  1. Slide 1: Global Atomic Corporation: Advancing the Dasa Uranium Project

    GLOBAL ATOMIC CORPORATION Advancing the Dasa Uranium Project in the Republic of Niger CORPORATE PRESENTATION MAY 2026

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation has been prepared by Global Atomic Corporation (“Global Atomic” or the “Company”) and includes information from sources believed by management to be reliable. No representation or warranty, expressed or implied, is made as to the accuracy of the information set forth her

  3. Slide 3: Near-Term Uranium Production & Mineral Recycling

    NEAR-TERM URANIUM PRODUCTION & MINERAL RECYCLING URANIUM Republic of Niger Uranium will fuel the global reactor fleet to generate clean baseload power. HQ Canada Zinc Türkiye Uranium ZINC RECYCLING Niger Iskenderun, Türkiye Zinc concentrate produced by recycling Electric Arc Furnace Dust (EAFD), is

  4. Slide 4: Dasa Project: The Only Greenfield Uranium Project Under Construction

    DASA PROJECT The Only Greenfield Uranium Project Under Construction 4 TSX: GLO | OTCQX: GLATF | FRA: G12

  5. Slide 5: 2024 Feasibility Study Highlights

    2024 FEASIBILITY STUDY HIGHLIGHTS  Production: 68.1 Mlb U3O8 over 23 years  Reserve Grade: 4,113 ppm; 5,109 ppm in the first 12 years, highest grade outside of the Athabasca Basin  Feasibility Study assumed a base U3O8 price of US$75/lb  Actual production timelines will depend on the timing of p

  6. Slide 6: Value Opportunities: Estimated Production Profile

    ESTIMATED PRODUCTION PROFILE VALUE OPPORTUNITIES Based on 2024 Feasibility Study 5 Development plan includes: Infill drilling targeting 51.4 Mlbs @ 5,349 ppm (Inferred) to convert 4 resources into mineable reserves to sustain ~4 Mlbs/year U₃O₈ production PFS evaluating 2x mill throughput 3 Millions

  7. Slide 7: 2023 Mineral Resource Estimate

    COMPARATIVE GRADE / TONNAGE REPORT AT VARYING CUT-OFF GRADES 2023 MINERAL RESOURCE ESTIMATE May 2023 Revised Estimate eU3O8 (ppm) Tonnes (Mt) eU3O8 Mlbs Contained Uranium Uranium Content Cut-Off Category Indicated 103.6 803 183.5 100 Inferred 71.0 636 99.5 Indicated 44.9 1,602 158.5 320 Inferred 25.

  8. Slide 8: Flank Zone Mine Plan

    FLANK ZONE MINE PLAN Flank Zone Flank Zone Completed Feb 2026 Mar 2026 Apr 2026 Plan - 2026 Plan – 10 years - Ramp and level development advancing to provide stope access on five levels in the Flank Zone. - The Flank Zone will be mined over 10 years prior to entering the main orebody. 8 TSX: GLO | O

  9. Slide 9: Mining Team advancing underground development

    Mining Team advancing underground development 9 TSX: GLO | OTCQX: GLATF | FRA: G12

  10. Slide 10: Processing Plant in progress

    Processing Plant in progress 10 TSX: GLO | OTCQX: GLATF | FRA: G12

  11. Slide 11: Crusher foundation and SAG mill progressing well

    Crusher foundation and SAG mill progressing well 11 TSX: GLO | OTCQX: GLATF | FRA: G12

  12. Slide 12: Civil works in progress - Diesel Generator Electric Room & Generator House

    Civil works in progress - Diesel Generator Electric Room & Generator House 12 TSX: GLO | OTCQX: GLATF | FRA: G12

  13. Slide 13: Plant Workshop foundation completed

    Plant Workshop foundation completed 13 TSX: GLO | OTCQX: GLATF | FRA: G12

  14. Slide 14: Diesel Storage building foundation completed

    Diesel Storage building foundation competed 14 TSX: GLO | OTCQX: GLATF | FRA: G12

  15. Slide 15: Substation #2 and earthworks in progress

    Substation #2 and earthworks in progress 15 TSX: GLO | OTCQX: GLATF | FRA: G12

  16. Slide 16: Main Substation advancing

    Main Substation advancing 16 TSX: GLO | OTCQX: GLATF | FRA: G12

  17. Slide 17: Control Room & Laboratory building

    Control Room & Laboratory building 17 TSX: GLO | OTCQX: GLATF | FRA: G12

  18. Slide 18: Pugging drum and electric transformers loaded for shipment to Dasa

    Pugging drum loaded for shipment to Dasa Electric Transformers loaded for shipment to Dasa 18 TSX: GLO | OTCQX: GLATF | FRA: G12

  19. Slide 19: Earthworks continue around the site

    Earthworks continue around the site 19 TSX: GLO | OTCQX: GLATF | FRA: G12

  20. Slide 20: Rebar bending and installation in progress

    Rebar bending and installation in progress 20 TSX: GLO | OTCQX: GLATF | FRA: G12

  21. Slide 21: New 260-person camp completed

    New 260-person camp completed 21 TSX: GLO | OTCQX: GLATF | FRA: G12

  22. Slide 22: Teamwork around the site

    Teamwork around the site 22 TSX: GLO | OTCQX: GLATF | FRA: G12

  23. Slide 23: ESG Initiatives Since 2008

    ESG INITIATIVES SINCE 2008: • Food during droughts • Medical supplies • Water wells & infrastructure • Education & training • Local, regional and national procurement of goods & services • ESIAs include significant consultation and baseline studies • Development Bank due diligence independently vali

  24. Slide 24: Strong community relations & social engagement at the Dasa Project

    Strong community relations & social engagement at the Dasa Project 24 TSX: GLO | OTCQX: GLATF | FRA: G12

  25. Slide 25: Uranium Demand Exceeds Supply

    URANIUM DEMAND EXCEEDS SUPPLY Source: WNA/Fuel Link 25 TSX: GLO | OTCQX: GLATF | FRA: G12

  26. Slide 26: Befesa Silvermet, Türkiye

    BEFESA SILVERMET, TÜRKİYE • Joint Venture (49%) with Befesa Zinc, the market leader in zinc recycling • Processes EAFD containing 20% to 30% zinc sourced from local steel mills • Produces a 65% to 70% zinc oxide concentrate for sale to smelters • Recovers high grade zinc & removes toxic elements fro

  27. Slide 27: Zinc Recycling: JV Production & Profitability

    JV PRODUCTION & PROFITABILITY ZINC RECYCLING EAFD Processed (tonnes) Sales - Zinc (000 lbs) Avg. monthly LME Zinc price (US$/lb) • New Plant loan retired. 90,000 $1.80 80,000 $1.60 • Improved availability of the 70,000 $1.40 operation’s primary feedstock— 60,000 $1.20 electric arc furnace dust (EAFD

  28. Slide 28: Capital Structure

    CAPITAL STRUCTURE Global Atomic Share Price Performance (January 2, 2020 - April 30, 2026) C$387 M Market Capitalization C$0.79 490.3 M GLO Share Price (CAD) Uranium Juniors Adj. to GLO Base (CAD) TSX Composite Adj. to GLO Base (CAD) $7.00 TSX Share Price Shares Issued* As of April 30, 2026 As of Ap

  29. Slide 29: Fueling a Low-Carbon Future

    FUELING A LOW-CARBON FUTURE GLOBAL ATOMIC CORPORATION 8 King St E, Suite 1700 Toronto, ON M5C 1B5 +1 416-368-3949 globalatomiccorp.com info@globalatomiccorp.com 29 TSX: GLO | OTCQX: GLATF | FRA: G12

Global Atomic — Investor Presentation (May 2026) on 6ix