Global Atomic Corporation · TSX:GLO

Global Atomic — Investor Presentation (March 2026)

33 slides from Global Atomic's investor presentation, March 2026

  1. Slide 1: Global Atomic Corporation – Advancing the Dasa Uranium Project

    GLOBAL ATOMIC CORPORATION Advancing the Dasa Uranium Project in the Republic of Niger CORPORATE PRESENTATION MARCH 2 0 2 6

  2. Slide 2: Disclaimer

    Disclaimer This presentation has been prepared by Global Atomic Corporation (“Global Atomic” or the “Company”) and includes information from sources believed by management to be reliable. No representation or warranty, expressed or implied, is made as to the accuracy of the information set forth her

  3. Slide 3: Near-Term Uranium Production & Mineral Recycling

    NEAR-TERM URANIUM PRODUCTION & MINERAL RECYCLING URANIUM Republic of Niger Uranium will fuel the global reactor fleet to generate clean baseload power. HQ Canada Zinc Türkiye ZINC RECYCLING Uranium Niger Iskenderun, Türkiye Zinc concentrate produced by recycling Electric Arc Furnace Dust (EAFD), is

  4. Slide 4: Dasa Leading the Way

    LEADING THE WAY DASA PROJECT THE ONLY GREENFIELD URANIUM PROJECT UNDER DEVELOPMENT TODAY 4 TSX: GLO | OTCQX: GLATF | FRA: G12

  5. Slide 5: 2024 Feasibility Study Highlights

    2024 FEASIBILITY STUDY HIGHLIGHTS  Production: 68.1 Mlb U3O8 over 23 years  Reserve Grade 4,113 ppm; 5,109 ppm in the first 12 years, highest grade outside of the Athabasca Basin  Feasibility Study assumed a base U3O8 price of US$75/lb  Actual production timelines will depend on the timing of pr

  6. Slide 6: Value Opportunities

    VALUE 2024 FEASIBILITY STUDY ESTIMATED PRODUCTION OPPORTUNITIES 6 Global Atomic’s development plan 5 includes: 4 • An infill drill program on Dasa’s Inferred Resources, 51.4 Mlbs @ Millions lbs U3O8 5,349 ppm, with the objective to 3 increase minable reserves to maintain average annual 2 production

  7. Slide 7: Comparative Grade / Tonnage Report – 2023 Mineral Resource Estimate

    COMPARATIVE GRADE / TONNAGE REPORT AT VARYING CUT-OFF GRADES 2023 MINERAL RESOURCE ESTIMATE May 2023 Revised Estimate eU3O8 (ppm) Tonnes (Mt) eU3O8 Mlbs Contained Uranium Uranium Content Cut-Off Category Indicated 103.6 803 183.5 100 Inferred 71.0 636 99.5 Indicated 44.9 1,602 158.5 320 Inferred 25.

  8. Slide 8: Flank Zone Mine Plan

    FLANK ZONE MINE PLAN Flank Zone Flank Zone Completed Feb 2026 Mar 2026 Apr 2026 Plan - 2026 Plan – 10 years • Ramp and level development advancing to provide stope access on five levels in the Flank Zone. • The Flank Zone will be mined over 10 years prior to entering the main orebody. 8 TSX: GLO | O

  9. Slide 9: Mining Team advancing underground development

    Mining Team advancing underground development 9 TSX: GLO | OTCQX: GLATF | FRA: G12

  10. Slide 10: Processing Plant is underway

    Processing Plant is underway 10 TSX: GLO | OTCQX: GLATF | FRA: G12

  11. Slide 11: Various civil works underway

    Various civil works underway 11 TSX: GLO | OTCQX: GLATF | FRA: G12

  12. Slide 12: Main Substation advancing

    Main Substation advancing 12 TSX: GLO | OTCQX: GLATF | FRA: G12

  13. Slide 13: Various civil works underway

    Various civil works underway 13 TSX: GLO | OTCQX: GLATF | FRA: G12

  14. Slide 14: Crusher & ROM Pad progressing well

    Crusher & ROM Pad progressing well 14 TSX: GLO | OTCQX: GLATF | FRA: G12

  15. Slide 15: Diesel generator building foundation; Control Room & Laboratory building

    Diesel generator building foundation Diesel storage tank foundations Control Room & Laboratory building 15 TSX: GLO | OTCQX: GLATF | FRA: G12

  16. Slide 16: Substation #2 under construction

    Substation #2 under construction 16 TSX: GLO | OTCQX: GLATF | FRA: G12

  17. Slide 17: Acid Plant: steam turbine building & infrastructure

    Acid Plant: steam turbine building & infrastructure 17 TSX: GLO | OTCQX: GLATF | FRA: G12

  18. Slide 18: Various civil works underway

    Various civil works underway 18 TSX: GLO | OTCQX: GLATF | FRA: G12

  19. Slide 19: Various civil works underway

    Various civil works underway 19 TSX: GLO | OTCQX: GLATF | FRA: G12

  20. Slide 20: Substation #2 under construction

    Substation #2 under construction 20 TSX: GLO | OTCQX: GLATF | FRA: G12

  21. Slide 21: Acid storage tank foundation & cooling tower

    Acid storage tank foundation & cooling tower 21 TSX: GLO | OTCQX: GLATF | FRA: G12

  22. Slide 22: Rebar bending and installation in progress

    Rebar bending and installation in progress 22 TSX: GLO | OTCQX: GLATF | FRA: G12

  23. Slide 23: New 260-person camp completed

    New 260-person camp completed 23 TSX: GLO | OTCQX: GLATF | FRA: G12

  24. Slide 24: Teamwork around the site

    Teamwork around the site 24 TSX: GLO | OTCQX: GLATF | FRA: G12

  25. Slide 25: SAG Mill concrete works; Pugging drum ready to ship

    SAG Mill concrete works Pugging drum ready to ship to Dasa site 25 TSX: GLO | OTCQX: GLATF | FRA: G12

  26. Slide 26: Empowering our workforce

    Empowering our workforce Emergency Response Team training session 26 TSX: GLO | OTCQX: GLATF | FRA: G12

  27. Slide 27: ESG Initiatives Since 2008

    ESG INITIATIVES SINCE 2008: • Food during droughts • Medical supplies • Water wells & infrastructure • Education & training • Local, regional and national procurement of goods & services • ESIAs include significant consultation and baseline studies • Independent audit confirms ESG practice is compli

  28. Slide 28: Strong community relations & social engagement at the Dasa Project

    Strong community relations & social engagement at the Dasa Project. 28 TSX: GLO | OTCQX: GLATF | FRA: G12

  29. Slide 29: Uranium Demand Exceeds Supply

    URANIUM DEMAND EXCEEDS SUPPLY Source: WNA/Fuel Link 29 TSX: GLO | OTCQX: GLATF | FRA: G12

  30. Slide 30: Befesa Silvermet, Türkiye

    BEFESA SILVERMET, TÜRKİYE • Joint Venture (49%) with Befesa Zinc, the market leader in zinc recycling • Processes EAFD containing 20% to 30% zinc sourced from local steel mills • Produces a 65% to 70% zinc oxide concentrate for sale to smelters • Recovers high grade zinc & removes toxic elements fro

  31. Slide 31: Zinc Recycling JV Production & Profitability

    ZINC RECYCLING JV PRODUCTION & PROFITABILITY EAFD Processed (tonnes) Sales - Zinc (000 lbs) Avg. monthly LME Zinc price (US$/lb) • New Plant loan retired. 90,000 $1.80 80,000 $1.60 • Improved availability of the 70,000 $1.40 operation’s primary feedstock— 60,000 $1.20 electric arc furnace dust (EAFD

  32. Slide 32: Capital Structure

    CAPITAL STRUCTURE C$422 M Market Capitalization Global Atomic Share Price Performance (January 2, 2020 - Feb 28, 2026) GLO Share Price (CAD) Uranium Juniors Adj. to GLO Base (CAD) TSX Composite Adj. to GLO Base (CAD) C$0.86 490.3 M TSX Share Price Shares Issued* $5.00 As of Feb 28, 2026 As of Feb 28

  33. Slide 33: Fueling a Low-Carbon Future

    FUELING A LOW-CARBON FUTURE GLOBAL ATOMIC CORPORATION 8 King St E, Suite 1700 Toronto, ON M5C 1B5 +1 416-368-3949 globalatomiccorp.com info@globalatomiccorp.com 33 TSX: GLO | OTCQX: GLATF | FRA: G12