Purepoint Uranium Group Inc. · TSXV:PTU

Purepoint Uranium — Investor Presentation (February 2025)

20 slides from Purepoint Uranium's investor presentation, February 2025

  1. Slide 1: Q1 2025 Corporate Presentation

    TSXV: PTU | OTCQB: PTUUF Q1 - 2025

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS Disclaimer The general information set out in this presentation regarding the uranium market, including but not limited to, the demand and supply of uranium, historical events that affected uranium pricing, the global state of the uranium market and other related informati

  3. Slide 3: Backed by Industry Leaders, Built for Large-Scale Exploration

    Backed by Industry Leaders, Built for Large-Scale Exploration Trusted Operator & Chosen Partner of Top Industry Players District-Scale Projects in the Most Prolific Areas • Six projects under active joint venture are strategically positioned along well-established mine corridors on trend with major

  4. Slide 4: Long-Term Strength Over Short-Term Volatility

    Long-Term Strength Over Short-Term Volatility Short-Term Spot Price Weakness Long-Term Strength $105.00 • Profit-taking & financial market rotation after strong • The Structural Supply Deficit is 2023 gains Growing ü Global mine production < • Utilities secured contracts early, reducing immediate re

  5. Slide 5: Operator: Purepoint – Hook Lake JV

    Operator: Purepoint HOOK LAKE JV Joint Venture Breakdown Next Steps • Cameco: 39.5% • Orano: 39.5% • Proposed Drilling: 4,850 m between Carter • Purepoint: 21.0% Corridor & Patterson East • Proposed Geophysics in Carter North • As the operator, Purepoint earns a 10% Corridor management fee TSXV: PTU

  6. Slide 6: Cameco | Orano | Purepoint Hook Lake JV

    Cameco | Orano | Purepoint HOOK LAKE JV Purepoint’s Spitfire Discovery . • Resource not defined • Results include 10.3% U3O8 over . 10.0 metres . NexGen’s Arrow Deposit • 2018 PFS . • Indicated Resource • 256,600,000 lbs U3O8 • Avg Grade 4.03% U3O8 Fission’s Triple R Deposit • 2022 MRE • Indicated R

  7. Slide 7: Clearwater Domain – Carter Corridor

    Carter Corridor • 25km band of graphitic conductors • Ideal Rock Type • Extremely close to hydrothermal heat source Clearwater (Clearwater Domain) Domain Carter • Complex, long-lived faulting pattern Corridor Patterson Corridor 2023/2024 Drilling & Identification of the Lightning Lightning Zone Zone

  8. Slide 8: On Trend With NexGen's Newest High-Grade Discovery

    On Trend With NexGen’s Newest High-Grade Discovery Patterson East Corridor • Targeting a 1.2 km band of graphitic conductors • Depth to unconformity 100 to 200m Recent Findings at the Patterson East Corridor • NexGen PCE Discovery: RK-24-183 • 13.5m of 7.8% U3O8 including 0.5m of 10% U3O8 and 0.5m o

  9. Slide 9: Operator: Purepoint

    Operator: Purepoint SMART LAKE JV SMART LAKE JV • Cameco Corp: 73% | Purepoint: 27% DORADO JV • IsoEnergy: 50% | Purepoint: 50% CELESTE BLOCK JV • IsoEnergy: 50% | Purepoint: 50% AURORA JV • IsoEnergy: 50% | Purepoint: 50% TSXV: PTU | OTCQB: PTUUF 9

  10. Slide 10: JV with Cameco Corp. – Smart Lake

    JV with Cameco Corp. • Geologically connected to the Shea Creek Deposit • The Smart Lake targets represent the southern end of the Saskatoon Lake Conductor: displaced along the Beaty River Fault • Early drilling by the JV partners, intersected basement- hosted uranium mineralization associated with

  11. Slide 11: Drilling Begins March 2025

    Drilling Begins March 2025 Groomes Lake Target Area • Conductors within the Groomes Lake Target strikes north-east which may be favorable for enhance dilation, fluid flow and uranium deposition SMML and FL TEM Survey – completed December 2024: • The survey covered 31.5 line-kilometres across 19 loop

  12. Slide 12: JV with IsoEnergy Ltd. – Dorado

    JV with IsoEnergy Ltd. • Drilling has revealed a shallow vertical depth to the unconformity, ranging from just 27 to 133 metres and several highly prospective yet untested zones remain • Historical drilling intersected high-grade basement- hosted uranium mineralization, including 2.74% U₃O₈ over 1.2

  13. Slide 13: Drilling Begins Spring 2025

    Drilling Begins Spring 2025 Serin Grid • Extension of the Larocque Conductive Corridor • Two holes planned for Serin Grid area in 2025 Turaco Grid • Priority target due to low gravity / low magnetic response • Four holes planned for Turaco target area in 2025 Q48 Grid • Two planned 2025 drill holes

  14. Slide 14: Drilling Scheduled for Fall 2025

    Drilling Scheduled for Fall 2025 • Near-term efforts will focus on drill testing recent geophysical results on the NE property where sandstone cover is thin, and limited historical drilling has been completed with just one hole drilled since 1989 • Approximately 800 metres in 4 drill holes are plann

  15. Slide 15: JV with IsoEnergy Ltd. – Aurora

    JV with IsoEnergy Ltd. • An airborne magnetotellurics geophysical survey on the SE portion of the project is planned for 2025 to resolve deep-seated structures targeted for drilling AURORA JV DESCRIPTION • 53,045 hectares positioned directly east of Dorado JV project, situated on the shallow, easter

  16. Slide 16: Denare West, Tabbernor, Henday and Other Projects

    Denare West Tabbernor Russell South Carson Lake Henday Tower Optioned to 100% Owned 100% Owned 100% Owned 100% Owned 100% Owned • Phase 1 Earn In: • Located at the • Adjoins ValOre • Located 9 km 51% by spending southern edge of Metals Hatchet • Geologically NW of Orano’s $3mm to Nov the Athabasca L

  17. Slide 17: Built for Large-Scale Exploration, Backed by Industry Leaders

    Built for Large-Scale Exploration, Backed by Industry Leaders TSX Venture: PTU | OTCQB: PTUUF Total Shares Outstanding 64.3 mm Trusted Operator & Chosen Partner of Top Industry Players 52 Week Range $0.60 | 0.20 • Focused on advancing key projects with active joint ventures on majority of assets Opt

  18. Slide 18: Decades of Experience in the Athabasca Basin

    Decades of Experience in the Athabasca Basin Chris Frostad, BBA, CA, CPA - President & CEO and Director Colin Fehr, B.Sc., P.Geo. – Chief Geologist • 35+ years of experience in the development and building a variety of • 10+ years of exploration and mine site experience in a variety high growth, ear

  19. Slide 19: Decades of Experience in the Athabasca Basin

    Decades of Experience in the Athabasca Basin Allan Beach, BA. LLB – Director and Corporate Secretary Chris Frostad, BBA, CA, CPA - President & CEO and Director • Former partner Fasken Martineau DuMoulin LLP, with over • 35+ years of experience in the development and building a 30 years of experience

  20. Slide 20: Contact Us

    Contact Us Monthly Uranium Exploration Newsletter Brought to you by: MONTHLY URANIUM EXPLORATION UPDATE OCTOBER 2024 Uranium Spotlight US increases import tariffs as domestic uranium production grows Source: World Nuclear News UxC Consulting Spot Price US$ Weekly Podcast September 25, 2024 August 31

Purepoint Uranium Group — Investor Presentation (February 2025) on 6ix