TSX: MNB, ASX: MBN
Ordinary shares outstanding: 127,776,100
PERTH, Australia, April 28 /CNW/ - Mirabela Nickel Limited (TSX: MNB, ASX: MBN) is pleased to announce further outstanding drilling results that extend mineralization in the Southern High Grade zone of its Santa Rita project.
Composite results from the Southern High Grade zone
-------------------------------------------------------------------------
Composite
downhole
Hole ID From (m) width (m) Ni%
-------------------------------------------------------------------------
MBS-499 471 158 0.76
MBS-508 370 115 0.78
MBS-522 388 121 0.76
MBS-523 426 84 0.73
MBS-532 778 142 0.85
MBS-534 381 101 0.69
-------------------------------------------------------------------------
0.4% Ni cut off grade, 4m minimum mining width
These are the results of all new holes drilled in the Southern High Grade zone. The average composite intersection is 120m at 0.77% Ni. The holes test the depth extensions of this zone across 6 sections, a strike length of 230m. The true widths in this zone are estimated to be about 90% of the down-hole widths.
These holes were mostly designed to convert inferred resource just below the current open pit reserve to indicated resource, enabling further extensions of the in-pit reserves. These results will significantly improve the width and grade of the resource in this area. It appears that the Southern High Grade zone is becoming longer (more strike), wider, and more consistent with depth. Cross sections showing these intersections will be posted on the Company's website shortly.
MBS 532 is of particular interest. This hole recorded a composite intersection of 142m at 0.85% Ni, one of the best intersections ever recorded at Santa Rita. It was drilled 300m down dip (deeper) than any previous holes, on a central section of the Southern High Grade zone. This hole demonstrates the potential continuity of the resource at depth. This is further reinforced by a more recent hole at similar depth to MBS 532, located 105m to the north, with visual observations of over 100m of good mineralisation (assays pending).
Remaining Southern Zone
Drilling also continued in other parts of the Southern zone, where mineralization continues to meet expectations. New results are as follows:
Composite drilling results from the remaining Southern zone
-------------------------------------------------------------------------
Composite
downhole
Hole ID From (m) width Ni%
-------------------------------------------------------------------------
MBS-486 447 86 0.51
MBS-512 282 51 0.66
MBS-527 463 27 0.74
MBS-530 277 22 0.65
-------------------------------------------------------------------------
0.4% Ni cut off grade, 4m minimum mining width
These are good results that will further extend the open-pit limits in these areas. The average true width of mineralization for these remaining Southern zone results is about 80% of the down-hole width.
Southern deeps drilling program
A further 6 holes are drilled and awaiting assays, 3 holes are in progress, and only 3 holes remain to be drilled to complete the current Southern deeps program. A new in-pit resource calculation will be undertaken immediately upon completion of these holes and return of assays, now expected to be completed by July.
Additionally, a new deeper program to delineate a potential underground resource is underway with 2 holes drilled and a further 10 holes planned.
More Details
More details of these latest results are provided in Attachments 1 and 2. Schematic long and cross section diagrams with results can be downloaded from http://www.mirabela.com.au/projects_galleries.asp (these may take up to 24 hours after release of this announcement to be finalised and uploaded).
Nick Poll Craig Burton Managing Director Corporate Director
Background
Mirabela Nickel is listed on the Australian and Toronto stock exchanges. With an open-cut mining reserve of 84mt grading 0.61% Ni, Santa Rita is the largest greenfields nickel sulphide discovery in the last 12 years and the third largest open-cut nickel sulphide mining reserve worldwide.
Construction of a nickel sulphide concentrator commenced in November 2007 and is progressing well. The plant is expected to produce 18,500t a year of nickel in a sulphide concentrate from one open-cut mine starting from mid 2009. At this rate of production the project is expected to have a mine life of at least 18 years. Studies are underway to increase nickel production to 25,000t a year.
The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Lauritz Barnes, who is a Member of the Australian Institute of Geoscientists. Lauritz Barnes is a consultant employed by Mirabela Nickel Ltd.
Lauritz Barnes has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserve'. Lauritz Barnes consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
Caution Regarding Forward Looking Statements: There can be no assurance that an expanded mineral resource or reserve will be established at the Santa Rita Project. The forward-looking statements made in this news release are based on assumptions and judgments of management regarding future events and results. Such forward-looking statements involve known and unknown risks, uncertainties, and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any anticipated future results, performance or achievements expressed or implied by such forward-looking statements.
Attachment 1: New significant intersections - Southern zone drilling
(0.4% Ni cut off grade)
-------------------------------------------------------------------------
Downhole
Hole ID From (m) To (m) width Ni% Cu%
-------------------------------------------------------------------------
MBS-486 447 459 12 0.47 0.21
MBS-486 492 556 64 0.52 0.14
MBS-486 578 582 4 0.58 0.16
MBS-486 585 591 6 0.42 0.10
MBS-499 471 475 4 0.42 0.16
MBS-499 480 484 4 0.49 0.23
MBS-499 490 494 4 0.50 0.16
MBS-499 500 591 91 0.76 0.24
MBS-499 600 642 42 0.89 0.26
MBS-499 655 668 13 0.63 0.10
MBS-508 370 374 4 0.41 0.18
MBS-508 398 417 19 0.61 0.20
MBS-508 426 502 76 0.80 0.25
MBS-508 524 540 16 0.97 0.29
MBS-512 282 289 7 0.58 0.20
MBS-512 346 352 6 0.53 0.15
MBS-512 369 381 12 0.62 0.28
MBS-512 422 426 4 0.55 0.15
MBS-512 438 450 12 0.56 0.15
MBS-512 540 550 10 1.02 0.24
MBS-522 388 489 101 0.77 0.23
MBS-522 496 500 4 0.64 0.17
MBS-522 527 532 5 0.44 0.11
MBS-522 537 541 4 0.44 0.29
MBS-522 554 561 7 1.05 0.24
MBS-523 426 459 33 0.77 0.26
MBS-523 467 472 5 0.51 0.18
MBS-523 477 523 46 0.72 0.24
MBS-527 463 467 4 0.42 0.14
MBS-527 497 501 4 0.46 0.12
MBS-527 514 533 19 0.87 0.21
MBS-530 277 281 4 0.64 0.25
MBS-530 289 298 9 0.86 0.36
MBS-530 302 307 5 0.44 0.14
MBS-530 382 386 4 0.48 0.07
MBS-532 778 867 89 0.96 0.27
MBS-532 876 900 24 0.61 0.13
MBS-532 908 915 7 0.70 0.11
MBS-532 924 946 22 0.71 0.15
MBS-534 381 387 6 0.47 0.21
MBS-534 463 492 29 0.63 0.19
MBS-534 497 533 36 0.77 0.24
MBS-534 541 554 13 0.81 0.20
MBS-534 572 585 13 0.65 0.17
MBS-534 594 598 4 0.41 0.04
-------------------------------------------------------------------------
Attachment 2: Drill hole collar locations
-------------------------------------------------------------------------
Survey Hole Azi-
Hole ID Hole type type Easting Northing RL Depth Dip muth
-------------------------------------------------------------------------
MBS-486 Southern Deeps TS 423117 8430310 144 620 -60 270
MBS-499 Southern Deeps TS 423004 8430470 140 677 -60 270
MBS-508 Southern Deeps TS 422920 8430430 138 610 -60 270
MBS-512 Southern Deeps TS 422975 8430230 132 560 -60 270
MBS-522 Southern Deeps TS 422989 8430354 136 631 -60 270
MBS-523 Southern Deeps TS 422779 8430538 151 545 -60 270
MBS-527 Southern Deeps TS 422783 8430610 155 557 -60 270
MBS-530 Southern Deeps TS 422695 8430810 174 470 -60 270
MBS-532 Southern Deeps TS 423405 8430400 138 1022 -60 270
MBS-534 Southern Deeps TS 422851 8430505 145 601 -60 270
-------------------------------------------------------------------------
(1) TS - Total Station Survey Tool