Purepoint Uranium Group Inc. · TSXV:PTU

Purepoint Uranium — Investor Presentation (September 2025)

23 slides from Purepoint Uranium's investor presentation, September 2025

  1. Slide 1: Investing in Canada's Uranium Future

    INVESTING IN CANADA’S URANIUM FUTURE Backed by Industry Leaders Built for Large-Scale Exploration TSXV: PTU | OTCQB: PTUUF Q3 - 2025

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS Disclaimer The general information set out in this presentation regarding the uranium market, including but not limited to, the demand and supply of uranium, historical events that affected uranium pricing, the global state of the uranium market and other related informati

  3. Slide 3: Investing in Canada's Uranium Future

    INVESTING IN CANADA’S URANIUM FUTURE Backed by Industry Leaders, Built for Large-Scale Exploration Trusted Operator & Chosen Partner of Top Industry Players District-Scale Projects in the Most Prolific Areas • Six projects under active joint venture are strategically positioned along well-establishe

  4. Slide 4: Built for Large-Scale Exploration, Backed by Industry Leaders

    INVESTING IN CANADA’S URANIUM FUTURE Built for Large-Scale Exploration, Backed by Industry Leaders TSX Venture: PTU | OTCQB: PTUUF Total Shares Outstanding 78.5 mm Trusted Operator & Chosen Partner of Top Industry Players 52 Week Range $0.58 | $0.175 • Focused on advancing key projects with active j

  5. Slide 5: 2025 Exploration Programs

    2025 EXPLORATION PROGRAMS Operator: Purepoint SMART LAKE JV SMART LAKE JV • Cameco Corp: 73% | Purepoint: 27% DORADO JV • IsoEnergy: 50% | Purepoint: 50% TABBERNOR • Purepoint: 100% Postponed Due to Wildfires CELESTE BLOCK JV • IsoEnergy: 50% | Purepoint: 50% AURORA JV • IsoEnergy: 50% | Purepoint:

  6. Slide 6: IsoEnergy Joint Venture

    ISOENERGY JOINT VENTURE Creating a District Scale Opportunity Dorado JV Aurora JV Celeste Block JV • 38,810 hectares • 53,045 hectares • 6,539 hectares with target positioned along the positioned directly east of depth relatively shallow as renowned Larocque Dorado JV Project, situated sandstone thi

  7. Slide 7: Dorado Joint Venture

    DORADO JOINT VENTURE JV with IsoEnergy Ltd. • Drilling has revealed a shallow vertical depth to the unconformity, ranging from just 27 to 133 metres and several highly prospective yet untested zones remain • Historical drilling intersected high-grade basement- hosted uranium mineralization, includin

  8. Slide 8: Dorado Joint Venture

    DORADO JOINT VENTURE Total of 5,030 m of Drilling Completed 2025 Q48 Grid (Nova Discovery) • Designed to systematically follow-up and fully test the Q48 conductive corridor • 5 drill holes completed for a total of 2,480 metres with a newly discovery zone Q2 Grid • Targeting historic, untested airbor

  9. Slide 9: Q48 Nova Discovery

    Q48 NOVA DISCOVERY Dorado JV Project TSXV: PTU | OTCQB: PTUUF 9

  10. Slide 10: Q48 Nova Discovery

    Q48 NOVA DISCOVERY Dorado JV Project Partial Assay Results from Drill Holes PG25-04, 05 and 7A Hole ID From (m) To (m) Length (m) % U3O8 Avg. cps Max. cps. PG25-07A 384.3 386.4 2.1 1.62 27,400 110,800 Includes 386.0 386.4 0.4 8.13 96,500 391.8 396.7 4.9 0.52 19,000 92,800 Includes 392.6 392.9 0.3 2.

  11. Slide 11: Q48 Nova Discovery

    Q48 NOVA DISCOVERY Dorado JV Project • Assays validate the mineralization first intersected at Q48 hosted in a steeply dipping, brittle basement fault that remains open to the northeast • Further testing this season curtailed by wet ground conditions and wildfire activity in the area • Follow-up dri

  12. Slide 12: Hook Lake Joint Venture

    HOOK LAKE JOINT VENTURE Operator: Purepoint HOOK LAKE JV Joint Venture Breakdown Next Steps • Cameco: 39.5% • Orano: 39.5% • Proposed Drilling: 4,850 m between Carter • Purepoint: 21.0% Corridor & Patterson East • Proposed Geophysics in Carter North • As the operator, Purepoint earns a 10% Corridor

  13. Slide 13: Hook Lake Joint Venture

    HOOK LAKE JOINT VENTURE Cameco | Orano | Purepoint HOOK LAKE JV Purepoint’s Spitfire Discovery . • Resource not defined • Results include 10.3% U3O8 over . 10.0 metres . NexGen’s Arrow Deposit • 2018 PFS . • Indicated Resource • 256,600,000 lbs U3O8 • Avg Grade 4.03% U3O8 Paladin’s Triple R Deposit

  14. Slide 14: Hook Lake JV

    HOOK LAKE JV Carter Corridor • 25km band of graphitic conductors • Ideal Rock Type • Extremely close to hydrothermal heat source (Clearwater Domain) • Complex, long-lived faulting pattern 2023/2024 Drilling & Identification of the Lightning Zone • 8,042m across 10 holes • 5-800m step outs testing ju

  15. Slide 15: Patterson East Corridor

    PATTERSON EAST CORRIDOR On Trend With NexGen’s Newest High-Grade Discovery Patterson East Corridor • Targeting a 1.2 km band of graphitic conductors • Depth to unconformity 100 to 200m Recent Findings at the Patterson East Corridor • 43,000 m drill program currently underway by NexGen, 3.5km east of

  16. Slide 16: Smart Lake Joint Venture

    SMART LAKE JOINT VENTURE Operator: Purepoint SMART LAKE JV Description Next Steps • 9,860 hectares ~18 km west-northwest of Hook • Follow-up drilling program to be proposed for Lake JV and ~60km south-southwest of Orano’s approval in Q4 2025 former Cluff Lake Mine • Joint Venture Breakdown • Cameco

  17. Slide 17: Smart Lake Joint Venture

    SMART LAKE JOINT VENTURE JV with Cameco Corp. • Geologically connected to the Shea Creek Deposit • The Smart Lake targets represent the southern end of the Saskatoon Lake Conductor: displaced along the Beaty River Fault • Early drilling by the JV partners, intersected basement- hosted uranium minera

  18. Slide 18: Smart Lake Joint Venture

    SMART LAKE JOINT VENTURE Drilling Begins March 2025 Groomes Lake Target Area • Conductors within the Groomes Lake Target strikes north-east which may be favorable for enhance dilation, fluid flow and uranium deposition SMML and FL TEM Survey – completed December 2024: • The survey covered 31.5 line-

  19. Slide 19: Other Projects

    OTHER PROJECTS Denare West Tabbernor Russell South Carson Lake Henday Tower Optioned to 100% Owned 100% Owned 100% Owned 100% Owned 100% Owned • Phase 1 Earn In: • Located at the • Adjoins ValOre • Located 9 km 51% by spending southern edge of Metals Hatchet • Geologically NW of Orano’s $3mm to Nov

  20. Slide 20: Denare West

    Denare West Optioned to Foran Mining Proposed Work: • Results from the airborne EM survey are now being modelled and interpreted with historical datasets to prioritize drill targets • Foran continues to advance the project under a $19 million option agreement TSXV: PTU | OTCQB: PTUUF 21

  21. Slide 21: Tabbernor

    TABBERNOR 100% Owned Current Work: • Commenced September 2025 • 5 hole, 1,500-metre first-pass drill program to test the 57- kilometre-long corridor of graphitic conductors across five priority targets Priority Exploration Targets TSXV: PTU | OTCQB: PTUUF 22

  22. Slide 22: Russell South

    RUSSELL SOUTH 100% Owned Proposed Work: • 2026 exploration plans include a high-resolution airborne magnetic survey, soil geochemistry or ground geophysics with results guiding follow-up diamond drilling TSXV: PTU | OTCQB: PTUUF 23

  23. Slide 23: Stay Informed on News & Events Shaping the Uranium Market

    STAY INFORMED ON NEWS & EVENTS SHAPING THE URANIUM MARKET Contact Us Monthly Uranium Exploration Newsletter Uranium Spotlight Weekly Podcast Chris Frostad President & CEO cfrostad@purepoint.ca T: +1.416.603.8368 Jeanny So Corporate Communications info@jeannyso.com T: +1.647.202.0994 www.purepoint.ca

Purepoint Uranium Group — Investor Presentation (September 2025) on 6ix