/NOT FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR FOR
DISSEMINATION IN THE UNITED STATES./
TSX: MNB, ASX: MBN
PERTH, AUSTRALIA, June 13 /CNW/ - Mirabela Nickel Limited (TSX: MNB, ASX: MBN) is pleased to announce the following drilling results.
Southern Deeps
The Southern Deeps drilling program at the Santa Rita Project continues to return excellent, thick composite intersections. Drill hole MBS 352 returned an outstanding composite intersection of 111m at 0.74% Ni. The recent results are as follows:
-------------------------------------------------------------------------
Hole ID From (m) Composite downhole width Ni%
-------------------------------------------------------------------------
MBS 339(1) 311 55 0.78
MBS 345 100 26 0.59
MBS 349(1) 336 36 0.65
MBS 351 182 49 0.67
MBS 352 207 111 0.74
MBS 353 108 44 0.51
MBS 355 159 93 0.68
MBS 356 148 64 0.51
MBS 358 170 64 0.47
MBS 359 111 38 0.48
-------------------------------------------------------------------------
0.4% Ni cut off grade, 4m minimum mining width
(1) From Central Deeps area
The Southern Deeps drilling extends well beyond the boundaries of the current in-pit resource estimate. The program to date has returned a weighted average composite intersection of 59m grading 0.68% Ni from 19 drill holes. Full details of the latest results are set out in Attachments 1 and 2. Mineralisation in the Southern Deeps tends to be more spread out with an average of 6 separate ore grade intersections per hole compared with 3 per hole in the Northern and Central zones. An updated schematic long section for Santa Rita showing the location of the latest results will be lodged on the Company's website: www.mirabela.com.au.
These results demonstrate that the grade and composite width of mineralisation in the Southern zone improves with depth, as previous shallower drilling in this area produced relatively patchy results. Also, it appears the mineralisation is flatter dipping in the Southern zone, enabling relatively more mineralisation to be accessed by open-cut mining. In addition, the proportion of pyroxenite-hosted mineralization in the Southern zone is higher than in the Central and Northern zones of the resource. This is positive, as the pyroxenite unit has less non-sulphidic nickel than the other types of host mineralization and therefore permits a higher nickel recovery.
Due to these favourable results the Southern Deeps drilling program is to be extended. The Company is planning another 22 holes for 8,500m in the Southern Deeps and the southern half of the Central Deeps.
All samples were collected in accordance with industry standards and were submitted to ALS Chemex Ltd, who has acted as the Company's principal analytical laboratory. Sample preparation was completed in Brazil and ALS Chemex's analytical laboratory in Vancouver, Canada assayed the pulps. Umpire assay checks were also completed by ACME Analytical Laboratory Ltd in Vancouver, Canada.
Peri Peri Exploration
Drilling has recommenced at the Peri Peri target with a new +1,800m drill program underway. The new program will test the reinterpretation of the north-western extent of the body that is coincident with an IP anomaly. Deeper drilling is designed to test the disseminated and matrix style mineralization down dip within the pyroxenite and basement footwall host rocks.
New Santa Rita Resource Estimates
The Company is in the final stages of completing an updated global resource estimate for the Santa Rita deposit and a revised estimate of the optimal resource within open-pit limits. An announcement will be made shortly.
Additional information relating to Mirabela is available on the Company's website at www.mirabela.com.au.
Technical information in this news release has been reviewed by Nick Poll, the Company's Chief Executive Officer. Mr. Poll is a member of the Australasian Institute of Mining and Metallurgy, and has sufficient experience, which is relevant to the style of mineralization and type of deposit under consideration, and to the activity he is undertaking, to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserve' and a Qualified Person in terms of Canadian National Instrument 43-101. Mr. Poll consents to the inclusion of such information in this news release in the form and context in which it appears.
Attachment 1: New significant intersections - Southern and Central Deeps
Drilling
(0.4% Ni cut off grade, 4m minimum mining width)
-------------------------------------------------------------------------
Downhole
Hole ID From (m) To (m) width Ni% Cu%
-------------------------------------------------------------------------
MBS 339 311 358 47 0.84 0.20
MBS 339 363 367 4 0.40 0.06
MBS 339 371 375 4 0.52 0.09
MBS 345 100 104 4 0.46 0.22
MBS 345 177 181 4 0.77 0.19
MBS 345 196 200 4 0.60 0.13
MBS 345 238 242 4 0.57 0.13
MBS 345 279 283 4 0.70 0.14
MBS 345 287 293 6 0.49 0.10
MBS 349 336 355 19 0.81 0.20
MBS 349 359 370 11 0.51 0.10
MBS 349 375 381 6 0.42 0.06
MBS 351 182 207 25 0.58 0.18
MBS 351 218 222 4 0.94 0.25
MBS 351 259 263 4 0.42 0.12
MBS 351 303 314 11 0.78 0.21
MBS 351 331 336 5 0.85 0.16
MBS 352 207 217 10 0.55 0.21
MBS 352 230 236 6 0.60 0.21
MBS 352 241 245 4 0.50 0.18
MBS 352 271 327 56 0.82 0.24
MBS 352 338 353 15 0.85 0.32
MBS 352 377 383 6 0.49 0.12
MBS 352 391 397 6 0.84 0.25
MBS 352 416 424 8 0.49 0.08
MBS 353 108 120 12 0.44 0.16
MBS 353 158 162 4 0.49 0.13
MBS 353 176 181 5 0.60 0.20
MBS 353 203 209 6 0.67 0.19
MBS 353 213 223 10 0.44 0.12
MBS 353 230 237 7 0.52 0.13
MBS 355 159 170 11 0.45 0.19
MBS 355 198 259 61 0.70 0.21
MBS 355 293 297 4 0.44 0.11
MBS 355 316 324 8 0.48 0.12
MBS 355 349 358 9 1.11 0.24
MBS 356 148 159 11 0.42 0.13
MBS 356 182 186 4 0.44 0.12
MBS 356 192 204 12 0.50 0.17
MBS 356 218 229 11 0.49 0.14
MBS 356 233 249 16 0.62 0.20
MBS 356 253 257 4 0.44 0.12
MBS 356 268 274 6 0.53 0.13
MBS 358 170 177 7 0.47 0.19
MBS 358 187 195 8 0.43 0.16
MBS 358 200 210 10 0.47 0.13
MBS 358 216 237 21 0.45 0.12
MBS 358 241 245 4 0.76 0.15
MBS 358 259 273 14 0.44 0.10
MBS 359 111 115 4 0.42 0.19
MBS 359 118 122 4 0.43 0.15
MBS 359 153 161 8 0.41 0.12
MBS 359 234 238 4 0.50 0.14
MBS 359 272 286 14 0.55 0.15
MBS 359 295 299 4 0.50 0.11
-------------------------------------------------------------------------
Attachment 2: Drill hole collar locations
-------------------------------------------------------------------------
Survey Hole
Hole ID Hole type type Easting Northing RL Depth Dip Azimuth
-------------------------------------------------------------------------
MBS 339 Resource TS(1) 422630 8430975 198 391.0 -60 270
MBS 345 Resource TS 422794 8430190 154 310.0 -60 270
MBS 349 Resource TS 422640 8431025 190 391.0 -60 270
MBS 351 Resource TS 422763 8430270 157 352.4 -60 270
MBS 352 Resource TS 422775 8430355 154 424.0 -60 270
MBS 353 Resource TS 422870 8430110 139 352.5 -60 270
MBS 355 Resource TS 422763 8430310 154 372.0 -60 270
MBS 356 Resource TS 422953 8430070 133 400.6 -60 270
MBS 358 Resource TS 423003 8430030 131 400.0 -60 270
MBS 359 Resource TS 422778 8430230 153 352.5 -60 270
-------------------------------------------------------------------------
(1) TS - Total Station Survey Tool