Kimber Resources Inc. (TSX:KBR)
VANCOUVER, Sept. 27 /CNW/ -
Drill Results
Results from a further six in-fill holes on the Carmen deposit are
reported below.
Most of these intersections serve to confirm or refine the directions in
which continuity of mineralization had already been tentatively established by
previous drilling. Some of the intersections serve the important objective of
defining the locations of high grade material.
The three high grade intersections, each of six metres, were 22.56 g/t
gold equivalent ("AuEq") in MTR-272, 5.71 g/t AuEq in MTR-268, and 4.34 g/t
AuEq in MTR-269. All of these high grade intersections are associated with the
Los Hilos structure from which there was small-scale production from
underground between 1937 and 1943.
As drilling identifies an increasing number of structures in the hanging
wall to the east of the Carmen structure, names of individual structures ("Los
Hilos", "Cob" etc.) will be reported less as they become incorporated with
other structures into the Carmen deposit.
<<
Gold
Drill Hole From To Interval Gold Silver Equivalent
---------- ---- --- -------- ----- ------ ----------
(m) (m) (m) (g/t) (g/t) (g/t)(x)
MTR-268 110 118 8 1.833 36 2.35
and 234 238 4 0.537 24 0.88
and 256 262 6 2.870 103 4.34
MTR-269 16 22 6 0.608 62 1.49
and 70 80 10 0.525 58 1.35
and 132 138 6 4.713 70 5.71
and 144 148 4 0.711 10 0.85
and 176 180 4 0.511 6 0.60
and 182 186 4 0.525 8 0.63
and 190 208 18 0.602 16 0.83
and 242 248 6 1.049 60 1.90
and 256 260 4 0.524 31 0.97
MTR-270 28 32 4 0.581 37 1.11
and 40 44 4 0.451 56 1.25
and 44 50 6 0.993 92 2.30
and 100 106 6 2.285 42 2.89
and 192 212 20 0.812 13 1.00
and 236 240 4 0.675 11 0.82
MTR-271 76 82 6 0.674 35 1.17
and 86 90 4 0.299 47 0.96
and 94 98 4 1.007 48 1.69
and 128 132 4 0.554 6 0.64
and 172 180 8 1.290 73 2.33
MTR-272 66 78 12 0.205 46 0.86
and 144 150 6 17.879 328 22.56
and 156 162 6 0.604 13 0.79
MTR-273 200 204 4 0.634 29 1.05
(x)Gold equivalent grade assumes equivalence of 85 grams of silver to one
gram of gold.
True widths are expected to range between 65% and 85% of the intervals
reported on the table above.
Two drills, one reverse circulation rig and one core rig, are operating
on the Carmen deposit. There are no results to report from the Carotare target
as rain in August made access difficult. Drilling will resume there as soon as
the second reverse circulation rig returns from a major overhaul. Construction
of access roads for trenching and drilling will start on the El Orito Norte as
soon as the required permits are received.
Stock Options
The Company also announces that it has granted stock options to purchase
477,000 common shares of the Company to a total of 18 employees, ongoing
consultants, Officers and certain Directors of the Company. The exercise price
of the options is $1.65 per share.
About Kimber
Kimber Resources Inc., which holds a 100% interest in the Monterde
property in the Sierra Madre of northern Mexico, is advancing the Carmen
gold-silver deposit towards feasibility, while drilling and carrying out other
exploration activities on neighbouring epithermal systems for additional
resources. The Carmen deposit, an underground mine in the late 1930s, is a
typical epithermal system: low sulphidation, oxidized, and believed to be
suitable for open pit mining. The Carotare, an adjacent epithermal system now
being drilled, appears to be similar. For more information on the company
please visit SEDAR or the Company's website at www.kimberresources.com.
Robert Longe, P.Eng.
President & CEO
Cautionary Statement
Mr. Alan Hitchborn, B.Sc., Vice President Development, manages the field
program of drilling and trenching on the Monterde project. Mr. J.B. Richards,
P.Eng., Vice President Engineering, and designated Qualified Person (Q.P.) for
the project is responsible for quality control and has verified the data
disclosed. He has determined that the laboratory reports matched the drill
sample logs and that the quality control assays fall within reasonable limits.
QA./QC procedures incorporate blanks and duplicates inserted at the drill site
and standards inserted after sample preparation. Drilling is by reverse
circulation. A one eighth split of each two-metre section of the drill hole,
weighing approximately 6 kg is processed by ALS Chemex at its preparation
laboratory in Hermosillo, Mexico. Pulps are analysed by ALS Chemex at its
laboratory in North Vancouver, British Columbia, using 50 gram subsamples,
fire assay with an AA finish for gold and four-acid digestion and ICP finish
for silver from a 0.4 gram subsample. Highgrade gold or silver intervals are
re-assayed by fire assay with gravimetric finish.
Statements in this release may be viewed as forward-looking statements.
Such statements involve risks and uncertainties that could cause actual
results to differ materially from those projected. There are no assurances the
Company can fulfill such forward-looking statements and the Company undertakes
no obligation to update such statements. Such forward-looking statements are
only predictions; actual events or results may differ materially as a result
of risks facing the Company, some of which are beyond the Company's control.
>>