Splinter Rock Maiden Mineral Resource
Filed with ASX · · 33 pages · English
OD6 Metals Limited (OD6 or the Company) is delighted to announce a Maiden Mineral Resource estimate for its Splinter Rock Rare Earth Project (the Project), located northeast of Esperance in Western Australia. Highlights: • Maiden Inferred Mineral Resource Estimate (MRE) of 344Mt @ 1,308ppm TREO at 1,000ppm cut-off grade • Includes 149Mt at 1,423ppm TREO with 23% Magnet Rare Earth Oxides (MagREO) a
In the deck
Earlier from OD6 Metals
- Phase Three Drilling Commences At Splinter Rock
- Bumper REE Grades and Extensive Thicknesses at Splinter Rock
- Very High Metallurgical Recoveries
- Grass Patch Drilling Identifies High-Grade REEs
- Second Phase Drilling Complete at Splinter Rock
Later from OD6 Metals
- Phase 3 Drilling Complete at Splinter Rock REE Project
- Phase 3 Drill Results Significantly Expand Prop Potential
- Metallurgical Test Results Confirm Low Acid Consumption
- Standout Grades and Thickness Confirmed at Centre Prospect
- Modelling Reveals Major Extensions to REE Basins
Follow OD6 Metals into a list and get an email when it puts out news.
Follow OD6 Metals