D.R. Congo AMEX: BAA Two of Africa’s largest “known” but undeveloped gold belts are found in the DRC Kilo Moto Gold Belt (Ituri Province) Twangiza-Namoya Gold Belt (Maniema & DRC South Kivu Provinces) ...and improved risk/reward ratios are stimulating focus on the region 5 www.banro.com
Slide 6: www.banro.com
(sais eal AMEX: BAA www.banro.com
Slide 7: Banro's Twangiza-Namoya Gold Belt
Banro’s Twangiza-Namoya Gold Belt AMEX: BAA A 210 km long gold belt with historical production of over 2.4 Million Ounces Four significant projects, with separate exploitation concessions all with mining conventions and 8mozs delineated to date Excellent potential to outline open pit resources
Slide 8: Twangiza Project
Twangiza Project AMEX: BAA 692000 mE 694000 mE Total Mineral Resources of 3.2 Million Ounces delineated from N only 20% of the total mineralized trend M’CHITERA Exploration along strike has 9686000 mN 9686000 mN identified extension of the LUKUGURHA mineralisation, with significant soil anomalie
Slide 9: Twangiza Project – Additional Exploration Potential
Twangiza Project – Additional Exploration Potential AMEX: BAA N BUGOY MUFWA Potential for Centralised Plant TWANGIZA Legend: Prospect Granite Intrusive Shale Conglomerate TSHONDO 0 2 Km. 9 www.banro.com
Slide 10: Lugushwa Project
Lugushwa Project “Significant potential along mineralised trend” AMEX: BAA Historical production of 460,000 oz Abnormally high grade alluvials shedding from a series of prominent ridges with extensive artisanal activity Initial exploration focus on D18/19, G20/21 & G7 Mapale Mineralised zones
Slide 11: Lugushwa Project - Initial exploration
Lugushwa Project - Initial exploration has discovered new mineralised zones AMEX: BAA Trench results 594000 mE 598000 mE 596000 mE N 9628000 mN 9628000 mN G20/21 Prospect - 99m @4.39g/t (incl. 47m @6.24g/t) - 84m @1.97g/t (incl. 20m @3.9g/t) 9626000 mN 9626000 mN - 70.5m @4.90g/t - 93m @2.24g/t MA
Slide 12: Namoya Project
Namoya Project AMEX: BAA Gold mineralization Recent drilling results : - associated with sub- vertical quartz veins and Width (m) Grade (g/t) From (m) Including stock-works associated with 7.98 38.63 144.40 “jogs” along 2.5km shear zone 15.74 7.46 47.34 Historical data including 9.43 8.25 99.57
Slide 13: Namoya Project – Drilling to upgrade & expand resource
Namoya Project – Drilling to upgrade & expand resource AMEX: BAA Mwendamboko Muviringu Confirmation and extension drilling is expected to be completed Q1 ’06, resulting in Kakula resource upgrade Inferred Shear Zone Ridge & spur sampling has Namoya Summit delineated parallel trend which will be
Slide 14: Kamituga Project
Kamituga Project AMEX: BAA Historical Production of 1.5 Moz from alluvials and hard rock. Primary mineralisation of shallow dipping sheeted quartz veins and stock works Open pit and U/G potential for disseminated wall rock mineralisation Evaluation to commence Q2 ‘06 Kamituga Inferred Resource T
Slide 15: Exploration Program Status
Exploration Program Status AMEX: BAA Project Ground works Drilling Resource Pre-feas. (Gridding/soil Upgrade sampling / trenching) Namoya Ongoing Commenced Q1 ’06-Q2 ’06 Q4 ’06 Lugushwa Ongoing Commenced Q3 ’06 Q4 ’06 Twangiza Ongoing Commenced H2 ‘06 Q4 ‘06 Notes: * Justification for drill program
Slide 16: A Board with Proven Track Records in Africa & in Gold
A Board with Proven Track Records in Africa & in Gold AMEX: BAA Simon Village, Chairman Former: Managing Director World Gold Council & Managing Director HSBC; Founding Director of Exchange Traded Gold Peter Cowley, President & CEO Former M.D. of Ashanti Exploration and Technical Director of Cluf
Slide 17: A Management Team with Depth & strong Technical Expertise
A Management Team with Depth & strong Technical Expertise AMEX: BAA Mike Skead, V.P Exploration Former Expl. Manager of Samax Resources and Ashanti Goldfields Dan Bansah, Mineral Resources Manager Former Minerals Resource Manager of Ashanti Goldfields Howard Fall, Chief Geologist Former Expl. Ma
Slide 18: Corporate Information
Corporate Information (As of February 2006) AMEX: BAA Based in Toronto and listed on: TSX: BAA AMEX: BAA Shares (millions) Issued 32.65 Fully Diluted 37.06 Shareholders Management 13% Retail 20% Institutional 67% Adjusted Market Cap US$317Million Cash US$26Million Note: Adjus