Purepoint Uranium Group Inc. · TSXV:PTU
Purepoint Uranium — Investor Presentation (June 2025)
25 slides from Purepoint Uranium's investor presentation, June 2025
Slide 1: Investing in Canada's Uranium Future
INVESTING IN CANADA’S URANIUM FUTURE Backed by Industry Leaders Built for Large-Scale Exploration TSXV: PTU | OTCQB: PTUUF Q2 - 2025
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS Disclaimer The general information set out in this presentation regarding the uranium market, including but not limited to, the demand and supply of uranium, historical events that affected uranium pricing, the global state of the uranium market and other related informati
Slide 3: Investing in Canada's Uranium Future
INVESTING IN CANADA’S URANIUM FUTURE Backed by Industry Leaders, Built for Large-Scale Exploration Trusted Operator & Chosen Partner of Top Industry Players District-Scale Projects in the Most Prolific Areas • Six projects under active joint venture are strategically positioned along well-establishe
Slide 4: Project Generation, Done Properly
PROJECT GENERATION, DONE PROPERLY What Most Call “Generation” Isn’t. Generator Model Criteria Claimed by Many Executed by Purepoint 1. Secures high-quality, tier-one assets • Not just acreage but strategically located ground with real geological potential. Yes Yes 2. Attracts top-tier, well-funded p
Slide 5: The Uranium Bull Market Is Intact
THE URANIUM BULL MARKET IS INTACT Long-Term Strength Over Short-Term Volatility $115.00 Long-Term Strength Short-Term Spot Price Weakness • The Structural Supply Deficit is • Profit-taking & financial market rotation after strong Growing 2023 gains $105.00 ✓ Global mine production < • Utilities secu
Slide 6: 2025 Exploration Programs
2025 EXPLORATION PROGRAMS Operator: Purepoint SMART LAKE JV SMART LAKE JV • Cameco Corp: 73% | Purepoint: 27% DORADO JV • IsoEnergy: 50% | Purepoint: 50% CELESTE BLOCK JV • IsoEnergy: 50% | Purepoint: 50% AURORA JV • IsoEnergy: 50% | Purepoint: 50% TSXV: PTU | OTCQB: PTUUF 6
Slide 7: Smart Lake Joint Venture
SMART LAKE JOINT VENTURE JV with Cameco Corp. • Geologically connected to the Shea Creek Deposit • The Smart Lake targets represent the southern end of the Saskatoon Lake Conductor: displaced along the Beaty River Fault • Early drilling by the JV partners, intersected basement- hosted uranium minera
Slide 8: Smart Lake Joint Venture
SMART LAKE JOINT VENTURE Drilling Begins March 2025 Groomes Lake Target Area • Conductors within the Groomes Lake Target strikes north-east which may be favorable for enhance dilation, fluid flow and uranium deposition SMML and FL TEM Survey – completed December 2024: • The survey covered 31.5 line-
Slide 9: Dorado Joint Venture
DORADO JOINT VENTURE JV with IsoEnergy Ltd. • Drilling has revealed a shallow vertical depth to the unconformity, ranging from just 27 to 133 metres and several highly prospective yet untested zones remain • Historical drilling intersected high-grade basement- hosted uranium mineralization, includin
Slide 10: Dorado Joint Venture
DORADO JOINT VENTURE Drilling Begins Spring 2025 Serin Grid • Extension of the Larocque Conductive Corridor • Two holes planned for Serin Grid area in 2025 Turaco Grid • Priority target due to low gravity / low magnetic response • Four holes planned for Turaco target area in 2025 Q48 Grid • Two plan
Slide 11: Celeste Joint Venture
CELESTE JOINT VENTURE Drilling Scheduled for Fall 2025 • Near-term efforts will focus on drill testing recent geophysical results on the NE property where sandstone cover is thin, and limited historical drilling has been completed with just one hole drilled since 1989 • Approximately 800 metres in 4
Slide 12: Aurora Joint Venture
AURORA JOINT VENTURE JV with IsoEnergy Ltd. • An airborne magnetotellurics geophysical survey on the SE portion of the project is planned for 2025 to resolve deep-seated structures targeted for drilling AURORA JV DESCRIPTION • 53,045 hectares positioned directly east of Dorado JV project, situated o
Slide 13: Hook Lake Joint Venture
HOOK LAKE JOINT VENTURE Operator: Purepoint HOOK LAKE JV Joint Venture Breakdown Next Steps • Cameco: 39.5% • Orano: 39.5% • Proposed Drilling: 4,850 m between Carter • Purepoint: 21.0% Corridor & Patterson East • Proposed Geophysics in Carter North • As the operator, Purepoint earns a 10% Corridor
Slide 14: Hook Lake Joint Venture
HOOK LAKE JOINT VENTURE Cameco | Orano | Purepoint HOOK LAKE JV Purepoint’s Spitfire Discovery . • Resource not defined • Results include 10.3% U3O8 over . 10.0 metres . NexGen’s Arrow Deposit • 2018 PFS . • Indicated Resource • 256,600,000 lbs U3O8 • Avg Grade 4.03% U3O8 Paladin’s Triple R Deposit
Slide 15: Hook Lake JV
HOOK LAKE JV Carter Corridor • 25km band of graphitic conductors • Ideal Rock Type • Extremely close to hydrothermal heat source (Clearwater Domain) • Complex, long-lived faulting pattern 2023/2024 Drilling & Identification of the Lightning Zone • 8,042m across 10 holes • 5-800m step outs testing ju
Slide 16: Patterson East Corridor
PATTERSON EAST CORRIDOR On Trend With NexGen’s Newest High-Grade Discovery Patterson East Corridor • Targeting a 1.2 km band of graphitic conductors • Depth to unconformity 100 to 200m Recent Findings at the Patterson East Corridor • NexGen PCE Discovery: RK-24-183 • 13.5m of 7.8% U3O8 including 0.5
Slide 17: Other Projects
OTHER PROJECTS Denare West Tabbernor Russell South Carson Lake Henday Tower Optioned to 100% Owned 100% Owned 100% Owned 100% Owned 100% Owned • Phase 1 Earn In: • Located at the • Adjoins ValOre • Located 9 km 51% by spending southern edge of Metals Hatchet • Geologically NW of Orano’s $3mm to Nov
Slide 18: Investing in Canada's Uranium Future
INVESTING IN CANADA’S URANIUM FUTURE Built for Large-Scale Exploration, Backed by Industry Leaders TSX Venture: PTU | OTCQB: PTUUF Total Shares Outstanding 64.3 mm Trusted Operator & Chosen Partner of Top Industry Players 52 Week Range $0.40 | $0.17 • Focused on advancing key projects with active jo
Slide 19: Stay Informed on News & Events Shaping the Uranium Market
STAY INFORMED ON NEWS & EVENTS SHAPING THE URANIUM MARKET Contact Us Monthly Uranium Exploration Newsletter Uranium Spotlight Weekly Podcast Chris Frostad President & CEO cfrostad@purepoint.ca T: +1.416.603.8368 Jeanny So Corporate Communications info@jeannyso.com T: +1.647.202.0994 www.purepoint.ca
Slide 20: Appendix
<n bi Uranium. ~ 1} Group Inc. 2 aa : 3 a ‘ nT sli ; K ‘A Hy, APPENDIX
Slide 21: Highly Qualified Leadership Team
HIGHLY QUALIFIED LEADERSHIP TEAM Decades of Experience in the Athabasca Basin Chris Frostad, BBA, CA, CPA – President & CEO and Director Colin Fehr, B.Sc., P.Geo. – Chief Geologist • 35+ years of experience in the development and building a variety of high • 10+ years of exploration and mine site ex
Slide 22: Board of Directors & Officers
BOARD OF DIRECTORS & OFFICERS Decades of Experience in the Athabasca Basin Allan Beach, BA. LLB – Director and Corporate Secretary Chris Frostad, BBA, CA, CPA - President & CEO and Director • Former partner Fasken Martineau DuMoulin LLP, with over • 35+ years of experience in the development and bui
Slide 23: Denare West
Denare West Optioned to Foran Mining Proposed Work: • Results from the airborne EM survey are now being modelled and interpreted with historical datasets to prioritize drill targets • Foran continues to advance the project under a $19 million option agreement TSXV: PTU | OTCQB: PTUUF 23
Slide 24: Tabbernor
TABBERNOR 100% Owned Proposed Work: • Summer 2025 exploration plans include prospecting, boulder sampling and soil Priority geochemistry with results Exploration guiding follow-up ground Targets geophysics and diamond drilling TSXV: PTU | OTCQB: PTUUF 24
Slide 25: Russell South
RUSSELL SOUTH 100% Owned Proposed Work: • Fall 2025 exploration plans include a high-resolution airborne magnetic survey, soil geochemistry or ground geophysics with results guiding follow-up diamond drilling TSXV: PTU | OTCQB: PTUUF 25
Purepoint Uranium Group — Investor Presentation (June 2025) on 6ix