High Grade Gold Confirmed at Bronzewing South
Filed with ASX · · 16 pages · English
Summary by 6ix AI
Hammer Metals Limited reports high-grade gold mineralisation confirmed at the Bronzewing South project, with initial assays revealing significant gold zones in diamond drill core. The drilling program is ongoing, with follow-up drilling planned to further define the extent of the mineralisation. The company is optimistic about the potential for a significant gold discovery as they continue their drilling efforts.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
In the deck
Story so far
Earlier from Hammer Metals
- Visable Gold Intersected near Boundary of Bronzewing Mine
- Multiple New Gold & Copper Targets Defined at Mount Isa
- Drilling Commences at Bronzewing South Gold Project
- Quarterly Activities/Appendix 5B Cash Flow Report
- Maiden Drilling at Bullrush Detects IOCG Alteration System
Later from Hammer Metals
- Additional Gold Zone Identified at Bronzewing East Target
- September Quarter Activities Report and Appendix 5B
- Follow-up Drilling Planned at Bronzewing South Gold Project
- Ownership Regained over two areas within Mount Isa East JV
- Phase 2 Drilling Program Underway at Bullrush
Follow Hammer Metals into a list and get an email when it puts out news.
Follow Hammer Metals