Phase 3 Drilling Complete at Splinter Rock REE Project
Filed with ASX · · 15 pages · English
OD6 Metals Limited (OD6 or the Company) is pleased to advise that Phase 3 drilling is complete at its Splinter Rock Clay Hosted Rare Earth Project, located northeast of Esperance in Western Australia. Highlights: • Phase 3 Aircore (AC) drilling program complete at Splinter Rock • Total of 145 holes drilled for 7,435m at approximate average depth of 51m and maximum depth of 104m • Program designed
Story so far
Earlier from OD6 Metals
- Splinter Rock Maiden Mineral Resource
- Phase Three Drilling Commences At Splinter Rock
- Bumper REE Grades and Extensive Thicknesses at Splinter Rock
- Very High Metallurgical Recoveries
- Grass Patch Drilling Identifies High-Grade REEs
Later from OD6 Metals
- Phase 3 Drill Results Significantly Expand Prop Potential
- Metallurgical Test Results Confirm Low Acid Consumption
- Standout Grades and Thickness Confirmed at Centre Prospect
- Modelling Reveals Major Extensions to REE Basins
- Chairman's Address and AGM Presentation
Follow OD6 Metals into a list and get an email when it puts out news.
Follow OD6 Metals