Purepoint Uranium Group Inc. · TSXV:PTU

Purepoint Uranium — Investor Presentation (September 2026)

27 slides from Purepoint Uranium's investor presentation, September 2026

  1. Slide 1: More Exploration Through Smarter Capital

    MORE EXPLORATION THROUGH SMARTER CAPITAL 10 Projects | 6 Partner-Funded | 4 Wholly-Owned Backed by Industry Leaders | Built for Large-Scale Discovery TSXV: PTU | OTCQB: PTUUF Q3-2026

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS This presentation contains "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking information can generally be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is

  3. Slide 3: Capital-Efficient Structure for Exploration

    CAPITAL-EFFICIENT STRUCTURE FOR EXPLORATION Backed by Industry Leaders, Built for Large-Scale Discovery Trusted Operator & Chosen Partner of Top Industry Players District-Scale Projects in the Most Prolific Areas • Six projects under active joint venture are strategically positioned along well-estab

  4. Slide 4: Investing in Canada's Uranium Future

    INVESTING IN CANADA’S URANIUM FUTURE Built for Large-Scale Exploration, Backed by Industry Leaders TSX Venture: PTU | OTCQB: PTUUF Total Shares Outstanding 82.0 mm Trusted Operator & Chosen Partner of Top Industry Players 52 Week Range $0.85 | $0.305 • Focused on advancing key projects with active j

  5. Slide 5: IsoEnergy Joint Venture

    ISOENERGY JOINT VENTURE Over 100,000 Hectares of Joint Venture Ground with IsoEnergy Dorado JV Aurora JV Celeste Block JV • 41,784 hectares • 53,046 hectares • 6,623 hectares covering positioned along the positioned directly east of portions of conductor renowned Larocque Dorado JV Project, situated

  6. Slide 6: Dorado Joint Venture

    DORADO JOINT VENTURE 50/50 with IsoEnergy Ltd. • Dorado is characterized by ~140 km of graphitic conductors, with significant untested gaps of up to 1,000 metres, presenting exceptional exploration potential • 3 successful target areas tested in 2026: • Q24: PG26-11, the first hole drilled at Q24, i

  7. Slide 7: 2026 Drill Program at Dorado

    2026 DRILL PROGRAM AT DORADO Winter Assays + Summer Follow-Up 2026 Winter Assays Confirm Mineralization at Nova • NV26-05: 1.65% U₃O₈ over 0.3 m at the unconformity • NV26-03A: 0.04% U₃O₈ over 3.9 m, including 0.10% over 0.4 m; separate 0.79% U₃O₈ over 0.4 m 3 Targets 1.65% • Nine winter holes impro

  8. Slide 8: 2026 Winter Program at Nova Discovery

    2026 WINTER PROGRAM AT NOVA DISCOVERY Dorado JV Project 2026 Winter Drill Results Location Map of 2026 Drill Program at Nova Discovery Target Length % U3O8 Max. Hole ID From (m) To (m) U ppm Avg. cps Area (m) cps. Nova NV26-01 467.5 468.4 0.9 118 0.01 2,130 3,380 NV26-02 423.9 424.3 0.4 389 0.05 8,8

  9. Slide 9: 2026 Summer Program at Dorado

    2026 SUMMER PROGRAM AT DORADO Summer Program Adds New Priority Areas Beyond Nova 2026 Summer Downhole Gamma Probe Results Q23 & Q24 Target Areas – Compilation Map Target Hole ID From (m) To (m) Length (m) Avg. CPS Max. CPS Area Q24 PG26-11 281.2 282.8 1.6 1,380 3,210 284.1 291.5 7.4 8,760 50,110 inc

  10. Slide 10: Celeste Block Joint Venture

    CELESTE BLOCK JOINT VENTURE 50/50 with IsoEnergy Ltd. Celeste East: • Shallow unconformity at 50-80 m; 1.5 km of prospective conductor remains untested near historic anomalous uranium intercepts Celeste West: • Historic drilling returned 0.2% U3O8 over 1.8 m at the unconformity with additional targe

  11. Slide 11: Celeste East Joint Venture

    CELESTE EAST JOINT VENTURE 50/50 with IsoEnergy Ltd. Modelling of Conductive Structures from Inverted (resistivity-depth) MobileMT data in 3D View at Celeste East 3D MobileMT modelling defines a broader folded conductive system • Historic east-west conductor now interpreted as part of a larger struc

  12. Slide 12: Aurora Joint Venture

    AURORA JOINT VENTURE 50/50 with IsoEnergy Ltd. Prospective Areas • Airborne VTEM and VTEM Plus surveys have successfully outlined > 80 km of EM conductors within 24 conductive areas • 15 EM conductive zones have been ranked as high- priority exploration targets AURORA JV DESCRIPTION Upcoming Work •

  13. Slide 13: Hook Lake Joint Venture

    HOOK LAKE JOINT VENTURE Operator: Purepoint HOOK LAKE JV Description Next Steps • 28,598 hectares located within the Patterson Uranium District • Proposed Drilling: 4,850 m between Carter Corridor & Patterson East Joint Venture Breakdown • Proposed Geophysics in Carter North • Cameco: 39.5% Corridor

  14. Slide 14: Hook Lake Joint Venture

    HOOK LAKE JOINT VENTURE Cameco | Orano | Purepoint HOOK LAKE JV Purepoint’s Spitfire Discovery . • Resource not defined • Results include 10.3% U3O8 over . 10.0 metres . NexGen’s Arrow Deposit . • 2018 PFS • Indicated Resource • 256,600,000 lbs U3O8 • Avg Grade 4.03% U3O8 Paladin’s Triple R Deposit

  15. Slide 15: Hook Lake Joint Venture

    HOOK LAKE JOINT VENTURE Carter Corridor • 25km band of graphitic conductors • Ideal Rock Type • Extremely close to hydrothermal heat source (Clearwater Domain) • Complex, long-lived faulting pattern 2023/2024 Drilling & Identification of the Lightning Zone • 8,042m across 10 holes • 5-800m step outs

  16. Slide 16: Hook Lake's Patterson Corridor East

    HOOK LAKE’S PATTERSON CORRIDOR EAST On Trend With NexGen’s Newest High-Grade Discovery Patterson Corridor East • Targeting a 1.2 km band of graphitic conductors • Depth to unconformity 100 to 200m Recent Findings at the Patterson Corridor East • 42,000 m drill program for 2026 currently underway by

  17. Slide 17: Hook Lake's Patterson Corridor East

    HOOK LAKE’S PATTERSON CORRIDOR EAST On Trend With NexGen’s Newest High-Grade Discovery Patterson Corridor East ZTEM Apparent Conductivity (90Hz) • Targeting a 1.2 km band of graphitic conductors • Depth to unconformity 100 to 200m Recent Findings at the Patterson Corridor East • 42,000 m drill progr

  18. Slide 18: Smart Lake Joint Venture

    SMART LAKE JOINT VENTURE Operator: Purepoint SMART LAKE JV Description Next Steps • 9,860 hectares ~18 km west-northwest of Hook • Follow-up drilling program to be proposed for Lake JV and ~60 km south-southwest of Orano’s approval in Q4 2026 former Cluff Lake Mine • Joint Venture Breakdown • Cameco

  19. Slide 19: Smart Lake Joint Venture

    SMART LAKE JOINT VENTURE JV with Cameco Corp. • Geologically connected to the Shea Creek Deposits e ak esL m • The Smart Lake targets represent the southern end of r oo the Saskatoon Lake Conductor: displaced along the G Beaty River Fault • Early drilling by the JV partners, intersected basement-hos

  20. Slide 20: Smart Lake Joint Venture

    SMART LAKE JOINT VENTURE Groomes Lake Target ZTEM Apparent Conductivity (90Hz) 2025 Drill Program • 1,264m drilling completed in 3 holes • All three drill holes intersected graphitic shear zones and complex structural features • The central EM conductor hosts the strongest structural Groomes deforma

  21. Slide 21: Denare West Optioned Project to Eldorado Gold

    Denare West Optioned Project to Eldorado Gold | McIlvenna Bay District Option Agreement with Foran Mining (now Eldorado Gold): • Phase 1 Earn In: 51% by spending $3mm to Nov 2027 • Phase 2 Earn In: 29% by spending $3mm 2029 • Phase 3 Earn In: 20% by paying PTU $10mm + 2% NSR • Purchase of NSR clause

  22. Slide 22: Tabbernor

    TABBERNOR 100% Owned District Scale Potential The Tabbernor Fault System • a >1,500-kilometre regional structural zone trending roughly north-south along Saskatchewan’s eastern boundary. • The fault system is long-lived and has experienced multiple periods of reactivation, including during the broad

  23. Slide 23: Tabbernor

    TABBERNOR Refining the District and Advancing for Drilling 2025 drilling validated priority conductors • 1,741 m of diamond drilling across five drillholes • All drill holes intersected graphite, validating the airborne EM signatures 3D structural model completed in 2026 • MobileMT data integrated w

  24. Slide 24: Russell South

    RUSSELL SOUTH 100% Owned – Ready to Drill Mobile MT Completed in 2026: • Mobile MT resolved targets previously masked by shallow conductivity • Shallow conductive layers has absorbed/distorted conventional airborne EM signals • MobileMT penetrated beneath this layer to image the underlying basement

  25. Slide 25: Henday Lake

    Henday Lake At the Crossroads of Nova and the Roughrider Deposit 100% Owned HENDAY LAKE DESCRIPTION Expanded MobileMT survey • 38,810 hectares positioned along the renowned completed in 2026 Larocque conductive corridor (the “Larocque Trend”), HENDAY LAKE DESCRIPTION home to the Hurricane Deposit •

  26. Slide 26: Carson Lake

    Carson Lake 100% Owned on the Northeast Mine Trend Priority Proposed Work • The project covers a historic airborne geophysical EM survey that outlined a strong northeast trending EM conductor ~10km in length CARSON LAKE DESCRIPTION • 3 target areas have been identified for follow up: • 4,972 hectare

  27. Slide 27: Stay Informed About the Uranium Industry

    STAY INFORMED ABOUT THE URANIUM INDUSTRY Contact Us Monthly Uranium Exploration Newsletter Uranium Spotlight White Papers Briefings Monthly Uranium Exploration Newsletter Uranium Spotlight White Papers & Briefings Weekly Uranium Spotlight Podcast A microphone and headphones on a black background Des

Purepoint Uranium Group — Investor Presentation (September 2026) on 6ix