PERTH, Western Australia, June 14 /CNW/ - Mirabela Nickel Limited ("Company") (TSX - MNB, ASX - MBN) is pleased to announce an updated preliminary mining investigation for its Santa Rita nickel sulphide deposit. The updated Potential Mill Feed resource (this is the estimated resource available as mill feed based upon a pit optimisation study) is:
- Measured and Indicated - 69.2 million tonnes grading 0.61% Ni
(925 million lbs)
- Inferred - 6.8 million tonnes grading 0.53% Ni (79 million lbs)
- Indicative strip ratio 7.7:1
The new tonnage of potential mill feed from the Measured and Indicated mineral resource categories combined (69.2mt grading 0.61% Ni) represents an increase of 40% above the previous in-pit Indicated mineral resource (49.5mt grading 0.61% Ni). This substantial increase exceeds expectations and reflects positive results from infill drilling and extensions to the mineral resource, particularly in the southern half.
The larger tonnage of potential mill feed increases the scale and scope of the Santa Rita project. In addition to a likely increase in mine life and throughput rate, a larger project will also improve the economics of a possible smelter at Santa Rita. This resource upgrade will have a positive impact on the bankable feasibility study, the results of which are nearly completed and will be announced shortly. Updated optimisation studies for mine life and throughput rate have already commenced and the Company is proceeding with a smelter scoping study.
Drilling To Date
The following table summarizes the diamond drilling at Santa Rita completed to date:
------------------------------------------------------------------------- Santa Rita resource Drill holes Approx meters drilled ------------------------------------------------------------------------- Previous (Oct 2006) estimate 244 56,000 New (June 2007) estimate 313 73,500 Total resource drilling to date 340 80,000 -------------------------------------------------------------------------
The new resource is based on 313 drill holes compared with 244 holes for the previous mineral resource. A further 27 holes have been drilled since commencement of the resource estimate, but assays were pending at the cut-off date so it was not possible to include them. This includes 8 recent holes that extend the Southern zone deeps with excellent results as recently announced.
The Company believes the recent Southern Deeps results will add further resource within open pit limits. The remainder of recent drilling is for the starter pit, which will convert further Indicated resource to Measured status. Drilling is ongoing with 4 diamond drilling rigs on-site.
Updated Global Mineral Resource
The updated mineral resource estimate for Santa Rita is:
Mineral resource estimate
-------------------------------------------------------------------------
Million Million lbs
Category Tonnes Ni Cu Ni
-------------------------------------------------------------------------
Measured 9.6 0.62% 0.15% 131
-------------------------------------------------------------------------
Indicated 79.4 0.56% 0.14% 979
-------------------------------------------------------------------------
Measured + Indicated 89.0 0.57% 0.14% 1,110
-------------------------------------------------------------------------
Inferred 15.2 0.51% 0.14% 171
-------------------------------------------------------------------------
Weighted average cut-off grade - 0.33% Ni. See Attachment 2 below.
This resource estimate has been independently reviewed by RSG Global Consulting Pty Ltd in accordance with the Australian JORC Code and the Canadian CIM guidelines. For technical details in relation to the calculation of the resources see Attachment 1.
Updated Potential Mill Feed Resource
A scoping level pit optimisation study has been completed for the Santa Rita deposit by independent consultant, Croeser Pty Ltd. This study is based on the current resource estimates, including the Inferred mineral resources. The reader is cautioned that Inferred resources are, by definition, of insufficient confidence to have economic considerations applied that would enable them to be categorised as mineral reserves, and there is no certainty that this preliminary assessment will be realised in respect of such resources. In the present case, the Inferred resources comprise only 9% of the total resource estimate.
Pit optimisations are used to determine a pit shape, a mineral resource available within open-pit limits, and the corresponding economics using assumptions for revenues, costs and recovery. The updated pit optimisation result below has been calculated using the following parameters:
- The latest operating costs from the bankable feasibility work;
- New pit slopes;
- A nickel price of US$6.00/lb; and
- Similar cut-off grades as previously used.
Potential Mill Feed resource estimate (indicative strip ratio 7.7:1)
-------------------------------------------------------------------------
Million Million lbs
Category Tonnes Ni Cu Ni
-------------------------------------------------------------------------
Measured 8.5 0.65% 0.16% 122
-------------------------------------------------------------------------
Indicated 60.7 0.60% 0.15% 803
-------------------------------------------------------------------------
Measured + Indicated 69.2 0.61% 0.15% 925
-------------------------------------------------------------------------
Inferred 6.8 0.53% 0.15% 79
-------------------------------------------------------------------------
Includes 5% ore loss. Weighted average cut-off grade - 0.38% Ni.
See Attachment 2 below.
Preliminary pit optimization and economic studies indicate that this is the preferred Potential Mill Feed resource estimate for the Santa Rita project. This represents an increase in the life of the Santa Rita project by 5 years from 14 years to 19 years.
The resource increase is mostly attributable to wider mineralization in the Central zone deeps and an extension of the resource in the Southern zone. Since the October 2006 resource calculation, the Company has announced favourable drilling results in the Central and Southern zone deeps and the Company is pleased that these results have translated into a substantial uplift in potential mill feed.
There have been two major changes to pit optimization parameters: a reduction in the pit slope angles (negative impact) and an increase in assumed nickel price from US$4.75/lb to $6.00/lb (positive impact). Both changes have a significant impact on the potential mill feed estimate.
Due to the larger pit size and more detailed geotechnical analysis and pit design parameters, the Company has adopted a more conservative position on pit slopes. As a result, the average pit slope angles have been reduced by approximately 5 degrees, which increases the strip ratio.
The increase in assumed nickel price to $6.00/lb is more consistent with the current nickel price outlook and expectations. This allows the project to bear a higher strip ratio, more than offsetting the impact of more conservative pit slopes.
Additional pit optimization results
Additional pit optimization results have been run to understand project risk and economics at different stages of the Santa Rita project. The following potential mill feed tonnages are subsets of the above Potential Mill Feed resource estimate:
Starter Potential Mill Feed (indicative strip 2.9:1)
-------------------------------------------------------------------------
Million Million lbs
Category Tonnes Ni Cu Ni
-------------------------------------------------------------------------
Measured 5.9 0.67% 0.16% 87
-------------------------------------------------------------------------
Indicated 9.7 0.62% 0.15% 132
-------------------------------------------------------------------------
Measured + Indicated 15.6 0.64% 0.15% 219
-------------------------------------------------------------------------
Includes 5% ore loss. Weighted average cut-off grade - 0.38% Ni.
See Attachment 2 below.
Mid Project Potential Mill Feed (indicative strip 4.6:1)
-------------------------------------------------------------------------
Million Million lbs
Category Tonnes Ni Cu Ni
-------------------------------------------------------------------------
Measured + Indicated 37.5 0.60% 0.15% 498
-------------------------------------------------------------------------
Inferred 1.0 0.46% 0.14% 10
-------------------------------------------------------------------------
Includes 5% ore loss. Weighted average cut-off grade - 0.38% Ni.
See Attachment 2 below.
The starter pit demonstrates a higher grade and lower strip in the first 4 years of the project, which assists rapid pay back of capital invested. The middle pit demonstrates the availability of lower strip ratio ore at 4.6:1 for the first approximate 10 years of mine life assuming a production rate of 4mtpa.
Comparison with previous preliminary mining investigations
The following table has been compiled to provide a direct comparison with the October 2006 preliminary mining investigations using the same pit optimization parameters, including the old pit slopes and a nickel price of US$4.75/lb, to generate a pit with the same strip ratio.
Comparison with previously reported estimate of Potential Mill Feed
(indicative strip ratios 5.9:1)
-------------------------------------------------------------------------
June 2007 December 2006
Resource Category estimate estimate % change
-------------------------------------
Tonnes Ni Tonnes Ni
-------------------------------------------------------------------------
Measured + Indicated 67.0 0.62% 49.5 0.61% + 35%
-------------------------------------------------------------------------
Inferred 3.6 0.50% 6.2 0.55%
-------------------------------------------------------------------------
On a like for like basis there has been a 35% increase in potential mill
feed categorised as Measured and Indicated comprising an additional 17.5 mt of
resource.
Potential Mill Feed using lower cut-off grades
Pit optimization studies have looked at the impact of reducing the
weighted average cut-off grade from 0.38% to 0.33% Ni. The results are as
follows:
Potential Mill Feed resource estimate at lower cut-off grades
(indicative strip ratio 6.2:1)
-------------------------------------------------------------------------
Million Million lbs
Category Tonnes Ni Cu Ni
-------------------------------------------------------------------------
Measured 9.6 0.62% 0.15% 131
-------------------------------------------------------------------------
Indicated 72.5 0.56% 0.14% 895
-------------------------------------------------------------------------
Measured + Indicated 82.1 0.57% 0.14% 1,026
-------------------------------------------------------------------------
Inferred 9.5 0.47% 0.13% 98
-------------------------------------------------------------------------
Includes 5% ore loss. Average weighted cut-off grade - 0.33% Ni.
See Attachment 2 below.
This lower cut-off potential mill feed falls within the same pit shape as the higher cut-off potential mill feed. Accordingly, an additional 15.6mt grading 0.35% Ni of low grade mineralization is available for almost no incremental mining cost. Economic modelling indicates this low grade material at surface is cashflow positive and should be stockpiled and processed at the end of the project. Alternatively, this additional material could be used to expand the throughput rate for the project without the need to change the rate of mining.
The addition of this low grade material potentially increases the Santa Rita project life by 4 years to 23 years assuming a 4mtpa throughput rate or, alternatively, an increase in throughput to 4.8 mtpa whilst maintaining the same mining rate.
Extended Deeps drilling program
The Company has commenced an Extended Deeps drilling program to convert the Inferred portions of the Potential Mill Feed resource estimates to Indicated status and to further extend the mineral resource in the Southern Deeps area where drilling is still relatively shallow. This program will comprise about 22 holes for 8,500m and take about 2 months to complete.
The Company intends to convert the Potential Mill Feed resource to a Proven and Probable Reserve upon completion of the Extended Deeps program. Accordingly, finalization of the pit model and scheduling and announcement of a mineable reserve is expected to be completed in about 4 months time. In the meantime, there is sufficient information to conclude the bankable feasibility study for Santa Rita based on the Potential Mill Feed resource.
Increase in concentrator throughput rate now likely
The larger potential mill feed tonnage substantially increases the life of the Santa Rita project, thereby improving the benefits to be obtained from additional capital investment such as an increase in throughput rate for the concentrator and the addition of a smelter.
A preliminary study recently undertaken indicates that for relatively modest additional capital (less than US$10m), the Company should be able to increase throughput of the concentrator to approximately 4.8 mtpa about 12 months after commissioning. Although the initial nameplate capacity of the plant will remain 4 mtpa, it is now likely this throughput increase will become a firm plan as part of the Company's decision to mine.
Smelter study being advanced
The larger potential mill feed tonnage improves the economics of building a smelter on-site. As previously announced, the Company is undertaking a scoping study into building a smelter with capacity of about 150,000 tpa concentrate. The smelter would be commissioned after the concentrator and take advantage of both the strong cash flows and the established infrastructure of the existing project.
The smelter would convert the Santa Rita concentrates grading 12-13% Ni into a matte grading 50-60% Ni, thereby attracting a higher payability and substantially reducing transport costs. Preliminary studies suggest that Ausmelt technology could be used to lower capital and operating costs, particularly at this relatively small scale. It might also provide better operating conditions to handle the MgO in the Santa Rita concentrates.
The Company is working closely with Ausmelt to undertake more detailed studies into this concept and will announce results of this work as they come to hand.
The information in this report that relates to Mineral Resources and Exploration Results is based on information compiled by Lauritz Barnes who is a Member of The Australian Institute of Geoscientists, and Brett Gossage, who is a Member of The Australasia Institute of Mining and Metallurgy. Lauritz Barnes is consultant to Mirabela Nickel Limited. Brett Gossage is the Manager Resources of RSG Global Consulting Pty Ltd, independent resource consultants engaged by Mirabela Nickel Limited.
Lauritz Barnes and Brett Gossage have sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserve' and are each a Qualified Person in accordance with NI 43-101. Lauritz Barnes and Brett Gossage consent to the inclusion in the report of the matters based on their information in the form and context in which it appears.
The information in this report that relates to pit optimization and scheduling studies is based on information compiled by Roselt Croeser who is a Member of The Australasia Institute of Mining and Metallurgy. Roselt Croeser is a consultant to Mirabela Nickel Limited. Roselt Croeser consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
All other technical information in this report has been reviewed by Nicholas Poll, who is a Member of The Australasia Institute of Mining and Metallurgy. Nicholas Poll is the Managing Director of the Company. Nicholas Poll consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
Attachment 1: Technical background on resource estimate
The resource has been classified in accordance with Canadian Institute of Mining, Metallurgy and Petroleum (CIM) guidelines and with reference to the criteria set out in the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code, December 2004). The estimation has been carried out by a Competent Person from the Company and a Competent Person from RSG Global Consulting Pty Ltd (RSG Global) in accordance with the Code and as such is suitable for inclusion in a public report. Also, each is a Qualified Person in accordance with NI 43-101.
In total, the grade interpolation dataset used for the resource estimate consisted of 313 diamond holes. All drill core has been logged in detail for lithological and structural information. Nickel and multi-element assaying has been completed on half core samples using inductively coupled plasma atomic emission spectroscopy (ICP-AES) and inductively coupled plasma mass spectroscopy (ICP-MS) methods with appropriate collectors (for example 30g fire assay for Pd, Pt and Au). All assaying is accompanied by rigorous submission and analysis of QAQC samples. An extensive specific gravity database has been collected by weighing of diamond core in air and water.
The resource model was derived via geological and mineralisation zone modelling of the deposit. Estimation involved the application of Ordinary Kriging in panels of 20m E-W by 25m N-S by 5mRL for Ni, Cu, Co, Pd, Pt, Au, Fe, Mg and S with Uniform Conditioning change of support for Ni only for a base case selective mining unit of 5mE by 10mN by 5mRL. Technique selection was based on the quantity and spacing of available data, and the interpreted controls on, and styles of, mineralisation under review.
Attachment 2: Details on cut-off grades used
A variety of cut off grades are required for each ore type, because they vary in olivine content. Olivine contains non-sulphide nickel that is not recoverable (silicate nickel), so lower olivine content increases nickel recovery and reduces the corresponding cut-off grade. Mineral resource grades reflect the combined sulphide and silicate nickel content, because assay technology is not accurate enough to measure sulphide nickel content alone for mineral resource estimation.
There are four different types of mineralised rock. Each has a different cut-off grade depending on its non-sulphide nickel content. Pyroxenite has a low cut-off grade to reflect low olivine and low non-sulphide nickel content, whereas dunite has a high cut-off grade to reflect high olivine and high non-sulphide nickel content. The table below provides a breakdown of the resource rock types, their associated cut-off grades and a comparison with the previous (October 2006) estimate.
Comparison of cut-off grades between new and previous potential
mill feed tonnages
-------------------------------------------------------------------------
June 2007 October 2006
estimate estimate
---------------------------------------------
Percentage Cut-off Percentage Cut-off
Host rock type composition grade composition grade
-------------------------------------------------------------------------
Pyroxenite 41 0.35% 30 0.35%
Olivine Orthopyroxenite 15 0.40% 32.5 0.40%
Harzburgite 40 0.40% 32.5 0.40%
Dunite 4 0.50% 5 0.50%
Weighted average
cut-off grade 100% 0.38% 100% 0.39%
-------------------------------------------------------------------------
The average cut-off grade for the new resource has been slightly reduced,
compared to the October 2006 resource to reflect an increase in the percentage
composition of pyroxenite from 30% to 41% in the new resource.
In addition, a lower resource cut-off grade has been used as set out
below:
Details for lower cut-off grade
--------------------------------------------------------
Lower cut-off grade
resource
---------------------
Percentage Cut-off
Host rock type composition grade
--------------------------------------------------------
Pyroxenite 41 0.30%
Olivine Orthopyroxenite 15 0.35%
Harzburgite 40 0.35%
Dunite 3 0.45%
Weighted average cut-off grade 100% 0.33%
--------------------------------------------------------