Purepoint Uranium Group Inc. · TSXV:PTU
Purepoint Uranium — Investor Presentation (December 2024)
18 slides from Purepoint Uranium's investor presentation, December 2024
Slide 1: Investing in Canada's Uranium Future
INVESTING IN CANADA’S URANIUM FUTURE Built for Large-Scale Exploration Backed by Industry Leaders TSXV: PTU | OTCQB: PTUUF Q4 - 2024
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS Disclaimer The general information set out in this presentation regarding the uranium market, including but not limited to, the demand and supply of uranium, historical events that affected uranium pricing, the global state of the uranium market and other related informati
Slide 3: Backed by Industry Leaders, Built for Large-Scale Exploration
INVESTING IN CANADA’S URANIUM FUTURE Backed by Industry Leaders, Built for Large-Scale Exploration Trusted Operator & Chosen Partner of Top Industry Players District-Scale Projects in the Most Prolific Areas • All projects under joint ventures are strategically positioned along well-established mine
Slide 4: Hook Lake Joint Venture
HOOK LAKE JOINT VENTURE Operator: Purepoint HOOK LAKE JV Joint Venture Breakdown Next Steps • Cameco: 39.5% • Orano: 39.5% • Proposed Drilling: 4,850 m between Carter • Purepoint: 21.0% Corridor & Patterson East • Proposed Geophysics in Carter North • As the operator, Purepoint earns a 10% Corridor
Slide 5: Hook Lake Joint Venture
HOOK LAKE JOINT VENTURE Cameco | Orano | Purepoint HOOK LAKE JV Purepoint’s Spitfire Discovery . • Resource not defined • Results include 10.3% U3O8 over . 10.0 metres . NexGen’s Arrow Deposit • 2018 PFS . • Indicated Resource • 256,600,000 lbs U3O8 • Avg Grade 4.03% U3O8 Fission’s Triple R Deposit
Slide 6: Hook Lake JV
HOOK LAKE JV Carter Corridor • 25km band of graphitic conductors • Ideal Rock Type • Extremely close to hydrothermal heat source Clearwater (Clearwater Domain) Domain Carter • Complex, long-lived faulting pattern Corridor Patterson Corridor 2023/2024 Drilling & Identification of the Lightning Lightn
Slide 7: Patterson East Corridor
PATTERSON EAST CORRIDOR ZTEM Conductivity Background Patterson East Corridor • Targeting a 1.2 km band of graphitic conductors • Depth to unconformity 100 to 200m Recent Findings at the Patterson East Corridor • NexGen PCE Discovery: RK-24-183 • 13.5m of 7.8% U3O8 including 0.5m of 10% U3O8 and 0.5m
Slide 8: Smart Lake Joint Venture
SMART LAKE JOINT VENTURE Operator: Purepoint SMART LAKE JV Description Next Steps • 9,860 hectares ~18 km west-northwest of Hook • Follow-up airborne geophysics and geological Lake JV and ~60km south-southwest of Orano’s field mapping is planned for 2024 calendar former Cluff Lake Mine year with dri
Slide 9: Smart Lake Joint Venture
SMART LAKE JOINT VENTURE JV with Cameco Corp. • Geologically connected to the Shea Creek Deposit • The Smart Lake targets represent the southern end of the “Saskatoon Lake Conductor: displaced along the Beaty River Fault • Early drilling by the JV partners, intersected basement-hosted uranium minera
Slide 10: Groomes Lake Target Area
GROOMES LAKE TARGET AREA Smart Lake Project Groomes Lake Target Area Survey Area • Conductors within the Groomes Lake Target strikes north-east which may be favorable for enhance dilation, fluid flow and uranium deposition SMML and FL TEM Survey – scheduled for December 2024: Proposed Drilling • App
Slide 11: District Scale JV with IsoEnergy
DISTRICT SCALE JV WITH ISOENERGY Operator: Purepoint PTU/ISO JV TSXV: PTU | OTCQB: PTUUF 11
Slide 12: Joint Venture with IsoEnergy (50% - 50%)
JOINT VENTURE WITH ISOENERGY (50% - 50%) Terms of the Joint Venture District-Scale Project • Strategically located in a well established mine corridor with significant resource Purepoint Contribution potential • 2 properties for a total of 49,825 hectares • 40,000,000 pre-consolidation shares • 10:1
Slide 13: District Scale JV with IsoEnergy (50% - 50%)
DISTRICT SCALE JV WITH ISOENERGY (50% - 50%) Operator: Purepoint Edge (7,312 ha) Full Moon (12,575 ha) Turnor Lake (9,706 ha) Geiger (14,658 ha) Red Willow (40,119 ha) Collins Bay Extension (7,525 ha) Joint Venture Size: 98,436 ha North Thorburn (1,706 ha) Madison (1,347 ha) Thorburn Lake (2,802 ha)
Slide 14: Other Projects
OTHER PROJECTS Denare West Tabbernor Russell South Carson Lake Henday Tower Optioned to 100% Owned 100% Owned 100% Owned 100% Owned 100% Owned • Phase 1 Earn In: • Located at the • Adjoins ValOre • Located 9 km 51% by spending southern edge of Metals Hatchet • Geologically NW of Orano’s $3mm to Nov
Slide 15: Investing in Canada's Uranium Future
INVESTING IN CANADA’S URANIUM FUTURE Built for Large-Scale Exploration, Backed by Industry Leaders TSX Venture: PTU | OTCQB: PTUUF Total Shares Outstanding 57.41 mm Trusted Operator & Chosen Partner of Top Industry Players • Focused on advancing key projects with active joint ventures on Options 5.0
Slide 16: Stay Informed on News & Events Shaping the Uranium Market
STAY INFORMED ON NEWS & EVENTS SHAPING THE URANIUM MARKET Contact Us Monthly Uranium Exploration Newsletter Uranium Spotlight Weekly Podcast Chris Frostad President & CEO cfrostad@purepoint.ca T: +1.416.603.8368 Jeanny So Corporate Communications info@jeannyso.com T: +1.647.202.0994 www.purepoint.ca
Slide 17: Highly Qualified Leadership Team
HIGHLY QUALIFIED LEADERSHIP TEAM Decades of Experience in the Athabasca Basin Chris Frostad, BBA, CA, CPA - President & CEO and Director Linda Tong – GIS Specialist • 35+ years of experience in the development and building a variety of • 20+ years of experience in GIS application, GIS development hi
Slide 18: Board of Directors & Officers
BOARD OF DIRECTORS & OFFICERS Decades of Experience in the Athabasca Basin Allan Beach, BA. LLB – Director and Corporate Secretary Chris Frostad, BBA, CA, CPA - President & CEO and Director • Former partner Fasken Martineau DuMoulin LLP, with over • 35+ years of experience in the development and bui
Purepoint Uranium Group — Investor Presentation (December 2024) on 6ix