New Acland Mine
Contents
Appendix 1 - Monitoring Locations 13 Appendix 2 - Environmental Monitoring Data 14 Appendix 3 - Third-Party External Reports 24 Appendix 4 - Extracted Conditions 25 Appendix 5 - Environmental Authority Limits 28
Tables
Table 1: Mining related activities at each pit 4
Table 2: Meteorological monitoring site and parameters 5
Table 3: Air quality monitoring sites and parameters 6
Table 4: Noise monitoring sites and parameters 6
Table 5: Meteorological Data for the Monitoring Period 7
Table 6: Compliance air quality monitoring data collected during the Monitoring Period. 8 Table 7: Compliance noise monitoring data collected during the Monitoring Period 10
Table 8: Blast and vibration monitoring data collected during the Monitoring Period 11
Table 9: New Acland Coal's Air Quality Monitoring for Total Suspended Particles (TSP), PM10, and PM2.5 14
Table 10: NAC Noise Compass Data LAeq (dBA, 12:00 am to 12:00 am) for Acland, North and East Compasses 19
Table 11: Noise monitoring data LAmax (dBA, 12:00 am to 12:00 am) collected during the Monitoring Period 22
Table 12: Regulatory conditions and requirements referred to in report. 25
Table 13: EA Noise Limits (including Construction). 28
Table 14: EA Blasting Noise Limits 28
Table 15: Air quality limits and monitoring requirements 29
Figures
Figure 1: Wind Rose Diagram for the Monitoring Period 7
Figure 2: Daily TSP values for New Acland Coal 16
Figure 3: Daily PM10 values for New Acland Coal 17
Figure 4: Daily PM2.5 values for New Acland Coal 18
Figure 5: Performance Noise Measurements (LAeq, 7:00 am to 6:00 pm) for New Acland Coal during the Monitoring Period 20
Figure 6: Performance Noise Measurements (LAeq, 6:00 pm to 7:00 am) for New Acland Coal during the Monitoring Period 21
Figure 7: Performance Noise Measurements (LAmax, 10:00 pm to 7:00 am) for New Acland Coal 23
Document History and StatusRevision | Date issued | Reviewed by | Approved by | Date approved | Revision type |
0.0 | 26-Jun-25 | G Cowie | Draft | ||
1 | |||||
2 | |||||
3 | |||||
4 |
Last saved: |
File name: |
Author: |
Name of organisation: |
Name of Project: |
Name of document: |
Document version: |
26/06/2025
250626 Monthly Air Noise and Vibration Reports_April_2025_v0_draft_ML.docx Wei Kiat Yeo
SLR Consulting Australia Pty Ltd
on behalf of New Acland Coal Pty Ltd New Acland Stage 3 Project
Air, Noise and Vibration Monthly Report - New Acland Stage 3 Project 0
Purpose
This document (Report) is issued by New Acland Coal Pty Ltd (New Acland Coal/NAC) in respect of the New Acland Coal Mine Stage 3 project (New Acland Mine or Project). It has been prepared by SLR Consulting Australia Pty Ltd (SLR), on behalf of NAC.
The purpose of this Report is to make publicly available environmental monitoring reports from air, noise and vibration monitoring that has been conducted at and around the New Acland Mine in accordance with environmental authority EPML00335713 (Environmental Authority / EA).
This Report exclusively covers the period commencing on 01 April 2025 and ending on 30 April 2025 (Monitoring Period).
This report is intended to satisfy the requirements of Condition 3 of the Co-ordinator
General's Imposed Conditions applicable to the Project.1
Overview of operations during the Monitoring Period
During the Monitoring Period, mining related activities continued in Manning Vale East, Manning Vale West and Willeroo pits. The mining activities at each pit are presented in Table 1 below.
Table 1: Mining related activities at each pit
Pit | Activities |
Manning Vale East | Vegetation clearing, topsoil removal, coal extraction, removal of overburden, progressive rehabilitation, drill and blast works. |
Manning Vale West | Exploration drilling. |
Willeroo | Vegetation clearing, topsoil removal, removal of overburden, drill and blast works, coal extraction. |
NAC operations occurred over a 24-hour period, where noise permits (i.e. actively monitoring their performance noise monitoring system) and deemed safe. The heavy vehicle workshop operates from 6:30 am to 6:30 pm, with toolbox talks and general preparation occurring between 6:30 am and 7:00 am.
NAC started mining coal October 2023, with capacity and output steadily increasing from this date. The Coal Handling and Preparation Plant (CHPP) typically operates on a 24-hour basis, outside of maintenance and shutdown events. Mobile plant that supports the CHPP include:
Wheel loader and haul truck for run-of-mine (ROM) bin loading and rejects removal. Alternatively, only ROM coal haul trucks operating if they are directly feeding coal to the ROM bin.
Qube trucks hauling export coal to Jondaryan Rail Loadout Facility (JRLF), wheel loader to fill Qube trucks when required. Where Qube trucks operate within NAC's mining lease, whether that be on a mine haul route or public road, noise generated from their operation is subject to the relevant time period noise level limits prescribed
1 As last stated in the New Acland Coal Mine Stage 3 project Coordinator-General's change report No. 4 - amendment to stated conditions following Land Court (2021) proceedings released on 26 May 2022.