  1. Slide 1: Global Atomic Corporation: Advancing the Dasa Uranium Project

    GLOBAL ATOMIC CORPORATION Advancing the Dasa Uranium Project in the Republic Of Niger Corporate Presentation NOVEMBER 2023

  2. Slide 2: Disclaimer

    Disclaimer This presentation has been prepared by the Global Atomic Corporation (“Global Atomic” or the “Company”) and includes information from sources believed by management to be reliable. No representation or warranty, expressed or implied, is made as to the accuracy of the information set forth

  3. Slide 3: Low-Carbon Baseload Power & Mineral Recycling

    LOW-CARBON BASELOAD POWER & MINERAL RECYCLING URANIUM Republic of Niger Uranium will fuel the global reactor fleet to generate clean baseload power. HQ Canada Zinc Türkiye ZINC RECYCLING Uranium Niger Iskenderun, Türkiye Zinc concentrate produced by recycling Electric Arc Furnace Dust (EAFD), is a k

  4. Slide 4: Dasa Project: the only greenfield uranium project under development today

    DASA PROJECT the only greenfield 0000 uranium project under development today Opening Blast Ceremony, November 2022 4 TSX: GLO | OTCQX: GLATF | FRA: G12

  5. Slide 5: Dasa is the highest-grade uranium deposit in Africa

    Dasa is the highest- grade uranium deposit in Africa, situated in Niger’s established uranium district 5 TSX: GLO | OTCQX: GLATF | FRA: G12

  6. Slide 6: Global Atomic at a Glance

    GLOBAL ATOMIC AT A GLANCE Highest Grade Deposit: outside of the Athabasca Basin Mining: began November 2022, ramp already at top of ore body Financing: processing plant construction funding in progress Off-takes: uranium sales contracts signed with utilities Updated Mine Plan and Feasibility Study:

  7. Slide 7: Highest Grade Uranium Project in Africa

    HIGHEST GRADE URANIUM PROJECT IN AFRICA Phase 1 Mine Plan represents ≈20% of Dasa’s current Mineral Resource Phase 1: 12 years Dasa Project schematic long-section and hypothetical underground infrastructure Phase 1 – Flank Zone, initial 12 years Phase 2 – Future Mine Development Phase 3 – Surface Mi

  8. Slide 8: 2019 and 2023 Mineral Resource Estimate

    2019 MINERAL RESOURCE ESTIMATE M&I Resources from the 2019 MRE were incorporated into the 2021 Phase 1 Feasibility Study to extract 44Mlb (~20% of the ore body) over 12 years 2023 MINERAL RESOURCE ESTIMATE 2021-2022 16,000-meter drill program converted more Inferred Resources into M&I Updated Feasib

  9. Slide 9: Comparative Grade / Tonnage Report at Varying Cut-Off Grades

    COMPARATIVE GRADE / TONNAGE REPORT AT VARYING CUT-OFF GRADES July 2019 Estimate May 2023 Revised Estimate % Change Uranium Contained Uranium Contained Contained LARGE, HIGH- Cut-Off Category Tonnes (Mt) Content eU3O8 Uranium eU3O8 Tonnes (Mt) Content eU3O8 Uranium Uranium eU3O8 eU3O8 (ppm) Mlbs (ppm

  10. Slide 10: 2021 Feasibility Study Highlights

    2021 FEASIBILITY STUDY HIGHLIGHTS Grade: 5,267 ppm Production & LOM: 44.1 Mlbs U3O8 over first 12 years Annual Production: ~4.5 Mlbs Low Cost: $19.02/lb Cash Cost and $22.13/lb AISC due to high-grade, high recovery rates, ramp access Off-take agreements with North American utilities to 2031 Yellowca

  11. Slide 11: Dasa Mine Phase - Estimated U3O8 Production

    DASA MINE PHASE 1 - ESTIMATED U3O8 PRODUCTION Phase 1 Phase 2 (estimated) 6 INITIAL 5 PRODUCTION 4 PROFILE Millions lbs U3O8 3 2 1 0 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 Source: Dasa Project 2021 Phase 1 Feasibility Study 11 TSX: GLO | OTCQX: GLATF | F

  12. Slide 12: Ramp development for the underground mine is well underway

    Ramp development for the underground mine is well underway Ramp development now exceeds 600 meters 12 TSX: GLO | OTCQX: GLATF | FRA: G12

  13. Slide 13: Surface & underground mine infrastructure is underway

    Surface & underground mine infrastructure is underway 13 TSX: GLO | OTCQX: GLATF | FRA: G12

  14. Slide 14: Significant Catalysts Leading to Uranium Production in 2025

    OUTLOOK SIGNIFICANT CATALYSTS LEADING TO URANIUM PRODUCTION IN 2025 2023 2024 2025 • Q2 new MRE announced • H1 update Feasibility Study • Commission processing plant • Q3 plant civil works begin • Continue underground development • Declare commercial production • Q4 detailed engineering • Complete c

  15. Slide 15: ESG Initiatives Since 2008

    MINE SITE 4.5 km from Camp ESG INITIATIVES SINCE 2008: • Food during droughts CAMP • Medical supplies • Water wells & infrastructure • Education & training • Local, regional and national procurement of goods & services • ESIAs include significant consultation and baseline studies • Development Bank

  16. Slide 16: Operations & ESG

    OPERATIONS & ESG The Dasa Project significant benefits to local economy: • Royalty, tax and fee income to government and utilities • Employment of experienced local workforce • Recruitment of local labor, companies, and procurement • Training and mentorship programs • Support area agricultural initi

  17. Slide 17: CSR / ESG Initiatives Since 2008

    CSR / ESG INITIATIVES SINCE 2008 Global Atomic Corp - CSR / ESG Exploration Construction Ops Initiative 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Food millet x x x x x x x x x x x x x x x sugar x x x x x x x x x x x x x x x rice x x x x x x x x x x x x x x

  18. Slide 18: Strong community relations & social engagement at the Dasa Project

    Strong community relations & social engagement at the Dasa Project

  19. Slide 19: Uranium Supply & Demand

    URANIUM SUPPLY & DEMAND URANIUM DEMAND EXCEEDS SUPPLY Source: Dasa Project Phase I Feasibility Study 19 TSX: GLO | OTCQX: GLATF | FRA: G12

  20. Slide 20: Befesa Silvermet Türkiye

    BEFESA SILVERMET TÜRKİYE • Joint Venture (49%) with Befesa Zinc, the market leader in zinc recycling • Processes EAFD containing 20% to 30% zinc sourced from local steel mills • Produces a 65% to 70% zinc oxide concentrate for sale to smelters • Recovers high grade zinc & removes toxic elements from

  21. Slide 21: Zinc Recycling: JV Production & Profitability

    JV PRODUCTION & PROFITABILITY EAFD Processed (tonnes) Sales - Zinc (000 lbs) Avg. monthly LME Zinc price (US$/lb) ZINC RECYCLING 90,000 80,000 $1.80 $1.60 $1.40 • 44,556 tonnes EAFD processed 70,000 $1.20 60,000 in the first 9 months of 2023 $1.00 50,000 $0.80 • Limited EAFD supply YTD due 40,000 $0

  22. Slide 22: Experienced Independent Board of Directors

    BOARD & MANAGEMENT EXPERIENCED INDEPENDENT BOARD OF DIRECTORS Stephen G. Roman Trace Arlaud Asier Zarraonandia Ayo Dean Chambers Richard Faucher Derek Rance Fergus P. Kerr Founder, Chairman, Independent Independent Independent Independent Independent Independent President and CEO Director Director D

  23. Slide 23: Experienced Executive Team

    BOARD & MANAGEMENT EXPERIENCED EXECUTIVE TEAM Stephen G. Roman Rein A. Lehari Tim Campbell Dr. Santiago Faucher Bob Tait Founder, Chairman, Chief Financial VP ESG & Corporate Chief Technology VP Investor President and CEO Officer Secretary Officer Relations Ex Director and VP Former Valuations & +25

  24. Slide 24: Experienced Niger Management Team

    EXPERIENCED NIGER MANAGEMENT TEAM HQ NIAMEY Moussa Souley | Managing Director Fabian Soyer | Finance Director Maman Issa | Director of Human Resources DASA MINE SITE John Wheeler | Director of Operations & General Manager Daniele Valentino | Deputy Director of Operations & Assistant General Manager

  25. Slide 25: Tight Capital Structure

    TIGHT CAPITAL STRUCTURE Global Atomic Share Price Performance (January 2, 2020 - October 31, 2023) C$421 M Market Capitalization GLO Share Price (CAD) Uranium Juniors Adj. to GLO Base (CAD) TSX Composite Adj. to GLO Base (CAD) C$2.08 202.3 M $5.00 TSX Share Price Shares Issued* As of Oct. 31, 2023 A

  26. Slide 26: Republic of Niger

    REPUBLIC OF NIGER 7th largest global uranium producer 50 years of uranium mining, shipping to global customers 0000 Infrastructure including paved roads, power, water, trained workforce 20% interest in SOMIDA is held by the Republic of Niger 26 TSX: GLO | OTCQX: GLATF | FRA: G12

  27. Slide 27: Thank You!

    THANK YOU! GLOBAL ATOMIC CORPORATION 8 King St E, Suite 1700 Toronto, ON M5C 1B5 +1 416-368-3949 globalatomiccorp.com info@globalatomiccorp.com