VANCOUVER, April 5 /CNW/ - Kimber Resources Inc. (AMEX:KBX, TSX:KBR)
Kimber is pleased to report results from a further 19 holes at the
Monterde Project. Of the 19 holes, three were core holes (two from Carotare
and one from Carmen) and 16 reverse circulation holes (all from Carmen).
Much of the drilling targeted the area northeast of the Carmen, Los Hilos
and Cob structures moving out towards the Cocos structure. Step-out holes
MTR-314, MTR-323 and MTR-324 all produced favorable results. The area between
Cob and Cocos continues to produce gold and silver assays of interest that
validate and expand the Carmen model. Drilling will continue in this area of
the deposit. Results include 24 metres of 4.05 g/t gold-equivalent on MTR-314,
36 metres of 2.35 g/t gold-equivalent on MTR-323, a hole which ended in grade,
and 74 metres of 1.69 g/t gold-equivalent on MTR-324.
MTR-318 and MTR-321 reported 32 metres of 2.72 g/t gold-equivalent and
60 metres of 1.62 g/t gold equivalent respectively. These intervals were near
surface and up dip from existing drill holes. The results add to the near
surface gold and silver mineralization in an area considered to be a potential
Carmen starter pit.
High grade intersectons from MTR-319 include 4 metres of 8.88 g/t
gold-equivalent and 6 metres of 7.95 g/t gold-equivalent. These intercepts
were at a depth between 254 metres and 280 metres demonstrating the continuity
between high grade, mid-depth gold and the deeper sections of the Carmen
deposit.
Most notably of the core holes was CTC-03 from the Carotare deposit. This
hole produced 16 metres of 3.14 g/t gold-equivalent and validates the
mineralized interval first drilled in CTR-22 (August 30, 2005 news release).
<<
Gold
Drill Hole From To Interval Gold Silver Equivalent
---------- ---- -- -------- ---- ------ ----------
(m) (m) (m) (g/t) (g/t) (g/t)(x)
CTC-02 34 40 6 0.826 16 1.01
82 92 10 0.995 13 1.15
100 120 20 2.087 6 2.16
CTC-03 54 64 10 1.083 19 1.30
76 92 16 2.896 21 3.14
MTC-27 10 28 18 0.425 79 1.36
and 154 168 14 3.083 173 5.12
and 238 246 8 1.763 100 2.94
MTR-314 192 216 24 2.815 105 4.05
incl 210 214 4 9.795 226 12.45
240 250 10 0.719 8 0.82
258 262 4 1.438 7 1.51
310 316 6 0.819 23 1.09
MTR-317 several low-grade and anomalous intervals
MTR-318 20 52 32 0.551 184 2.72
incl 22 38 16 1.029 322 4.81
MTR-319 22 36 14 0.038 63 0.78
136 142 6 1.064 105 2.30
146 152 6 0.401 76 1.30
254 258 4 8.725 13 8.88
274 280 6 7.453 42 7.95
MTR-320 142 152 10 0.230 66 1.00
and 284 296 12 0.812 8 0.90
MTR-321 2 62 60 0.262 115 1.62
incl 8 12 4 1.060 288 4.45
incl 42 46 4 0.633 125 2.10
MTR-322 110 130 20 1.393 89 2.44
and 140 144 4 1.155 34 1.55
MTR-323 82 118 36 1.481 74 2.35
and 142 146 4 2.795 14 2.95
and 286 300 14 1.797 26 2.10
MTR-324 132 206 74 0.924 65 1.69
incl 188 204 16 3.048 108 4.32
MTR-325 scattered anomalous
MTR-326 48 60 12 0.472 82 1.44
114 122 8 1.208 70 2.03
160 168 8 1.514 23 1.78
MTR-327 76 106 30 0.784 83 1.76
and 150 154 4 3.270 150 5.03
and 208 220 12 0.747 8 0.84
MTR-329 scattered anomalous
MTR-331 0 10 10 0.048 60 0.75
16 34 18 0.156 57 0.82
104 124 20 0.221 56 0.88
194 202 8 4.606 225 7.25
MTR-333 scattered anomalous
MTR-334 72 80 8 0.312 86 1.32
and 172 180 8 0.313 48 0.88
(x) Gold equivalent grade assumes equivalence of 85 grams of silver to
one gram of gold.
True widths are expected to range between 65% and 85% of the intervals
reported on the table above.
About Kimber
Kimber Resources Inc., which holds a 100% interest in the Monterde
property in the Sierra Madre of northern Mexico, is advancing the Carmen
gold-silver deposit towards production. The Carmen deposit, an underground
mine in the 1930's, is a typical low sulphidation epithermal system, oxidized,
and believed to be suitable for open pit mining. Two adjacent epithermal
systems first identified in 2005, the Carotare deposit and El Orito Norte
exploration target appear to be similar to the Carmen. The initial resource
estimate on Carotare was reported in November 2005. The goal of the company is
to demonstrate at least three million resource ounces from the two deposits
and exploration target identified. For further information on the company
visit SEDAR or the company website at www.kimberresources.com.
Mr. Alan Hitchborn, B.Sc., Vice President Development, manages the field
program of drilling and trenching on the Monterde project. Mr. J.B. Richards,
P.Eng., Vice President Engineering, and designated Qualified Person (Q.P.) for
the project is responsible for quality control and has verified the data
disclosed. He has determined that the laboratory reports matched the drill
sample logs and that the quality control assays fall within reasonable limits.
QA./QC procedures incorporate blanks and duplicates inserted at the drill site
and standards inserted after sample preparation. Drilling is by reverse
circulation. A one eighth split of each two-metre section of the drill hole,
weighing approximately 6 kg is processed by ALS Chemex at its preparation
laboratory in Hermosillo, Mexico. Pulps are analysed by ALS Chemex at its
laboratory in North Vancouver, British Columbia, using 50 gram subsamples,
fire assay with an AA finish for gold and four-acid digestion and ICP finish
for silver from a 0.4 gram subsample. Highgrade gold or silver intervals are
re-assayed by fire assay with gravimetric finish.
Cautionary Statement
Statements in this release may be viewed as forward-looking statements.
Such statements involve risks and uncertainties that could cause actual
results to differ materially from those projected. There are no assurances the
Company can fulfill such forward-looking statements and the Company undertakes
no obligation to update such statements. Such forward-looking statements are
only predictions; actual events or results may differ materially as a result
of risks facing the Company, some of which are beyond the Company's control.
>>