Maiden Drilling at Bullrush Detects IOCG Alteration System
Filed with ASX · · 16 pages · English
Summary by 6ix AI
Hammer Metals Limited has released an update on its maiden drilling program at the Bullrush Joint Venture, which has detected a favorable IOCG alteration system. The drilling program involved four holes targeting geophysical anomalies and observed copper mineralization, indicating the presence of an IOCG system. The results confirm that the necessary geological conditions for a large-scale IOCG system are present at the site, although economic grades were not intersected.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Earlier from Hammer Metals
- Broad Copper Gold System Discovered at Tourist Zone
- High Ranking Gold Targets to be drilled at Bronzewing South
- Copper - Gold Drilling to Commence at Lex and Tourist Zone
- Strong New Gold and Copper Targets in North Queensland
- IOCG Drilling Begins at Bullrush JV with Sumitomo
Later from Hammer Metals
- Quarterly Activities/Appendix 5B Cash Flow Report
- Drilling Commences at Bronzewing South Gold Project
- Multiple New Gold & Copper Targets Defined at Mount Isa
- Visable Gold Intersected near Boundary of Bronzewing Mine
- High Grade Gold Confirmed at Bronzewing South
Follow Hammer Metals into a list and get an email when it puts out news.
Follow Hammer Metals