Mirabela Nickel LimitedTSX: MNB

Mirabela Nickel - Quarterly activity report for period ending 31 March 2007

· Issued by Mirabela Nickel Limited via CNW

/NOT FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES FOR

DISSEMINATION IN THE UNITED STATES./

PERTH, Western Australia, May 1 /CNW/ - Mirabela Nickel Limited ("Mirabela") (TSX: MNB, ASX: MBN) announced today its quarterly report for the period ending 31 March 2007:

HIGHLIGHTS

Santa Rita project

-   Bankable feasibility study due for completion in May 2007.
-   Orders placed for long lead-time plant items: SAG mill and Ball mill
-   Further excellent results from infill drilling programs
-   Metallurgical locked-cycle bench tests confirm 67-68% Ni recovery
    with concentrate grade of 14% +
-   Substantial project equity raising nearly complete

Exploration

-   Extension of wide, higher grade mineralisation from the Central zone
    deeps into the Southern zone deeps at Santa Rita.
-   Initial assay results approximately 2km northeast of Santa Rita
    confirms occurrence of nickel sulphides at potentially economic
    grades (Peri Peri project)
-   Drilling commenced at Palestina with initial program of 1600 metres
-   CVRD Inco elects to continue participation in exploration for deeper
    massive sulphide nickel at Santa Rita and Palestina over the next
    year

Corporate

-   Appointment of Mr Nick Sheard and Mr Joe Hamilton as non-executive
    directors
-   Included in Standard & Poor's ASX All Ordinaries Index
-   Commenced trading on the Toronto Stock Exchange (TSX code: MNB) on
    26 March 2007
-   Filed Canadian prospectus to raise up to C$182.85 million
    (A$193.2 million) at C$5.30 (A$5.60) per share

SANTA RITA NICKEL SULPHIDE PROJECT

Santa Rita feasibility study

The bankable feasibility study (BFS) is scheduled for final delivery in May 2007. Most key technical areas of the study have been completed including geology and initial resource estimation, flowsheet development, plant and infrastructure design, tailings storage and management, geotechnical studies, surface and groundwater management, logistics and infrastructure studies, site power requirements, and taxation and commercial regime.

Current BFS activity is focused on the completion of capital and operating cost estimates, additional metallurgical testwork, finalization of mine design and scheduling, and an updated resource estimate based on the significant amount of additional infill drilling completed from October 2006 to present.

In order to confirm the earlier bench scale test results and to simulate the metallurgical performance under conditions of continuous operation, a 'locked cycle test' was performed on a representative composite sample. The test produced a sample containing 14.3% Ni recovering in excess of 67% of the nickel in the ore. This was comparable with the previous bench scale test results which indicated a concentrate grade of 13.5% Ni recovering 68% of the nickel.

A more recent additional locked cycle test has returned good results with recovery of 68.6% Ni, concentrate grade of 14.9% Ni, and Fe:MgO ratio of 3.06. These results provide an excellent base for negotiations of offtake arrangements with smelters. Metallurgical testwork to secure further improvements is ongoing.

As part of an updated 43.101 technical report prepared by RSG Coffey an estimate of capital costs and operating costs was prepared on the basis of an optimal sized 4 Mtpa plant using a conventional flotation processing system. The capital estimate of US$223M includes processing plant, infrastructure, port facilities, environmental commissioning, first fills, spare parts and a 10% contingency. The preliminary plant operating cost is US$6.77 per tonne of ore treated. Mining costs are estimated at US$0.93 per tonne of material mined or US$1.10 per tonne of material mined if a consideration is made for the life of mine capital expenditure on an owner mining fleet.

These capital and operating cost estimates are of a preliminary nature (+/- 30% level of accuracy) and will be subject to adjustment upon completion of the Bankable Feasibility Study (+/-15% level of accuracy).

The grinding circuit is the longest lead time item in the plant procurement and construction schedule, and therefore orders were placed with Outokumpu Technology Pty Ltd on 2 April 2007 for the SAG mill and Ball mill with expected delivery (ex works) of 90 weeks and 85 weeks respectively. This early ordering of the circuit, for a total value of US$21.25 million, will assist in realising the Company's objective of producing nickel in early 2009.

Progress on the Environmental Management Plan and the related economic study remains on track.

The equity component of the Santa Rita project financing is expected to be completed 2 May 2007 (see "Corporate" below.) It is intended that the balance of funds required for capital costs and initial working capital of the Santa Rita project will be secured through debt financing.

Santa Rita Resource

Drill out to define Measured resource in starter pit

The initial drilling programme for a total of 6,500 metres has been completed on schedule, with results consistent with existing interpretations. The programme closed drill spacing from about 40m down to about 20m along 200m of strike length in the part of the Northern zone of the resource which the Company considers the most attractive to provide early production - the conceptual 'starter pit.' A further infill drilling programme for 12,000 metres is underway with the aim of defining a Measured resource of at least 8Mt of resource in the starter pit, and thereby provide a more accurate geological interpretation and increase confidence for mine scheduling and financing.

(See Appendix 1: Measured infill drilling results)

Programme to convert Inferred resource to Indicated status

The infill drilling programme designed to convert 6.2Mt of JORC Inferred category resource to JORC Indicated status continued to return positive results. In the Central zone drill holes MBS 242 (120m @ 0.97%) and MBS 251 (105 m @ 0.79%) achieved the best and fourth best results respectively to date at Santa Rita in terms of width and grade.

In the Southern zone deeps area drill hole MBS 269 (101m at 0.71% Ni) provided confirmation of the extension of Central zone deeps mineralisation into the Southern zone deeps area. Drill hole MBS 279 located on a section 80 metres south of MBS 269 returned a composite downhole width of 98 m at 0.75% Ni thereby demonstrating continuity of this mineralization along strike. Drill holes MBS275 (66m at 0.80% Ni) and MBS 279 (98m at 0.75% Ni) located on the same section confirm the continuity of mineralization down dip, as well as along strike.

The programme has returned a weighted average composite intersection of 69m at 0.75% Ni from 26 holes (results received to date), which is significantly wider and higher grade than the current Inferred resource.

(See Appendix 2: Central/Southern zone Indicated infill drilling)

EXPLORATION

Peri Peri

Initial assay results from the Peri Peri exploration target approximately 2 kilometres northeast of Santa Rita along the intrusion basement contact have confirmed the occurrence of nickel sulphide mineralisation at potentially economic grades. The disseminated sulphide mineralisation is hosted within the steeply dipping pyroxenite unit for over 200m of strike length and as deep as 130m. Disseminated sulphide mineralisation is also found in the basement footwall, although this has a slightly different mineral assemblage and returns a lower assay grade.

(See Appendix 3: Peri Peri exploration drilling)

Palestina

Drilling has commenced at Palestina (25 kilometres south of Santa Rita) with an initial program of 1,600 metres for 7 holes to test coincident IP/geochemical anomalies and Palestina stratigraphy.

CORPORATE

Mirabela completed requirements for admission to the main board of the Toronto Stock Exchange and commenced trading on the TSX on 27 March 2007 under the symbol MNB. The Company is now dual listed on the Toronto and Australian exchanges, and continues to trade on the Australian Securities Exchange under the symbol MBN.

Effective close of trade 16 March 2007 Mirabela was included in the Standard & Poor's/ASX All Ordinaries index.

The Company welcomes two new non-executive directors to its Board. Mr Nick Sheard brings strong corporate and technical experience to Mirabela, having been a senior executive at Inco Limited from late 2003 to 2007 and a director of Canico Resources Corporation from 2003 to 2005. Mr Joe Hamilton has extensive experience in the Toronto financial market and international mining industry, and is currently a director and the CEO of African Copper plc, a copper producer listed on the TSX and AIM.

Cash balances on hand at 31 March 2007 were $23.07 million, as compared to $31.38 million at 31 December 2006. The issue of 1,200,000 shares for proceeds of $2.52 million, representing Tranche 2 of the private placement of 12,500,000 shares announced in December 2006, was completed in February 2007 after shareholder approval was granted at the Company's general meeting held on 31 January 2007.

As at 31 March 2007 the Company had 88,450,000 ordinary shares and a balance of 4,850,000 unlisted options on issue.

On 20 April 2007 pricing of C$5.30 (A$5.60) per share was announced for a public offering of 30,000,000 ordinary shares, with an over-allotment option for a further 4,500,000 shares, by way of a prospectus filed in all provinces of Canada other than Quebec. If the over-allotment is exercised in full gross proceeds of the offering will be C$182.85 million (A$193.2 million) and net proceeds are estimated to be C$173.7 million (A$183.5 million). The offering is scheduled to close on 2 May 2007.

In satisfaction of its existing rights, CVRD Inco may subscribe for up to 10% of the number of shares issued through the offering with such additional shares issued by way of a private placement to CVRD Inco at C$5.30 (A$5.60) per share for gross proceeds of C$18.285 million (A$19.320 million). CVRD Inco has 30 days from 25 April 2007 to exercise this option. Any issuance to CVRD Inco is subject to applicable regulatory approvals.

Additional information relating to Mirabela is available on the company's website at: www.mirabela.com.au.

The securities referred to herein have not been registered under the US Securities Act of 1933 and may not be offered or sold in the United States or to a US person absent registration or an applicable exemption from registration.

Technical information in this news release has been reviewed by Nick Poll, the Company's Chief Executive Officer. Mr. Poll is a member of the Australasian Institute of Mining and Metallurgy, and has sufficient experience, which is relevant to the style of mineralization and type of deposit under consideration, and to the activity he is undertaking, to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserve' and a Qualified Person in terms of Canadian National Instrument 43-101. Mr. Poll consents to the inclusion of such information in this news release in the form and context in which it appears.

The forward-looking statements made in this news release are based on assumptions and judgments of management regarding future events and results. Such forward-looking statements, including but not limited to those with respect to the completion of a feasibility study at the Santa Rita project and construction and development of a processing facility and associated infrastructure for the Santa Rita Project and its capital costs and estimated future production involve known and unknown risks, uncertainties, and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any anticipated future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, among others, the actual market price of nickel, the actual results of current exploration, the availability of adequate finance, the actual results of future mining, processing and development activities, changes in project parameters as plans continue to be evaluated, as well as those factors disclosed in the Company's filed documents.

Appendix 1: Measured infill drilling results

-------------------------------------------------------------------------
                                                 Composite
Hole ID                            From (m)       Downhole          Ni%
                                                   Width
-------------------------------------------------------------------------
MBS 243                               16             40             0.57
MBS 245                                0             66             0.64
MBS 247                               54             21             0.70
MBS 248                              108             42             0.62
MBS 249                               80             73             0.90
MBS 253                              111             76             0.64
MBS 254                               63             41             0.62
MBS 255                               59             46             0.61
MBS 256                               33             64             0.64
MBS 258                                0             90             0.67
MBS 260                               24             61             0.68
MBS 262                                0             21             0.59
MBS 263                               93             59             0.65
MBS 264                                0             28             0.51
MBS 265                              110             59             0.73
MBS 266                               28             44             0.54
MBS 270                               86             28             0.60
MBS 271                              101             55             0.67
MBS 272                               17             18             0.52
MBS 273                               66             48             0.54
MBS 274                               90             52             0.84
MBS 276                               79             71             0.69
MBS 277                               40             91             0.70
MBS 278                              134             39             0.68
MBS 281                               76             56             0.60
MBS 282                               23             71             0.56
MBS 284                               94             28             0.45
MBS 285                               64             72             0.65
MBS 286(x)                             9             84             0.83
MBS 288                              123             31             0.71
MBS 289(x)                             0             29             0.95
MBS 290                               28             42             0.49
MBS 291                               24             14             0.65
MBS 295                               81             66             0.76
MBS 296(x)                            20             37             0.54
MBS 297                               52             70             0.92
MBS 299                                0             25             0.49
MBS 301                               21             61             0.77
MBS 305(x)                            18             93             0.72
MBS 308(x)                             1             49             0.69
MBS 310(x)                             9             69             0.72
-------------------------------------------------------------------------
0.4% Ni cut off grade, 4m minimum mining width
(x) Partly  oxidised intersection



Appendix 2: Central/Southern zone Indicated infill drilling

-------------------------------------------------------------------------
Hole ID                           From (m)   Composite Downhole      Ni%
                                                    Width
-------------------------------------------------------------------------
MBS 242                              267            120             0.97
MBS 244                              267             63             0.63
MBS 246                              178             48             0.53
MBS 250                              164             45             0.57
MBS 251                              306            105             0.79
MBS 252                              204             88             0.74
MBS 257                              269             34             0.77
MBS 259                              211             40             0.61
MBS 261                              235             52             0.81
MBS 267                              127             54             0.58
MBS 268                              198             67             0.89
MBS 269                              166            101             0.71
MBS 275                              138             66             0.80
MBS 279                              188             98             0.75
MBS 280                               62             50             0.68
MBS 283                               92             64             0.78
MBS 292                               83             51             0.73
MBS 294                              154             49             0.67
MBS 304                               83             66             0.54
MBS 306                               53             20             0.51
MBS 311                               48             26             0.46
-------------------------------------------------------------------------
0.4% Ni cut off grade, 4m minimum mining width



Appendix 3: Peri Peri exploration drilling

-------------------------------------------------------------------------
Hole ID                           From (m)   Composite Downhole      Ni%
                                                    Width
-------------------------------------------------------------------------
MBS 302(x)                            29             30             0.56
MBS 307                               57             25             0.57
MBS 312                               24              6             0.46
MBS 322                               36             36             0.62
MBS 325                               40             29             0.74
MBS 329                               96             12             0.45
-------------------------------------------------------------------------
0.4% Ni cut off grade, 4m minimum mining width
(x) Partly oxidised intersection

Mirabela Nickel Limited on 6ix

Earlier from Mirabela Nickel

Later from Mirabela Nickel

All Mirabela Nickel news releases