Purepoint Uranium Group Inc. · TSXV:PTU

Purepoint Uranium — Investor Presentation (April 2026)

23 slides from Purepoint Uranium's investor presentation, April 2026

  1. Slide 1: Investing in Canada's Uranium Future

    INVESTING IN CANADA’S URANIUM FUTURE Backed by Industry Leaders Built for Large-Scale Exploration TSXV: PTU | OTCQB: PTUUF Q2-2026

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS This presentation contains certain forward-looking information and statements, within the meaning of applicable securities legislation, which are based on the opinions and estimates of management and are subject to a variety of risks and uncertainties and other factors tha

  3. Slide 3: Investing in Canada's Uranium Future

    INVESTING IN CANADA’S URANIUM FUTURE Backed by Industry Leaders, Built for Large-Scale Exploration Trusted Operator & Chosen Partner of Top Industry Players District-Scale Projects in the Most Prolific Areas • Six projects under active joint venture are strategically positioned along well-establishe

  4. Slide 4: Built for Large-Scale Exploration, Backed by Industry Leaders

    INVESTING IN CANADA’S URANIUM FUTURE Built for Large-Scale Exploration, Backed by Industry Leaders TSX Venture: PTU | OTCQB: PTUUF Total Shares Outstanding 79.4 mm Trusted Operator & Chosen Partner of Top Industry Players 52 Week Range $0.85 | $0.175 • Focused on advancing key projects with active j

  5. Slide 5: IsoEnergy Joint Venture

    ISOENERGY JOINT VENTURE Creating a District Scale Opportunity Dorado JV Aurora JV Celeste Block JV • 38,810 hectares • 53,045 hectares • 6,539 hectares with target positioned along the positioned directly east of depth relatively shallow as renowned Larocque Dorado JV Project, situated sandstone thi

  6. Slide 6: Dorado Joint Venture

    DORADO JOINT VENTURE JV with IsoEnergy Ltd. • Drilling has revealed a shallow vertical depth to the unconformity, ranging from just 27 to 133 metres and several highly prospective yet untested zones remain • Historical drilling intersected high-grade basement- hosted uranium mineralization, includin

  7. Slide 7: Dorado JV – Nova Discovery

    DORADO JV – NOVA DISCOVERY 2025 Discovery at the Q48 Target 8.1% STRUCT URE Steeply dipping brittle basement fault zone — Q48 conductor — open along strike and at depth. U₃O₈ TREN D Larocque Trend. Same corridor as over 0.4 m · Hole PG25-07A · within 2.1 m of 1.62% U₃O₈ IsoEnergy's Hurricane deposit

  8. Slide 8: Nova Discovery

    NOVA DISCOVERY Dorado JV Project TSXV: PTU | OTCQB: PTUUF 8

  9. Slide 9: Nova Discovery – Partial Assay Results

    NOVA DISCOVERY Dorado JV Project Partial Assay Results from Drill Holes PG25-04, 05 and 7A Hole ID From (m) To (m) Length (m) % U3O8 Avg. cps Max. cps. PG25-07A 384.3 386.4 2.1 1.62 27,400 110,800 Includes 386.0 386.4 0.4 8.13 96,500 391.8 396.7 4.9 0.52 19,000 92,800 Includes 392.6 392.9 0.3 2.47 5

  10. Slide 10: Winter 2026 Drill Program at Nova Discovery

    WINTER 2026 DRILL PROGRAM AT NOVA DISCOVERY First phase of a broader 2026 program Winter Nova Expansion Program - Q1 2026 • Winter program: 9 drill holes for 5,210m • Six holes intersected uranium mineralization as measured by a Mt. Sopris 2PGA-1000 downhole radiometric probe. Standout intersections

  11. Slide 11: 2026 Winter Program Extended Nova Discovery to 1 km

    2026 WINTER PROGRAM EXTENDED NOVA DISCOVERY TO 1 KM Next Steps: Airborne Mobile MT + Summer Drill Program Hole ID From (m) To (m) Length Avg. CPS Max. CPS NV26-01 462.2 464.6 2.4 830 2,100 466.8 467.4 0.6 610 750 469.1 470.2 1.1 1,800 3,500 NV26-02 415.2 415.8 0.6 1,400 2,000 422.8 423.1 0.3 1,300 1

  12. Slide 12: Hook Lake Joint Venture

    HOOK LAKE JOINT VENTURE Operator: Purepoint HOOK LAKE JV Joint Venture Breakdown Next Steps • Cameco: 39.5% • Orano: 39.5% • Proposed Drilling: 4,850 m between Carter • Purepoint: 21.0% Corridor & Patterson East • Proposed Geophysics in Carter North • As the operator, Purepoint earns a 10% Corridor

  13. Slide 13: Hook Lake Joint Venture

    HOOK LAKE JOINT VENTURE Cameco | Orano | Purepoint HOOK LAKE JV Purepoint’s Spitfire Discovery . • Resource not defined • Results include 10.3% U3O8 over . 10.0 metres . NexGen’s Arrow Deposit . • 2018 PFS • Indicated Resource • 256,600,000 lbs U3O8 • Avg Grade 4.03% U3O8 Paladin’s Triple R Deposit

  14. Slide 14: Hook Lake JV – Carter Corridor

    HOOK LAKE JV Carter Corridor • 25km band of graphitic conductors • Ideal Rock Type • Extremely close to hydrothermal heat source (Clearwater Domain) • Complex, long-lived faulting pattern 2023/2024 Drilling & Identification of the Lightning Zone • 8,042m across 10 holes • 5-800m step outs testing ju

  15. Slide 15: Patterson East Corridor

    PATTERSON EAST CORRIDOR On Trend With NexGen’s Newest High-Grade Discovery Patterson East Corridor • Targeting a 1.2 km band of graphitic conductors • Depth to unconformity 100 to 200m Recent Findings at the Patterson East Corridor • 42,000 m drill program for 2026 currently underway by NexGen, 3.5k

  16. Slide 16: Smart Lake Joint Venture

    SMART LAKE JOINT VENTURE Operator: Purepoint SMART LAKE JV Description Next Steps • 9,860 hectares ~18 km west-northwest of Hook • Follow-up drilling program to be proposed for Lake JV and ~60km south-southwest of Orano’s approval in Q4 2025 former Cluff Lake Mine • Joint Venture Breakdown • Cameco

  17. Slide 17: Smart Lake Joint Venture

    SMART LAKE JOINT VENTURE JV with Cameco Corp. • Geologically connected to the Shea Creek Deposit • The Smart Lake targets represent the southern end of the Saskatoon Lake Conductor: displaced along the Beaty River Fault • Early drilling by the JV partners, intersected basement- hosted uranium minera

  18. Slide 18: Smart Lake Joint Venture – Drilling Begins March 2025

    SMART LAKE JOINT VENTURE Drilling Begins March 2025 Groomes Lake Target Area • Conductors within the Groomes Lake Target strikes north-east which may be favorable for enhance dilation, fluid flow and uranium deposition SMML and FL TEM Survey – completed December 2024: • The survey covered 31.5 line-

  19. Slide 19: Other Projects

    OTHER PROJECTS Denare West Tabbernor Russell South Carson Lake Henday Tower Optioned to 100% Owned 100% Owned 100% Owned 100% Owned 100% Owned • Phase 1 Earn In: • Located at the • Adjoins ValOre • Located 9 km 51% by spending southern edge of Metals Hatchet • Geologically NW of Orano’s $3mm to Nov

  20. Slide 20: Denare West

    Denare West Optioned to Foran Mining Proposed Work: • Results from the airborne EM survey are now being modelled and interpreted with historical datasets to prioritize drill targets • Foran continues to advance the project under a $19 million option agreement TSXV: PTU | OTCQB: PTUUF 20

  21. Slide 21: Tabbernor

    TABBERNOR 100% Owned Current Work: • Commenced September 2025 • 5 hole, 1,500-metre first-pass drill program to test the 57- kilometre-long corridor of graphitic conductors across five priority targets Priority Exploration Targets TSXV: PTU | OTCQB: PTUUF 21

  22. Slide 22: Russell South

    RUSSELL SOUTH 100% Owned Proposed Work: • 2026 exploration plans include a high-resolution airborne magnetic survey, soil geochemistry or ground geophysics with results guiding follow-up diamond drilling TSXV: PTU | OTCQB: PTUUF 22

  23. Slide 23: Stay Informed on News & Events Shaping the Uranium Market

    STAY INFORMED ON NEWS & EVENTS SHAPING THE URANIUM MARKET Contact Us Monthly Uranium Exploration Newsletter Uranium Spotlight Weekly Podcast Chris Frostad President & CEO cfrostad@purepoint.ca T: +1.416.603.8368 Jeanny So Corporate Communications info@jeannyso.com T: +1.647.202.0994 www.purepoint.ca

Purepoint Uranium Group — Investor Presentation (April 2026) on 6ix