Global Atomic Corporation · TSX:GLO

Global Atomic — Investor Presentation (September 2026)

27 slides from Global Atomic's investor presentation, September 2026

  1. Slide 1: Global Atomic Corporation: Advancing the Dasa Uranium Project

    GLOBAL ATOMIC CORPORATION Advancing the Dasa Uranium Project in the Republic of Niger CORPORATE PRESENTATION SEPTEMBER 2026

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation has been prepared by Global Atomic Corporation (“Global Atomic” or the “Company”) and includes information from sources believed by management to be reliable. No representation or warranty, expressed or implied, is made as to the accuracy of the information set forth her

  3. Slide 3: Near-Term Uranium Production & Mineral Recycling

    NEAR-TERM URANIUM PRODUCTION & MINERAL RECYCLING URANIUM Republic of Niger Uranium will fuel the global reactor fleet to generate clean baseload power. HQ Canada Zinc Türkiye Uranium ZINC RECYCLING Niger Iskenderun, Türkiye Zinc concentrate produced by recycling Electric Arc Furnace Dust (EAFD), is

  4. Slide 4: Dasa is the highest-grade uranium deposit in Africa

    Dasa is the highest- grade uranium deposit in Africa, situated in Niger’s established uranium district 4 TSX: GLO | OTCQX: GLATF | FRA: G12

  5. Slide 5: Building the highest-grade uranium mine in Africa

    DASA PROJECT Building the highest-grade uranium mine in Africa Mining Team advancing underground development 5 TSX: GLO | OTCQX: GLATF | FRA: G12

  6. Slide 6: 2024 Feasibility Study Highlights

    2024 FEASIBILITY STUDY HIGHLIGHTS ü Production: 68.1 Mlb U3O8 over 23 years ü Reserve Grade: 4,113 ppm; 5,109 ppm in the first 12 years, highest grade outside of the Athabasca Basin ü Feasibility Study assumed a base U3O8 price of US$75/lb ü Actual production timelines will depend on the timing of p

  7. Slide 7: Value Opportunities and Estimated Production Profile

    VALUE OPPORTUNITIES ESTIMATED PRODUCTION PROFILE Based on 2024 Feasibility Study 5 Development plan includes: Infill drilling targeting 51.4 Mlbs @ 5,349 ppm (Inferred) to convert 4 resources into mineable reserves to sustain ~4 Mlbs/year U₃O₈ production 3 PFS evaluating 2x mill throughput Millions

  8. Slide 8: 2023 Mineral Resource Estimate

    COMPARATIVE GRADE / TONNAGE REPORT AT VARYING CUT-OFF GRADES 2023 MINERAL RESOURCE ESTIMATE May 2023 Revised Estimate eU3O8 (ppm) Tonnes (Mt) eU3O8 Mlbs Contained Uranium Uranium Content Cut-Off Category Indicated 103.6 803 183.5 100 Inferred 71.0 636 99.5 Indicated 44.9 1,602 158.5 320 Inferred 25.

  9. Slide 9: Flank Zone Mine Plan

    FLANK ZONE MINE PLAN Flank Zone Flank Zone Completed Sept 2026 Oct 2026 Nov 2026 Plan - 2026 10-year plan - Ramp and level development advancing to provide stope access on five levels in the Flank Zone. - The Flank Zone will be mined over 10 years prior to Reserve increase potential DFS PHASE 1 Stop

  10. Slide 10: Dasa Project keeps moving forward

    Dasa Project keeps moving forward 10 TSX: GLO | OTCQX: GLATF | FRA: G12

  11. Slide 11: Process Plant in progress

    Process Plant in progress 11 TSX: GLO | OTCQX: GLATF | FRA: G12

  12. Slide 12: Sulphur Storage building and Process Plant

    Sulphur Storage building and Process Plant 12 TSX: GLO | OTCQX: GLATF | FRA: G12

  13. Slide 13: Main Electrical Receiving Substation – civil works in progress

    Electrical Substation 1 Electrical Substation 2 Main Electrical Receiving Substation – civil works in progress Electrical Substation 3 13 TSX: GLO | OTCQX: GLATF | FRA: G12

  14. Slide 14: Diesel Generator Control Room & Generator House

    Diesel Generator Control Room & Generator House - construction underway 14 TSX: GLO | OTCQX: GLATF | FRA: G12

  15. Slide 15: ROM Pad – earthworks nearing completion

    ROM Pad – earthworks nearing completion 15 TSX: GLO | OTCQX: GLATF | FRA: G12

  16. Slide 16: SAG Mill foundation structure, ROM Pad and retention wall

    SAG Mill foundation structure, ROM Pad and retention wall 16 TSX: GLO | OTCQX: GLATF | FRA: G12

  17. Slide 17: Stacker & Reclaimer Area under construction

    Stacker & Reclaimer Area under construction 17 TSX: GLO | OTCQX: GLATF | FRA: G12

  18. Slide 18: Belt Filter Area, Acid Plant and site facilities

    Belt Filter Area – civil works underway Administrative Offices Acid Plant – civil works progressing Demineralized Water Facility – civil works in progress Diesel Storage Facility - foundation completed 18 TSX: GLO | OTCQX: GLATF | FRA: G12

  19. Slide 19: 260-person camp completed

    260-person camp completed 19 TSX: GLO | OTCQX: GLATF | FRA: G12

  20. Slide 20: 1 million hours LTI-free

    1 million hours LTI-free — a shared achievement 20 TSX: GLO | OTCQX: GLATF | FRA: G12

  21. Slide 21: ESG Initiatives Since 2008

    ESG INITIATIVES SINCE 2008: • Food during droughts • Medical supplies • Water wells & infrastructure • Education & training • Local, regional and national procurement of goods & services • ESIAs include significant consultation and baseline studies • Development Bank due diligence independently vali

  22. Slide 22: Community consultation and village initiatives

    Animal watering trough installation Area village consultation meeting On-site townhall meetings 22 TSX: GLO | OTCQX: GLATF | FRA: G12

  23. Slide 23: Uranium Demand Exceeds Supply

    URANIUM DEMAND EXCEEDS SUPPLY Source: WNA/Fuel Link 23 TSX: GLO | OTCQX: GLATF | FRA: G12

  24. Slide 24: Befesa Silvermet, Türkiye

    BEFESA SILVERMET, TÜRKİYE • Joint Venture (49%) with Befesa Zinc, the market leader in zinc recycling • Processes EAFD containing 20% to 30% zinc sourced from local steel mills • Produces a 65% to 70% zinc oxide concentrate for sale to smelters • Recovers high grade zinc & removes toxic elements fro

  25. Slide 25: Zinc Recycling JV Production & Profitability

    ZINC RECYCLING JV PRODUCTION & PROFITABILITY EAFD Processed (tonnes) Sales - Zinc (000 lbs) Avg. monthly LME Zinc price (US$/lb) • New Plant loan retired. 90,000 $1.80 • Improved availability of the 80,000 $1.60 operation’s primary feedstock— 70,000 $1.40 electric arc furnace dust (EAFD) 60,000 $1.2

  26. Slide 26: Capital Structure

    CAPITAL STRUCTURE C$275 M Global Atomic Share Price Performance (January 2, 2020 - August 31, 2026) Market Capitalization C$0.56 490.3 M GLO Share Price (CAD) Uranium Juniors Adj. to GLO Bas e (CAD) TSX Composite Adj. to GLO Base (CAD) $7.00 TSX Share Price Shares Issued* As of August 31, 2026 As of

  27. Slide 27: Fueling a Low-Carbon Future

    FUELING A LOW-CARBON FUTURE GLOBAL ATOMIC CORPORATION 8 King St E, Suite 1700 Toronto, ON M5C 1B5 +1 416-368-3949 globalatomiccorp.com info@globalatomiccorp.com 27 TSX: GLO | OTCQX: GLATF | FRA: G12

Global Atomic — Investor Presentation (September 2026) on 6ix