Follow-up Drilling Planned at Bronzewing South Gold Project
Filed with ASX · · 19 pages · English
Summary by 6ix AI
Hammer Metals Limited has announced a follow-up drilling program at the Bronzewing South Gold Project, with new targets defined based on recent drilling outcomes. The drilling is expected to resume in late November, focusing on the area between the Eastern and Central Target zones, which shows potential for significant gold resources. Recent drilling results indicated low levels of gold mineralization, but geological features suggest an active mineralized gold system may be present.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Story so far
Earlier from Hammer Metals
- September Quarter Activities Report and Appendix 5B
- Additional Gold Zone Identified at Bronzewing East Target
- High Grade Gold Confirmed at Bronzewing South
- Visable Gold Intersected near Boundary of Bronzewing Mine
- Multiple New Gold & Copper Targets Defined at Mount Isa
Later from Hammer Metals
- Ownership Regained over two areas within Mount Isa East JV
- Phase 2 Drilling Program Underway at Bullrush
- Hammer Expands WA Gold Portfolio with Option on Mt Sefton
- Yandal Gold Drill Program at Orelia North & Bronzewing South
- Copper-Gold Resource Declared at South Hope
Follow Hammer Metals into a list and get an email when it puts out news.
Follow Hammer Metals