Slide 1: Global Atomic Corporation – Advancing the Dasa Uranium Project
GLOBAL ATOMIC CORPORATION Advancing the Dasa Uranium Project in the Republic of Niger CORPORATE PRESENTATION MARCH 2 0 2 6
Slide 2: Disclaimer
Disclaimer This presentation has been prepared by Global Atomic Corporation (“Global Atomic” or the “Company”) and includes information from sources believed by management to be reliable. No representation or warranty, expressed or implied, is made as to the accuracy of the information set forth her
Slide 3: Near-Term Uranium Production & Mineral Recycling
NEAR-TERM URANIUM PRODUCTION & MINERAL RECYCLING URANIUM Republic of Niger Uranium will fuel the global reactor fleet to generate clean baseload power. HQ Canada Zinc Türkiye ZINC RECYCLING Uranium Niger Iskenderun, Türkiye Zinc concentrate produced by recycling Electric Arc Furnace Dust (EAFD), is
Slide 4: Dasa Leading the Way
LEADING THE WAY DASA PROJECT THE ONLY GREENFIELD URANIUM PROJECT UNDER DEVELOPMENT TODAY 4 TSX: GLO | OTCQX: GLATF | FRA: G12
Slide 5: 2024 Feasibility Study Highlights
2024 FEASIBILITY STUDY HIGHLIGHTS Production: 68.1 Mlb U3O8 over 23 years Reserve Grade 4,113 ppm; 5,109 ppm in the first 12 years, highest grade outside of the Athabasca Basin Feasibility Study assumed a base U3O8 price of US$75/lb Actual production timelines will depend on the timing of pr
Slide 6: Value Opportunities
VALUE 2024 FEASIBILITY STUDY ESTIMATED PRODUCTION OPPORTUNITIES 6 Global Atomic’s development plan 5 includes: 4 • An infill drill program on Dasa’s Inferred Resources, 51.4 Mlbs @ Millions lbs U3O8 5,349 ppm, with the objective to 3 increase minable reserves to maintain average annual 2 production
Slide 7: Comparative Grade / Tonnage Report – 2023 Mineral Resource Estimate
COMPARATIVE GRADE / TONNAGE REPORT AT VARYING CUT-OFF GRADES 2023 MINERAL RESOURCE ESTIMATE May 2023 Revised Estimate eU3O8 (ppm) Tonnes (Mt) eU3O8 Mlbs Contained Uranium Uranium Content Cut-Off Category Indicated 103.6 803 183.5 100 Inferred 71.0 636 99.5 Indicated 44.9 1,602 158.5 320 Inferred 25.
Slide 8: Flank Zone Mine Plan
FLANK ZONE MINE PLAN Flank Zone Flank Zone Completed Feb 2026 Mar 2026 Apr 2026 Plan - 2026 Plan – 10 years • Ramp and level development advancing to provide stope access on five levels in the Flank Zone. • The Flank Zone will be mined over 10 years prior to entering the main orebody. 8 TSX: GLO | O
Slide 9: Mining Team advancing underground development
Mining Team advancing underground development 9 TSX: GLO | OTCQX: GLATF | FRA: G12
Slide 10: Processing Plant is underway
Processing Plant is underway 10 TSX: GLO | OTCQX: GLATF | FRA: G12
Slide 11: Various civil works underway
Various civil works underway 11 TSX: GLO | OTCQX: GLATF | FRA: G12
Slide 12: Main Substation advancing
Main Substation advancing 12 TSX: GLO | OTCQX: GLATF | FRA: G12
Slide 13: Various civil works underway
Various civil works underway 13 TSX: GLO | OTCQX: GLATF | FRA: G12
Slide 14: Crusher & ROM Pad progressing well
Crusher & ROM Pad progressing well 14 TSX: GLO | OTCQX: GLATF | FRA: G12
Slide 15: Diesel generator building foundation; Control Room & Laboratory building
Diesel generator building foundation Diesel storage tank foundations Control Room & Laboratory building 15 TSX: GLO | OTCQX: GLATF | FRA: G12
Slide 16: Substation #2 under construction
Substation #2 under construction 16 TSX: GLO | OTCQX: GLATF | FRA: G12
Slide 17: Acid Plant: steam turbine building & infrastructure
Acid Plant: steam turbine building & infrastructure 17 TSX: GLO | OTCQX: GLATF | FRA: G12
Slide 18: Various civil works underway
Various civil works underway 18 TSX: GLO | OTCQX: GLATF | FRA: G12
Slide 19: Various civil works underway
Various civil works underway 19 TSX: GLO | OTCQX: GLATF | FRA: G12
Slide 20: Substation #2 under construction
Substation #2 under construction 20 TSX: GLO | OTCQX: GLATF | FRA: G12
Slide 21: Acid storage tank foundation & cooling tower
Acid storage tank foundation & cooling tower 21 TSX: GLO | OTCQX: GLATF | FRA: G12
Slide 22: Rebar bending and installation in progress
Rebar bending and installation in progress 22 TSX: GLO | OTCQX: GLATF | FRA: G12
Slide 23: New 260-person camp completed
New 260-person camp completed 23 TSX: GLO | OTCQX: GLATF | FRA: G12
Slide 24: Teamwork around the site
Teamwork around the site 24 TSX: GLO | OTCQX: GLATF | FRA: G12
Slide 25: SAG Mill concrete works; Pugging drum ready to ship
SAG Mill concrete works Pugging drum ready to ship to Dasa site 25 TSX: GLO | OTCQX: GLATF | FRA: G12
Slide 26: Empowering our workforce
Empowering our workforce Emergency Response Team training session 26 TSX: GLO | OTCQX: GLATF | FRA: G12
Slide 27: ESG Initiatives Since 2008
ESG INITIATIVES SINCE 2008: • Food during droughts • Medical supplies • Water wells & infrastructure • Education & training • Local, regional and national procurement of goods & services • ESIAs include significant consultation and baseline studies • Independent audit confirms ESG practice is compli
Slide 28: Strong community relations & social engagement at the Dasa Project
Strong community relations & social engagement at the Dasa Project. 28 TSX: GLO | OTCQX: GLATF | FRA: G12
Slide 29: Uranium Demand Exceeds Supply
URANIUM DEMAND EXCEEDS SUPPLY Source: WNA/Fuel Link 29 TSX: GLO | OTCQX: GLATF | FRA: G12
Slide 30: Befesa Silvermet, Türkiye
BEFESA SILVERMET, TÜRKİYE • Joint Venture (49%) with Befesa Zinc, the market leader in zinc recycling • Processes EAFD containing 20% to 30% zinc sourced from local steel mills • Produces a 65% to 70% zinc oxide concentrate for sale to smelters • Recovers high grade zinc & removes toxic elements fro
Slide 31: Zinc Recycling JV Production & Profitability
ZINC RECYCLING JV PRODUCTION & PROFITABILITY EAFD Processed (tonnes) Sales - Zinc (000 lbs) Avg. monthly LME Zinc price (US$/lb) • New Plant loan retired. 90,000 $1.80 80,000 $1.60 • Improved availability of the 70,000 $1.40 operation’s primary feedstock— 60,000 $1.20 electric arc furnace dust (EAFD
Slide 32: Capital Structure
CAPITAL STRUCTURE C$422 M Market Capitalization Global Atomic Share Price Performance (January 2, 2020 - Feb 28, 2026) GLO Share Price (CAD) Uranium Juniors Adj. to GLO Base (CAD) TSX Composite Adj. to GLO Base (CAD) C$0.86 490.3 M TSX Share Price Shares Issued* $5.00 As of Feb 28, 2026 As of Feb 28
Slide 33: Fueling a Low-Carbon Future
FUELING A LOW-CARBON FUTURE GLOBAL ATOMIC CORPORATION 8 King St E, Suite 1700 Toronto, ON M5C 1B5 +1 416-368-3949 globalatomiccorp.com info@globalatomiccorp.com 33 TSX: GLO | OTCQX: GLATF | FRA: G12