Indicated Resource Deep Drilling - Southern Zone
PERTH, Western Australia, April 3 /CNW/ - Mirabela Nickel Ltd. (the "Company") (ASX: MBN, TSX: MNB) announces that infill drilling to prove up more JORC Indicated Resource at Santa Rita continues to return thick intersections in the Southern zone deeps area. Drill hole MBS 279 returned a composite downhole width of 98m at 0.75% Ni. This hole is located on a section located 80m south of previously reported intersection MBS 269 (101m at 0.71% Ni), thereby demonstrating continuity of this mineralization along strike.
Highlights of the recent results are as follows:
------------------------------------------------
Composite
Hole ID From (m) downhole Ni%
width
------------------------------------------------
MBS 275 138 66 0.80
MBS 279 188 98 0.75
MBS 280 62 50 0.68
MBS 283 92 64 0.78
MBS 292 83 51 0.73
MBS 294 154 49 0.67
------------------------------------------------
0.4% Ni cut off grade, 4m minimum mining width
Drill holes MBS 275 (66m at 0.80% Ni) and MBS 279 (98m at 0.75%) are located on the same section confirming that the mineralization is continuous down dip as well as along strike.
Drilling of the Indicated Resource deeps program to convert 6.2Mt at 0.55% Ni of Inferred Resource within open pit limits to Indicated Resource status is now complete. This program has returned a weighted average composite intersection of 69m at 0.75% Ni from the 26 holes to date, significantly wider and higher grade than the current Inferred Resource estimate.
Additional deep drilling is underway to further test the depth extension of the mineralization of the Southern zone.
Measured Infill Drilling - Northern Zone
The initial JORC Measured Resource infill program in the Northern Zone has been completed on schedule. Many of the drilling results exceed the average resource grade of 0.60% Ni; for example MBS 286 (84m at 0.83% Ni) and MBS 295 (66m @ 0.76%Ni). A summary of the recent results is as follows:
------------------------------------------------
Composite
Hole ID From (m) downhole Ni%
width
------------------------------------------------
MBS 285 64 72 0.65
MBS 286(1) 9 84 0.83
MBS 295 81 66 0.76
MBS 297 52 70 0.92
MBS 301 21 61 0.77
MBS 305(2) 18 93 0.72
MBS 308(3) 1 49 0.69
MBS 310(2) 9 69 0.72
------------------------------------------------
0.4% Ni cut off grade, 4m minimum mining width
(1) Oxidised intersection to 42m,
(2) Oxidised intersection to 30m,
(3) Oxidised intersection to 37m
Results from the shallow infill drilling continue to be consistent with existing drilling and current interpretations.
This initial Measured Resource infill program closed the drill spacing from about 40m down to about 20m along 200m of strike length. This part of Northern zone resource is the most attractive to provide early production - otherwise known as the starter pit.
An further infill drilling program of 12,000m is underway to enable the conversion at least 8 mt of resource in the starter pit from Indicated to Measured Resource status. The upgrade to Measured Resource status is expected provide a more accurate geological interpretation and increase confidence for mine scheduling and financing.
New nickel sulphide exploration - Peri Peri project
Initial assay results from the Peri Peri exploration target have confirmed the occurrence of nickel sulphides at potentially economic grades. Drill hole MBS 325 intersected 29m at 0.74% Ni while 100m along strike MBS 322 intersected 36m at 0.62%Ni. The average width of the mineralized zone at Santa Rita is 35m. Highlights of the Peri Peri results are as follows:
------------------------------------------------
Composite
Hole ID From (m) downhole Ni%
width
------------------------------------------------
MBS 302(1) 13 30 0.56
MBS 307 57 25 0.57
MBS 322 36 36 0.62
MBS 325 40 29 0.74
MBS 329 96 12 0.45
------------------------------------------------
0.4% Ni cut off grade; (1)Oxidised intersection
to 17m.
The Peri Peri target is located approximately 2km northeast of Santa Rita along the intrusion-basement contact. The disseminated sulphide mineralization is hosted primarily within the steeply dipping pyroxenite unit that has a true width of between 20 and 40m. Drilling has intersected the pyroxenite for over 200m of strike length and as deep as 130m. Disseminated sulphide mineralization is also found in the basement footwall, although this has a slightly different mineral assemblage and returns a lower assay grade. A schematic long section of Peri Peri showing the approximate location and composite intersections of each hole, is available on Mirabela's website at www.mirabela.com.au.
Local occurrences of matrix style mineralization with up to 30% sulfides have been intersected within the basement footwall. The assemblage of sulphides in this matrix style mineralization is similar to that seen in drill holes at the northern limit of the Santa Rita resource and includes chalcopyrite, pyrite, pyrrhotite and pentlandite in varying percentages. Below is a table that highlights the estimated mineral percentages within the matrix mineralization:
-------------------------------------------------------------------------
Width of Estimated Estimated
matrix Ni% in Cu% in
Sample Interval mineral- matrix matrix
Hole ID From To Ni% Cu% ization min. min.
-------------------------------------------------------------------------
MBS-302 50 51 1.01 1.96 0.4 2.53 4.90
MBS-307 97 98 2.31 0.10 0.3 7.70 0.35
MBS-307 111 112 1.96 0.21 0.3 6.53 0.71
-------------------------------------------------------------------------
Drilling is still underway at Peri Peri. To date 16 drill holes have been completed for a total of 1500m along 300m of strike length.
A detailed table of all recent intersections from the drilling programs discussed above is set out below. An updated schematic long section of Santa Rita showing the best two intersections for recent drill holes, is also is available on Mirabela's website at www.mirabela.com.au.
The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Nick Poll, who is a Member of The Australasia Institute of Mining and Metallurgy. Nick Poll is employed by Mirabela Nickel Limited.
Nick Poll has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserve' and a Qualified Person within the meaning of Canadian National Instrument 43-101 . Nick Poll consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
There can be no assurance that the resources at Mirabela's projects will be increased as a consequence of the drilling results referred to herein.
Not for distribution to United States newswire services or for dissemination in the United States. The securities referred to herein have not been registered under the US Securities Act of 1933 and may not be offered or sold in the United States or to a US person absent registration or an applicable exemption from registration.
Attachment 1: New significant intersections - Indicated Resource Drilling
(0.4% Ni cut off grade, 4m minimum mining width)
-------------------------------------------------
Hole ID From (m) To (m) Downhole Ni% Cu%
width
-------------------------------------------------
MBS 275 138 160 22 0.78 0.23
MBS 275 205 240 35 0.78 0.20
MBS 275 295 304 9 0.92 0.29
MBS 279 188 249 61 0.78 0.24
MBS 279 255 271 16 0.54 0.16
MBS 279 283 291 8 0.43 0.10
MBS 279 302 315 13 1.05 0.26
MBS 280 62 78 16 0.80 0.23
MBS 280 122 134 12 0.64 0.20
MBS 280 138 145 7 0.61 0.13
MBS 280 155 162 7 0.84 0.26
MBS 280 173 181 8 0.44 0.07
MBS 283 92 102 10 0.62 0.19
MBS 283 111 126 15 0.60 0.18
MBS 283 241 255 14 0.79 0.25
MBS 283 260 285 25 0.95 0.21
MBS 287 13 18 5 0.74 0.17
MBS 287 23 36 13 0.52 0.14
MBS 292 83 89 6 0.59 0.20
MBS 292 117 121 4 0.68 0.19
MBS 292 215 228 13 0.47 0.14
MBS 292 242 270 28 0.90 0.21
MBS 293 76 85 9 0.48 0.10
MBS 294 154 158 4 0.60 0.19
MBS 294 166 170 4 0.41 0.13
MBS 294 175 194 19 0.82 0.29
MBS 294 198 202 4 0.46 0.22
MBS 294 205 209 4 0.56 0.17
MBS 294 249 256 7 0.59 0.20
MBS 294 265 272 7 0.69 0.16
MBS 304 83 88 5 0.52 0.18
MBS 304 128 132 4 1.10 0.13
MBS 304 144 149 5 0.47 0.15
MBS 304 154 173 19 0.44 0.13
MBS 304 178 182 4 0.42 0.11
MBS 304 188 200 12 0.50 0.16
MBS 304 211 224 13 0.64 0.16
MBS 304 229 233 4 0.56 0.14
MBS 306 53 58 5 0.46 0.18
MBS 306 180 195 15 0.53 0.15
MBS 311 48 62 14 0.42 0.13
MBS 311 153 157 4 0.49 0.13
MBS 311 174 178 4 0.53 0.12
MBS 311 208 212 4 0.51 0.11
-------------------------------------------------
Attachment 2: New significant intersections - Measured Resource Drilling
(0.4% Ni cut off grade, 4m minimum mining width)
-------------------------------------------------
Hole ID From (m) To (m) Downhole Ni% Cu%
width
-------------------------------------------------
MBS 281 76 132 56 0.60 0.22
MBS 282 76 80 4 0.48 0.08
MBS 282 95 109 14 0.59 0.13
MBS 282 132 142 10 0.46 0.06
MBS 284 94 107 13 0.43 0.12
MBS 284 152 159 7 0.52 0.11
MBS 284 163 171 8 0.43 0.06
MBS 285 64 136.4 72 0.65 0.22
MBS 286(1) 9 93 84 0.83 0.20
MBS 288 123 133 10 0.88 0.21
MBS 288 137 158 21 0.62 0.12
MBS 289(2) 0 29 29 0.95 0.21
MBS 290 28 32 4 0.42 0.08
MBS 290 46 67 21 0.45 0.11
MBS 290 74 82 8 0.62 0.12
MBS 290 96 100 4 0.41 0.07
MBS 290 106 111 5 0.60 0.12
MBS 291 24 28 4 0.55 0.20
MBS 291 96 102 6 0.74 0.16
MBS 291 120 124 4 0.62 0.14
MBS 295 81 85 4 0.70 0.19
MBS 295 118 158 40 0.79 0.21
MBS 295 162 184 22 0.72 0.14
MBS 296(3) 20 32 12 0.55 0.11
MBS 296 42 67 25 0.53 0.10
MBS 297 52 118 66 0.95 0.27
MBS 297 136 140 4 0.47 0.05
MBS 299 0 9 9 0.51 0.08
MBS 299 15 27 12 0.51 0.10
MBS 299 38 42 4 0.40 0.05
MBS 301 21 27 6 0.43 0.12
MBS 301 31 35 4 0.55 0.14
MBS 301 42 58 16 0.85 0.19
MBS 301 66 101 35 0.82 0.21
MBS 305(4) 18 92 74 0.74 0.18
MBS 305 104 123 19 0.63 0.12
MBS 308(5) 1 5 4 0.46 0.12
MBS 308 35 80 45 0.71 0.14
MBS 310(6) 9 62 53 0.80 0.21
MBS 310 83 99 16 0.45 0.09
-------------------------------------------------
(1) Oxidised intersection to 42m,
(2) Oxidised intersection to 21m,
(3) Oxidised intersection to 41m,
(4) Oxidised intersection to 30m,
(5) Oxidised intersection to 37m,
(6) Oxidised intersection to 30m.
Attachment 3: New significant intersections - Peri Peri Drilling
(0.4% Ni cut off grade)
-------------------------------------------------
Hole ID From (m) To (m) Downhole Ni% Cu%
width
-------------------------------------------------
MBS 302(1) 13 21 8 0.90 0.22
MBS 302 29 51 22 0.44 0.20
MBS 307 57 63 6 0.42 0.18
MBS 307 66 70 4 0.40 0.12
MBS 307 74 78 4 0.54 0.13
MBS 307 83 90 7 0.40 0.15
MBS 307 97 100 3 1.11 0.12
MBS 307 111 112 1 1.96 0.21
MBS 312(2) 24 30 6 0.46 0.11
MBS 322 36 40 4 0.46 0.15
MBS 322 52 84 32 0.63 0.22
MBS 325 40 44 4 0.47 0.15
MBS 325 53 57 4 0.45 0.14
MBS 325 73 94 21 0.84 0.26
MBS 329 96 100 4 0.47 0.10
MBS 329 121 129 8 0.44 0.22
-------------------------------------------------
(1) Oxidised intersection to 17m,
(2) Oxidised intersection to 33m.
Attachment 4: Drill hole collar locations
-------------------------------------------------------------------------
Survey Hole
Hole ID Hole type type Easting Northing RL Depth Dip Azimuth
-------------------------------------------------------------------------
MBS 275 Resource TS(1) 422656 8430357 178 330 270 -60
MBS 279 Resource TS 422710 8430356 164 371 270 -60
MBS 280 Resource TS 422635 8430271 192 212.6 270 -60
MBS 281 Resource TS 422561 8431448 192 145.3 270 -60
MBS 282 Resource TS 422480 8431325 220 142 270 -60
MBS 283 Resource TS 422700 8430272 168 307 270 -60
MBS 284 Resource TS 422577 8431399 185 185 270 -60
MBS 285 Resource TS 422542 8431451 198 139.4 270 -60
MBS 286 Resource TS 422440 8431324 231 112 270 -60
MBS 287 Extension TS 423170 8429812 129 60 225 -50
MBS 288 Resource TS 422554 8431401 192 180 270 -60
MBS 289 Resource TS 422391 8431324 214 61 270 -60
MBS 290 Resource TS 422515 8431450 206 120 270 -60
MBS 291 Resource TS 422508 8431300 208 150 270 -60
MBS 292 Resource TS 422717 8430230 167 295 270 -60
MBS 293 Extension TS 423203 8429846 126 100 225 -50
MBS 294 Resource TS 422701 8430314 167 287 270 -60
MBS 295 Resource TS 422537 8431399 198 189.2 270 -60
MBS 296 Resource TS 422497 8431449 208 75.25 270 -60
MBS 297 Resource TS 422486 8431300 218 145 270 -60
MBS 298 Resource TS 422940 8429909 139 100 180 -50
MBS 299 Resource TS 422474 8431450 207 55.25 270 -60
MBS 301 Resource TS 422502 8431401 213 110 270 -60
MBS 302 Peri Peri TS 424508 8432284 158 69.55 45 -60
MBS 304 Resource TS 422885 8430069 137 250 270 -60
MBS 305 Resource TS 422446 8431302 234 125 270 -60
MBS 306 Resource TS 422805 8430110 147 290 270 -60
MBS 307 Peri Peri TS 424519 8432227 144 130.4 45 -60
MBS 308 Resource TS 422457 8431401 219 80 270 -60
MBS 309 Resource TS 422288 8429899 160 100 180 -50
MBS 310 Resource TS 422428 8431301 233 121 270 -60
MBS 311 Resource TS 422717 8430189 169 245 270 -60
MBS 322 Peri Peri TS 424587 8432218 144 121.3 45 -60
MBS 325 Peri Peri TS 424490 8432262 152 136.3 45 -60
MBS 329 Peri Peri TS 424592 8432155 134 160.3 45 -60
-------------------------------------------------------------------------
(1) TS - Total Station Survey Tool.