Purepoint Uranium Group Inc. · TSXV:PTU

Purepoint Uranium — Investor Presentation (July 2025)

25 slides from Purepoint Uranium's investor presentation, July 2025

  1. Slide 1: Investing in Canada's Uranium Future

    INVESTING IN CANADA’S URANIUM FUTURE Backed by Industry Leaders Built for Large-Scale Exploration TSXV: PTU | OTCQB: PTUUF Q3 - 2025

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS Disclaimer The general information set out in this presentation regarding the uranium market, including but not limited to, the demand and supply of uranium, historical events that affected uranium pricing, the global state of the uranium market and other related informati

  3. Slide 3: Investing in Canada's Uranium Future: Backed by Industry Leaders

    INVESTING IN CANADA’S URANIUM FUTURE Backed by Industry Leaders, Built for Large-Scale Exploration Trusted Operator & Chosen Partner of Top Industry Players District-Scale Projects in the Most Prolific Areas • Six projects under active joint venture are strategically positioned along well-establishe

  4. Slide 4: 2025 Exploration Programs

    2025 EXPLORATION PROGRAMS Operator: Purepoint SMART LAKE JV SMART LAKE JV • Cameco Corp: 73% | Purepoint: 27% DORADO JV • IsoEnergy: 50% | Purepoint: 50% CELESTE BLOCK JV • IsoEnergy: 50% | Purepoint: 50% AURORA JV • IsoEnergy: 50% | Purepoint: 50% TSXV: PTU | OTCQB: PTUUF 4

  5. Slide 5: Dorado Joint Venture

    DORADO JOINT VENTURE JV with IsoEnergy Ltd. • Drilling has revealed a shallow vertical depth to the unconformity, ranging from just 27 to 133 metres and several highly prospective yet untested zones remain • Historical drilling intersected high-grade basement- hosted uranium mineralization, includin

  6. Slide 6: Dorado Joint Venture: 5,300 m Drilling Planned

    DORADO JOINT VENTURE Total of 5,300 m of Drilling Planned Q2/Q40 Grids - completed • Targeting historic, untested airborne geophysical surveys • Two planned 2025 drill holes Q48 Grid - ongoing • Two planned 2025 drill holes Serin Grid • Extension of the Larocque Conductive Corridor • Two holes plann

  7. Slide 7: Q48 Discovery

    Q48 DISCOVERY Dorado JV Project TSXV: PTU | OTCQB: PTUUF 7

  8. Slide 8: Q48 Discovery

    Q48 DISCOVERY Dorado JV Project Hole ID From (m) To (m) Length (m) Avg. cps Max. cps PG25-04 248.7 249.4 0.7 660 1,010 366.0 367.0 1.0 690 810 374.5 275.4 0.9 810 1,050 383.7 387.4 3.7 11,050 74,800 Includes 384.7 385.1 0.4 64,220 PG25-05 296.7 297.7 1.0 790 960 325.0 327.3 2.3 27,750 79,800 Include

  9. Slide 9: Celeste Joint Venture

    CELESTE JOINT VENTURE Drilling Scheduled for Fall 2025 • Near-term efforts will focus on drill testing recent geophysical results on the NE property where sandstone cover is thin, and limited historical drilling has been completed with just one hole drilled since 1989 • Approximately 800 metres in 4

  10. Slide 10: Aurora Joint Venture

    AURORA JOINT VENTURE JV with IsoEnergy Ltd. • An airborne magnetotellurics geophysical survey on the SE portion of the project is planned for 2025 to resolve deep-seated structures targeted for drilling AURORA JV DESCRIPTION • 53,045 hectares positioned directly east of Dorado JV project, situated o

  11. Slide 11: Smart Lake Joint Venture

    SMART LAKE JOINT VENTURE JV with Cameco Corp. • Geologically connected to the Shea Creek Deposit • The Smart Lake targets represent the southern end of the Saskatoon Lake Conductor: displaced along the Beaty River Fault • Early drilling by the JV partners, intersected basement- hosted uranium minera

  12. Slide 12: Smart Lake Joint Venture: Drilling Begins March 2025

    SMART LAKE JOINT VENTURE Drilling Begins March 2025 Groomes Lake Target Area • Conductors within the Groomes Lake Target strikes north-east which may be favorable for enhance dilation, fluid flow and uranium deposition SMML and FL TEM Survey – completed December 2024: • The survey covered 31.5 line-

  13. Slide 13: Hook Lake Joint Venture

    HOOK LAKE JOINT VENTURE Operator: Purepoint HOOK LAKE JV Joint Venture Breakdown Next Steps • Cameco: 39.5% • Orano: 39.5% • Proposed Drilling: 4,850 m between Carter • Purepoint: 21.0% Corridor & Patterson East • Proposed Geophysics in Carter North • As the operator, Purepoint earns a 10% Corridor

  14. Slide 14: Hook Lake Joint Venture

    HOOK LAKE JOINT VENTURE Cameco | Orano | Purepoint HOOK LAKE JV Purepoint’s Spitfire Discovery . • Resource not defined • Results include 10.3% U3O8 over . 10.0 metres . NexGen’s Arrow Deposit • 2018 PFS . • Indicated Resource • 256,600,000 lbs U3O8 • Avg Grade 4.03% U3O8 Paladin’s Triple R Deposit

  15. Slide 15: Hook Lake JV: Carter Corridor

    HOOK LAKE JV Carter Corridor • 25km band of graphitic conductors • Ideal Rock Type • Extremely close to hydrothermal heat source (Clearwater Domain) • Complex, long-lived faulting pattern 2023/2024 Drilling & Identification of the Lightning Zone • 8,042m across 10 holes • 5-800m step outs testing ju

  16. Slide 16: Patterson East Corridor

    PATTERSON EAST CORRIDOR On Trend With NexGen’s Newest High-Grade Discovery Patterson East Corridor • Targeting a 1.2 km band of graphitic conductors • Depth to unconformity 100 to 200m Recent Findings at the Patterson East Corridor • NexGen PCE Discovery: RK-24-183 • 13.5m of 7.8% U3O8 including 0.5

  17. Slide 17: Other Projects

    OTHER PROJECTS Denare West Tabbernor Russell South Carson Lake Henday Tower Optioned to 100% Owned 100% Owned 100% Owned 100% Owned 100% Owned • Phase 1 Earn In: • Located at the • Adjoins ValOre • Located 9 km 51% by spending southern edge of Metals Hatchet • Geologically NW of Orano’s $3mm to Nov

  18. Slide 18: Denare West

    Denare West Optioned to Foran Mining Proposed Work: • Results from the airborne EM survey are now being modelled and interpreted with historical datasets to prioritize drill targets • Foran continues to advance the project under a $19 million option agreement TSXV: PTU | OTCQB: PTUUF 18

  19. Slide 19: Tabbernor

    TABBERNOR 100% Owned Proposed Work: • Summer 2025 exploration plans include prospecting, boulder sampling and soil Priority geochemistry with results Exploration guiding follow-up ground Targets geophysics and diamond drilling TSXV: PTU | OTCQB: PTUUF 19

  20. Slide 20: Russell South

    RUSSELL SOUTH 100% Owned Proposed Work: • Fall 2025 exploration plans include a high-resolution airborne magnetic survey, soil geochemistry or ground geophysics with results guiding follow-up diamond drilling TSXV: PTU | OTCQB: PTUUF 20

  21. Slide 21: Investing in Canada's Uranium Future

    INVESTING IN CANADA’S URANIUM FUTURE Built for Large-Scale Exploration, Backed by Industry Leaders TSX Venture: PTU | OTCQB: PTUUF Total Shares Outstanding 68.9 mm Trusted Operator & Chosen Partner of Top Industry Players 52 Week Range $0.485 | $0.17 • Focused on advancing key projects with active j

  22. Slide 22: Stay Informed on News & Events Shaping the Uranium Market

    STAY INFORMED ON NEWS & EVENTS SHAPING THE URANIUM MARKET Contact Us Monthly Uranium Exploration Newsletter Uranium Spotlight Weekly Podcast Chris Frostad President & CEO cfrostad@purepoint.ca T: +1.416.603.8368 Jeanny So Corporate Communications info@jeannyso.com T: +1.647.202.0994 www.purepoint.ca

  23. Slide 23: Appendix

    <n bi Uranium. ~ 1} Group Inc. 2 aa : 3 a ‘ nT sli ; K ‘A Hy, APPENDIX

  24. Slide 24: Highly Qualified Leadership Team

    HIGHLY QUALIFIED LEADERSHIP TEAM Decades of Experience in the Athabasca Basin Chris Frostad, BBA, CA, CPA – President & CEO and Director Colin Fehr, B.Sc., P.Geo. – Chief Geologist • 35+ years of experience in the development and building a variety of high • 10+ years of exploration and mine site ex

  25. Slide 25: Board of Directors & Officers

    BOARD OF DIRECTORS & OFFICERS Decades of Experience in the Athabasca Basin Allan Beach, BA. LLB – Director and Corporate Secretary Chris Frostad, BBA, CA, CPA - President & CEO and Director • Former partner Fasken Martineau DuMoulin LLP, with over • 35+ years of experience in the development and bui

Purepoint Uranium Group — Investor Presentation (July 2025) on 6ix