Southern Deeps Drilling at Santa Rita
PERTH, Western Australia, Sept. 28 /CNW/ - Mirabela Nickel Limited (the "Company") (TSX - MNB, ASX - MBN) announced today that the Southern Deeps drilling has produced the best intersections recorded at Santa Rita to date. Drill hole MBS 427 returned a composite intersection of 156m at 0.88% Ni, including a continuous interval of 109m at 0.90% Ni. It is pleasing that after drilling over 400 holes at Santa Rita we are obtaining best ever results. The recent results are:
--------------------------------------
Hole ID From Composite Ni%
(m) downhole
width (m)(1)
--------------------------------------
MBS-427 318 156 0.88
MBS-426 377 96 0.90
MBS-423 288 95 0.53
MBS-422 368 79 0.66
MBS-421 239 82 0.69
MBS-420 142 37 0.57
MBS-419 182 77 0.66
MBS-417 287 26 0.51
MBS-416 248 91 0.68
MBS-415 18 23 0.59
MBS-414 308 66 0.76
MBS-413 170 44 0.47
MBS-412 280 17 0.49
MBS-411 220 103 0.51
MBS-410 246 41 0.48
--------------------------------------
Hole ID From Composite Ni%
(m) downhole
width
--------------------------------------
MBS-409 141 41 0.61
MBS-408 289 34 0.87
MBS-406 161 39 0.74
MBS-404 146 28 0.60
MBS-403 307 20 0.59
MBS-402 114 46 0.45
--------------------------------------
0.4% Ni cut off grade, 4m minimum mining width
High quality mineralization is repeated in drill hole MBS 426 (96m at 0.90% Ni) 30m north of MBS 427. Drill holes MBS 416 (91m at 0.68% Ni), MBS 421 (89m at 0.69% Ni) and MBS 419 (77m at 0.66% Ni) are respectively 45m, 90m and 130m to the south of MBS 427. These results demonstrate a thick, higher grade zone below 200m vertical depth continuous across 5 sections of the Southern zone. Much of this bonanza zone is wider than and below the existing pit model.
Drill holes MBS 411 (103m at 0.51% Ni) and MBS-423 (95m at 0.53% Ni) are also encouraging as they are located at the south end of the Santa Rita body and confirm that good mineralization extends to the southern most extents, particularly below 150m vertical depth. Although the grades are lower in this area the mineralization occurs within the pyroxenite unit which has less non-sulphide nickel and therefore permits a higher nickel recovery.
In light of these recent results further deep drilling is planned for the southern end of the Southern zone. An initial program of 12 drill holes for 5,000m will commence shortly.
To date the southern Central and Southern Deeps drilling programs have returned an outstanding weighted average composite intersection of 62m at 0.70% Ni from 70 drill holes, of which 32 holes are subsequent to the 40% resource upgrade announced in June 2007. There are assays outstanding from another 4 drill holes that are expected within the week whereupon a resource update is scheduled for completion during October and a mineable reserve calculation by late November.
South-East Extension Drilling - Discovery of New Zone of Mineralisation
Drill results from the southern extent of Santa Rita indicated that the mineralized zone bends sharply to the east rather than terminates as previously thought. An initial program of 50 drill holes for 10,000m to target the South-East extension area (and a line of coincident Cu-Ni soil anomalies in the area) is already underway. To date we have drilled 19 holes for 4,000m.
Drilling was re-orientated to the south to better intersect the mineralization in this area which has an east-west strike. Drill holes on 3 sections along 150m of strike have intersected the Santa Rita sequence over 200m southeast of where we previously thought the mineralization terminated. Initial visual sulphide estimates are encouraging. We expect to have first results from the new South-East Extension drilling within 3 weeks.
Peri Peri Exploration -
Drilling at Peri Peri is complete for the time being. The final results from recent drilling are:
---------------------------------------
Hole ID From (m) Composite Ni%
downhole
width(2)
---------------------------------------
MBS-405 206 22 0.56
MBS-407 238 14 0.87
---------------------------------------
0.4% Ni cut off grade; 4m minimum mining width
Attached are further details of the latest drilling results. An updated schematic longsection showing the location of the latest results will be posted on the Company's website www.mirabela.com.au. All assay results were produced by ALS Chemex Laboratories.
Note:
The information in this news release that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Nick Poll, who is a Member of The Australasia Institute of Mining and Metallurgy and a qualified person within the meaning of National Instrument 43-101. Nick Poll is employed by Mirabela Nickel Ltd.
Nick Poll has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserve'. Nick Poll consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
Attachment 1: New significant intersections
- Indicated Resource Drilling
(0.4% Ni cut off grade, 4m minimum mining width)
--------------------------------------------------
Hole ID From To (m) Downhole Ni% Cu%
(m) width(3)
--------------------------------------------------
MBS-402 114 120 6 0.50 0.18
MBS-402 190 194 4 0.40 0.11
MBS-402 234 244 10 0.45 0.14
MBS-402 250 257 7 0.51 0.13
MBS-402 288 293 5 0.46 0.08
MBS-402 298 307 9 0.43 0.06
MBS-402 315 320 5 0.43 0.06
MBS 403 307 313 6 0.50 0.19
MBS 403 353 360 7 0.70 0.22
MBS 403 379 386 7 0.55 0.09
MBS 404 146 156 10 0.40 0.16
MBS 404 299 303 4 0.43 0.09
MBS 404 321 335 14 0.80 0.20
MBS 406 161 168 7 0.58 0.23
MBS 406 226 230 4 0.67 0.17
MBS 406 266 270 4 0.67 0.23
MBS 406 286 292 6 0.63 0.19
MBS 406 327 332 5 0.47 0.09
MBS 406 346 359 13 1.03 0.23
MBS 408 289 293 4 0.62 0.18
MBS 408 328 348 20 1.03 0.19
MBS 408 382 392 10 0.65 0.12
MBS 409 141 145 4 0.48 0.18
MBS 409 180 189 9 0.41 0.14
MBS 409 193 197 4 0.51 0.15
MBS 409 218 242 24 0.73 0.19
MBS 410 246 256 10 0.45 0.14
MBS 410 263 273 10 0.49 0.14
MBS 410 279 288 9 0.46 0.15
MBS 410 314 326 12 0.52 0.15
MBS 411 220 229 9 0.42 0.19
MBS 411 238 260 22 0.44 0.13
MBS 411 270 308 38 0.50 0.15
MBS 411 317 329 12 0.55 0.17
MBS 411 344 362 18 0.65 0.16
MBS 411 366 370 4 0.41 0.06
MBS 412 280 289 9 0.50 0.22
MBS 412 368 372 4 0.57 0.57
MBS 412 389 393 4 0.40 0.06
MBS 413 170 188 18 0.47 0.16
MBS 413 210 230 20 0.48 0.15
MBS 413 273 279 6 0.41 0.12
MBS 414 308 312 4 0.49 0.20
MBS 414 363 399 36 0.76 0.37
MBS 414 415 419 4 0.41 0.04
MBS 414 425 447 22 0.88 0.22
MBS 415 18 23 5 0.46 0.19
MBS 415 33 43 10 0.40 0.11
MBS 415 185 193 8 0.92 0.25
MBS 416 248 253 5 0.54 0.35
MBS 416 265 269 4 0.40 0.15
MBS 416 286 356 70 0.72 0.24
MBS 416 403 410 7 0.62 0.20
MBS 416 434 439 5 0.54 0.17
MBS 417 287 301 14 0.54 0.24
MBS 417 349 353 4 0.51 0.15
MBS 417 394 398 4 0.44 0.12
MBS 417 431 435 4 0.49 0.04
MBS 419 182 193 11 0.47 0.16
MBS 419 219 225 6 0.59 0.19
MBS 419 269 295 26 0.57 0.17
MBS 419 315 320 5 0.40 0.12
MBS 419 352 359 7 0.84 0.30
MBS 419 376 398 22 0.87 0.24
MBS 420 142 146 4 0.41 0.17
MBS 420 230 234 4 0.43 0.12
MBS 420 252 267 15 0.56 0.19
MBS 420 273 287 14 0.68 0.16
MBS 421 239 251 12 0.43 0.17
MBS 421 264 334 70 0.73 0.21
MBS 422 368 372 4 0.54 0.24
MBS 422 444 481 37 0.78 0.21
MBS 422 487 505 18 0.60 0.24
MBS 422 510 530 20 0.50 0.09
MBS 423 288 297 9 0.50 0.16
MBS 423 311 330 19 0.56 0.18
MBS 423 340 344 4 0.47 0.16
MBS 423 350 360 10 0.50 0.16
MBS 423 369 377 8 0.48 0.14
MBS 423 381 426 45 0.54 0.13
MBS 426 377 445 68 1.03 0.34
MBS 426 456 464 8 0.65 0.28
MBS 426 469 485 16 0.53 0.16
MBS 426 491 495 4 0.86 0.25
MBS 427 318 342 24 0.75 0.29
MBS 427 350 459 109 0.90 0.30
MBS 427 463 486 23 0.93 0.32
------------------------------------------------
Attachment 2: New significant intersections
- Peri Peri Exploration Drilling
(0.4% Ni cut off grade)
------------------------------------------------
Hole ID From To (m) Downhole Ni% Cu%
(m) width(4)
------------------------------------------------
MBS 405 206 210 4 0.89 0.11
MBS 405 242 249 7 0.43 0.17
MBS 405 269 280 11 0.53 0.18
MBS 407 238 242 4 0.40 0.08
MBS 407 257 267 10 1.05 0.18
------------------------------------------------
Attachment 3: Drill hole collar locations
-------------------------------------------------------------------------
Survey Hole
Hole ID Hole type type Easting Northing RL Depth Dip Azimuth
-------------------------------------------------------------------------
MBS 402 Southern Deeps TS 422835 8430150 143 320.00 60 270
MBS 403 Southern Deeps TS 422730 8430470 160 451.00 60 270
MBS 404 Southern Deeps TS 422850 8430190 141 361.00 60 270
MBS 405 Peri Peri TS 424404 8432124 135 310.00 60 45
MBS 406 Southern Deeps TS 422840 8430230 143 380.00 60 270
MBS 407 Peri Peri TS 424508 8432086 135 286.00 60 45
MBS 408 Southern Deeps TS 422710 8430505 163 424.00 60 270
MBS 409 Southern Deeps TS 422940 8430110 133 322.00 60 270
MBS 410 Southern Deeps TS 423080 8430030 135 366.30 60 270
MBS 411 Southern Deeps TS 423023 8430070 131 380.00 60 270
MBS 412 Southern Deeps TS 422735 8430540 158 451.00 60 270
MBS 413 Southern Deeps TS 423078 8429990 133 322.00 60 270
MBS 414 Southern Deeps TS 422715 8430650 168 458.85 60 270
MBS 415 Southern Deeps TS 422663 8430190 186 220.00 60 270
MBS 416 Southern Deeps TS 422840 8430355 144 450.00 60 270
MBS 417 Southern Deeps TS 422720 8430610 164 442.00 60 270
MBS 419 Southern Deeps TS 422830 8430270 143 400.00 60 270
MBS 420 Southern Deeps TS 422900 8430150 133 340.00 60 270
MBS 421 Southern Deeps TS 422830 8430310 143 401.00 60 270
MBS 422 Southern Deeps TS 422740 8430730 162 532.00 60 270
MBS 423 Southern Deeps TS 423090 8430070 135 445.00 60 270
MBS 426 Southern Deeps TS 422840 8430430 146 500.00 60 270
MBS 427 Southern Deeps TS 422840 8430400 145 499.00 60 270
-------------------------------------------------------------------------
(1) TS - Total Station Survey Tool
(1) The actual drilling intersections that are comprised in the composite
downhole widths are shown in Attachment 1.
(2) The actual drilling intersections that are comprised in the composite
downhole widths are shown in Attachment 2.
(3) The Company estimates that that true widths are 75% to 80% of the
drilling intersections reported as downhole widths in the table
above.
(4) The Company estimates that that true widths are 75% to 80% of the
drilling intersections reported as downhole widths in the table
above.