Global Atomic Corporation · TSX:GLO

Global Atomic — Investor Presentation (January 2026)

21 slides from Global Atomic's investor presentation, January 2026

  1. Slide 1: Global Atomic Corporation Corporate Presentation January 2026

    GLOBAL ATOMIC CORPORATION Advancing the Dasa Uranium Project in the Republic of Niger Corporate Presentation JANUARY 2 0 2 6

  2. Slide 2: Disclaimer

    Disclaimer This presentation has been prepared by Global Atomic Corporation (“Global Atomic” or the “Company”) and includes information from sources believed by management to be reliable. No representation or warranty, expressed or implied, is made as to the accuracy of the information set forth her

  3. Slide 3: Near-Term Uranium Production & Mineral Recycling

    NEAR-TERM URANIUM PRODUCTION & MINERAL RECYCLING URANIUM Republic of Niger Uranium will fuel the global reactor fleet to generate clean baseload power. HQ Canada Zinc Türkiye ZINC RECYCLING Uranium Niger Iskenderun, Türkiye Zinc concentrate produced by recycling Electric Arc Furnace Dust (EAFD), is

  4. Slide 4: Dasa Leading the Way: Only Greenfield Uranium Project Under Development

    LEADING THE WAY DASA PROJECT THE ONLY GREENFIELD URANIUM PROJECT UNDER DEVELOPMENT TODAY 4 TSX: GLO | OTCQX: GLATF | FRA: G12

  5. Slide 5: 2024 Feasibility Study Highlights

    2024 FEASIBILITY STUDY HIGHLIGHTS  Production: 68.1 Mlb U3O8 over 23 years  Reserve Grade 4,113 ppm; 5,109 ppm in the first 12 years, outside of the Athabasca Basin  Feasibility Study assumed a base U3O8 price of US$75/lb  Actual production timelines will depend on the timing of project financin

  6. Slide 6: Value Opportunities

    VALUE 2024 FEASIBILITY STUDY ESTIMATED PRODUCTION OPPORTUNITIES 6 Once the Dasa Project is in 5 production, Global Atomic plans to: 4 • Complete a PFS to evaluate Millions lbs U3O8 increasing mill throughput from 3 1,000 to 2,000 tpd. 2 • Conduct an infill drill program on Dasa’s 51.4 Mlb high-grade

  7. Slide 7: 2023 Mineral Resource Estimate

    COMPARATIVE GRADE / TONNAGE REPORT AT VARYING CUT-OFF GRADES 2023 MINERAL RESOURCE ESTIMATE May 2023 Revised Estimate eU3O8 (ppm) Tonnes (Mt) eU3O8 Mlbs Contained Uranium Uranium Content Cut-Off Category Indicated 103.6 803 183.5 100 Inferred 71.0 636 99.5 Indicated 44.9 1,602 158.5 320 Inferred 25.

  8. Slide 8: Flank Zone Mine Plan

    FLANK ZONE MINE PLAN Flank Zone Flank Zone Completed Sept 2025 Oct 2025 Nov 2025 Dec 2025 Plan - 2026 10-year Plan • Ramp and level development advancing to provide stope access on five levels in the Flank Zone. • The Flank Zone will be mined over 10 years prior to entering the main orebody. 8 TSX:

  9. Slide 9: Mining Team advancing underground development

    Mining Team advancing underground development 9 TSX: GLO | OTCQX: GLATF | FRA: G12

  10. Slide 10: Processing Plant is underway

    Processing Plant is underway 10 TSX: GLO | OTCQX: GLATF | FRA: G12

  11. Slide 11: Civil works advancing around Dasa Site

    Civil works advancing around Dasa Site 11 TSX: GLO | OTCQX: GLATF | FRA: G12

  12. Slide 12: Crusher retaining wall completed

    Crusher retaining wall completed 12 TSX: GLO | OTCQX: GLATF | FRA: G12

  13. Slide 13: Diesel storage tanks Lab control room

    Diesel storage tanks Lab control room 13 TSX: GLO | OTCQX: GLATF | FRA: G12

  14. Slide 14: Dasa Camps

    Dasa Camps 14 TSX: GLO | OTCQX: GLATF | FRA: G12

  15. Slide 15: ESG Initiatives Since 2008

    ESG INITIATIVES SINCE 2008: • Food during droughts • Medical supplies • Water wells & infrastructure • Education & training • Local, regional and national procurement of goods & services • ESIAs include significant consultation and baseline studies • Development Bank due diligence independently vali

  16. Slide 16: Strong community relations & social engagement at the Dasa Project

    Strong community relations & social engagement at the Dasa Project. 16 TSX: GLO | OTCQX: GLATF | FRA: G12

  17. Slide 17: Uranium Demand Exceeds Supply

    URANIUM SUPPLY & DEMAND URANIUM DEMAND EXCEEDS SUPPLY Source: WNA/Fuel Link 2024 17 TSX: GLO | OTCQX: GLATF | FRA: G12

  18. Slide 18: Befesa Silvermet, Türkiye

    BEFESA SILVERMET, TÜRKİYE • Joint Venture (49%) with Befesa Zinc, the market leader in zinc recycling • Processes EAFD containing 20% to 30% zinc sourced from local steel mills • Produces a 65% to 70% zinc oxide concentrate for sale to smelters • Recovers high grade zinc & removes toxic elements fro

  19. Slide 19: Zinc Recycling JV Production & Profitability

    JV PRODUCTION & PROFITABILITY ZINC RECYCLING EAFD Processed (tonnes) Sales - Zinc (000 lbs) Avg. monthly LME Zinc price (US$/lb) • Better availability of this 90,000 $1.80 80,000 $1.60 operation’s primary raw 70,000 $1.40 material, electric arc furnace 60,000 $1.20 dust (EAFD) from area steel 50,000

  20. Slide 20: Capital Structure

    CAPITAL STRUCTURE C$294 M Global Atomic Share Price Performance (January 2, 2020 - December 31, 2025) Market Capitalization GLO Share Price (CAD) Uranium Juniors Adj. to GLO Base (CAD) TSX Composite Adj. to GLO Base (CAD) C$0.72 407.8 M TSX Share Price Shares Issued* $5.00 As of Dec 31, 2025 As of D

  21. Slide 21: Thank You!

    THANK YOU! GLOBAL ATOMIC CORPORATION 8 King St E, Suite 1700 Toronto, ON M5C 1B5 +1 416-368-3949 globalatomiccorp.com info@globalatomiccorp.com 21 TSX: GLO | OTCQX: GLATF | FRA: G12

Global Atomic — Investor Presentation (January 2026) on 6ix