Purepoint Uranium Group Inc. · TSXV:PTU
Purepoint Uranium — Investor Presentation (August 2025)
23 slides from Purepoint Uranium's investor presentation, Aug 19, 2025
Slide 1: Investing in Canada's Uranium Future
INVESTING IN CANADA’S URANIUM FUTURE Backed by Industry Leaders Built for Large-Scale Exploration TSXV: PTU | OTCQB: PTUUF Q3 - 2025
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS Disclaimer The general information set out in this presentation regarding the uranium market, including but not limited to, the demand and supply of uranium, historical events that affected uranium pricing, the global state of the uranium market and other related informati
Slide 3: Investing in Canada's Uranium Future
INVESTING IN CANADA’S URANIUM FUTURE Built for Large-Scale Exploration, Backed by Industry Leaders TSX Venture: PTU | OTCQB: PTUUF Total Shares Outstanding 68.9 mm Trusted Operator & Chosen Partner of Top Industry Players 52 Week Range $0.58 | $0.17 • Focused on advancing key projects with active jo
Slide 4: Backed by Industry Leaders, Built for Large-Scale Exploration
INVESTING IN CANADA’S URANIUM FUTURE Backed by Industry Leaders, Built for Large-Scale Exploration Trusted Operator & Chosen Partner of Top Industry Players District-Scale Projects in the Most Prolific Areas • Six projects under active joint venture are strategically positioned along well-establishe
Slide 5: 2025 Exploration Programs
2025 EXPLORATION PROGRAMS Operator: Purepoint SMART LAKE JV SMART LAKE JV • Cameco Corp: 73% | Purepoint: 27% DORADO JV • IsoEnergy: 50% | Purepoint: 50% CELESTE BLOCK JV • IsoEnergy: 50% | Purepoint: 50% AURORA JV • IsoEnergy: 50% | Purepoint: 50% TSXV: PTU | OTCQB: PTUUF 5
Slide 6: Dorado Joint Venture
DORADO JOINT VENTURE JV with IsoEnergy Ltd. • Drilling has revealed a shallow vertical depth to the unconformity, ranging from just 27 to 133 metres and several highly prospective yet untested zones remain • Historical drilling intersected high-grade basement- hosted uranium mineralization, includin
Slide 7: Dorado Joint Venture
DORADO JOINT VENTURE Total of 5,400 m of Drilling Planned Q2/Q40 Grids - completed • Targeting historic, untested airborne geophysical surveys • 2 drill holes completed for a total of 700 m – assays pending Q48 Grid – completed • Designed to systematically follow-up and fully test the Q48 conductive
Slide 8: Q48 Nova Discovery
Q48 NOVA DISCOVERY Dorado JV Project TSXV: PTU | OTCQB: PTUUF 8
Slide 9: Q48 Nova Discovery
Q48 NOVA DISCOVERY Dorado JV Project Partial Assay Results from Drill Holes PG25-04 and 05 Hole ID From (m) To (m) Length (m) % U3O8 PG25-04 386.3 386.9 0.6 0.96 409.1 409.4 0.4 0.15 PG25-05 328.9 329.9 1.0 2.19 Includes 329.2 329.5 0.3 5.38 399.3 399.6 0.3 0.10 NOTE: Intervals are downhole core len
Slide 10: Q48 Discovery
Q48 DISCOVERY Dorado JV Project TSXV: PTU | OTCQB: PTUUF 10
Slide 11: Celeste Joint Venture
CELESTE JOINT VENTURE Drilling Scheduled for Fall 2025 • Near-term efforts will focus on drill testing recent geophysical results on the NE property where sandstone cover is thin, and limited historical drilling has been completed with just one hole drilled since 1989 • Approximately 800 metres in 4
Slide 12: Aurora Joint Venture
AURORA JOINT VENTURE JV with IsoEnergy Ltd. • An airborne magnetotellurics geophysical survey on the SE portion of the project is planned for 2025 to resolve deep-seated structures targeted for drilling AURORA JV DESCRIPTION • 53,045 hectares positioned directly east of Dorado JV project, situated o
Slide 13: Smart Lake Joint Venture
SMART LAKE JOINT VENTURE JV with Cameco Corp. • Geologically connected to the Shea Creek Deposit • The Smart Lake targets represent the southern end of the Saskatoon Lake Conductor: displaced along the Beaty River Fault • Early drilling by the JV partners, intersected basement- hosted uranium minera
Slide 14: Smart Lake Joint Venture
SMART LAKE JOINT VENTURE Drilling Begins March 2025 Groomes Lake Target Area • Conductors within the Groomes Lake Target strikes north-east which may be favorable for enhance dilation, fluid flow and uranium deposition SMML and FL TEM Survey – completed December 2024: • The survey covered 31.5 line-
Slide 15: Hook Lake Joint Venture
HOOK LAKE JOINT VENTURE Operator: Purepoint HOOK LAKE JV Joint Venture Breakdown Next Steps • Cameco: 39.5% • Orano: 39.5% • Proposed Drilling: 4,850 m between Carter • Purepoint: 21.0% Corridor & Patterson East • Proposed Geophysics in Carter North • As the operator, Purepoint earns a 10% Corridor
Slide 16: Hook Lake Joint Venture
HOOK LAKE JOINT VENTURE Cameco | Orano | Purepoint HOOK LAKE JV Purepoint’s Spitfire Discovery . • Resource not defined • Results include 10.3% U3O8 over . 10.0 metres . NexGen’s Arrow Deposit • 2018 PFS . • Indicated Resource • 256,600,000 lbs U3O8 • Avg Grade 4.03% U3O8 Paladin’s Triple R Deposit
Slide 17: Hook Lake JV
HOOK LAKE JV Carter Corridor • 25km band of graphitic conductors • Ideal Rock Type • Extremely close to hydrothermal heat source (Clearwater Domain) • Complex, long-lived faulting pattern 2023/2024 Drilling & Identification of the Lightning Zone • 8,042m across 10 holes • 5-800m step outs testing ju
Slide 18: Patterson East Corridor
PATTERSON EAST CORRIDOR On Trend With NexGen’s Newest High-Grade Discovery Patterson East Corridor • Targeting a 1.2 km band of graphitic conductors • Depth to unconformity 100 to 200m Recent Findings at the Patterson East Corridor • 43,000 m drill program currently underway by NexGen, 3.5km east of
Slide 19: Other Projects
OTHER PROJECTS Denare West Tabbernor Russell South Carson Lake Henday Tower Optioned to 100% Owned 100% Owned 100% Owned 100% Owned 100% Owned • Phase 1 Earn In: • Located at the • Adjoins ValOre • Located 9 km 51% by spending southern edge of Metals Hatchet • Geologically NW of Orano’s $3mm to Nov
Slide 20: Denare West
Denare West Optioned to Foran Mining Proposed Work: • Results from the airborne EM survey are now being modelled and interpreted with historical datasets to prioritize drill targets • Foran continues to advance the project under a $19 million option agreement TSXV: PTU | OTCQB: PTUUF 20
Slide 21: Tabbernor
TABBERNOR 100% Owned Proposed Work: • Summer 2025 exploration plans include prospecting, boulder sampling and soil Priority geochemistry with results Exploration guiding follow-up ground Targets geophysics and diamond drilling TSXV: PTU | OTCQB: PTUUF 21
Slide 22: Russell South
RUSSELL SOUTH 100% Owned Proposed Work: • Fall 2025 exploration plans include a high-resolution airborne magnetic survey, soil geochemistry or ground geophysics with results guiding follow-up diamond drilling TSXV: PTU | OTCQB: PTUUF 22
Slide 23: Stay Informed on News & Events Shaping the Uranium Market
STAY INFORMED ON NEWS & EVENTS SHAPING THE URANIUM MARKET Contact Us Monthly Uranium Exploration Newsletter Uranium Spotlight Weekly Podcast Chris Frostad President & CEO cfrostad@purepoint.ca T: +1.416.603.8368 Jeanny So Corporate Communications info@jeannyso.com T: +1.647.202.0994 www.purepoint.ca
Purepoint Uranium Group — Investor Presentation (August 2025) on 6ix