VANCOUVER, May 12 /CNW/ - Kimber Resources Inc. (AMEX:KBX, TSX:KBR)
Further drill results from both the Carmen and Carotare deposits are
reported below. Both deposits remain open for expansion. Drilling continues.
Results from Carmen include MTR-331 which had 8 metres of 7.25g/t Au eq
and 4 metres of 10.09 g/t Au eq. This hole was drilled in the sparsely-drilled
gap between the well-drilled portion of the deposit and the Cocos structure.
MTR-328, in the same area to the southwest of the Cocos structure, contained
18 metres of 2.10 g/t Au eq. Overall, the results from Carmen show multiple
intervals of good open pit grades in almost all of the holes.
The first five Reverse Circulation ("RC") drill holes (CTR-29 to 33) in
western part of the Carotare zone, 250 metres west of the previous drilling,
intersected no significant grades. The holes did not intercept the mineralized
zone seen at surface, probably because the structure does not dip in the
expected direction. The next holes will be drilled in the opposite direction,
towards the south, instead of towards the north. In the meantime, additional
holes are being drilled on the eastern part of the Carotare target where the
first 28 holes generated a resource estimate (announced November 8, 2005 using
a conversion factor of 85:1) of 101,000 Au eq resource ounces of Measured &
Indicated together with 139,000 Au eq resource ounces in the Inferred
category.
<<
Gold
Drill Hole From To Interval Gold Silver Equivalent
---------- ------ --- --------- ----- ------- ----------
(m) (m) (m) (g/t) (g/t) (g/t)(x)
DFR- 20 34 44 10 0.215 62 0.95
MTC- 26 162 194 32 0.523 91 1.59
MTC- 28 4 10 6 0.540 79 1.47
and 208 214 6 2.877 122 4.32
and 220 230 10 0.871 59 1.57
MTC- 29 28 40 12 1.188 168 3.17
and 126 132 6 0.719 48 1.28
MTC- 30 68 88 20 2.070 72 2.92
MTC- 33 4 14 10 0.099 54 0.74
and 26 86 60 0.179 86 1.19
and 130 134 4 1.720 105 2.95
MTR-328 144 158 14 1.345 75 2.23
and 320 324 4 4.153 15 4.33
and 332 350 18 1.923 15 2.10
MTR-330 no significant intercepts
MTR-331 0 10 10 0.048 60 0.75
and 16 34 18 0.156 57 0.82
and 104 124 20 0.221 56 0.88
and 194 202 8 4.606 225 7.25
and 276 280 4 2.629 27 2.95
and 302 306 4 6.630 295 10.09
MTR-332 10 14 4 1.055 76 1.95
and 98 116 18 0.200 65 0.96
and 144 156 12 1.036 21 1.28
and 220 226 6 3.113 14 3.27
and 306 310 4 2.283 14 2.45
MTR-335 0 6 6 0.359 61 1.07
and 78 102 24 0.580 88 1.61
and 122 140 18 0.414 38 0.86
and 162 166 4 0.900 79 1.82
and 200 210 10 0.570 42 1.06
and 224 232 8 0.603 47 1.15
MTR-336 28 38 10 0.809 49 1.38
MTR-337 66 70 4 0.574 105 1.81
and 206 210 4 2.788 34 3.19
MTR-338 32 42 10 2.543 68 3.34
and 86 110 24 0.278 52 0.88
incl 94 98 4 0.740 111 2.05
and 184 194 10 0.561 51 1.17
and 214 218 4 0.684 90 1.74
and 236 240 4 1.242 64 1.99
MTR-339 44 54 10 0.173 75 1.05
and 68 76 8 0.401 67 1.19
and 98 102 4 1.590 153 3.39
and 118 126 8 1.155 37 1.58
and 134 140 6 0.969 38 1.42
and 174 178 4 4.095 11 4.22
MTR-340 no significant intercepts
MTR-341 10 24 14 0.030 46 0.57
and 206 210 4 1.433 61 2.15
MTR-343 110 116 6 0.666 62 1.39
and 182 186 4 0.767 139 2.40
MTR-345 no significant intercepts
CTR-29
to 33 no significant intercepts
(x) Gold equivalent grade assumes equivalence of 75 grams of silver to
one gram of gold.
True widths are expected to range between 65% and 85% of the intervals
reported on the table above.
Ejido Agreement
The Company is pleased to report that a second Ejido (land-owning
collective) has approved an agreement with the Company for access and surface
rights for exploration, development and mining. This Ejido is located to the
north of the Ejido with which the Company has an existing agreement. It covers
the northern mineral concessions which may be required for future operations.
About Kimber
Kimber Resources Inc., which holds a 100% interest in the Monterde
property in the Sierra Madre of northern Mexico, is advancing the Carmen gold-
silver deposit towards production. The Carmen deposit, an underground mine in
the 1930's, is a typical low sulphidation epithermal system, oxidized, and
believed to be suitable for open pit mining. Two adjacent epithermal systems
first identified in 2005, the Carotare deposit and El Orito Norte exploration
target appear to be similar to the Carmen. The initial resource estimate on
Carotare was reported in November 2005. The goal of the company is to
demonstrate at least three million resource ounces from the two deposits and
exploration target identified. For further information on the company visit
SEDAR or the company website at www.kimberresources.com.
Mr. Alan Hitchborn, B.Sc., Vice President Development, manages the field
program of drilling and trenching on the Monterde project. Mr. J.B. Richards,
P.Eng., Vice President Engineering, and designated Qualified Person (Q.P.) for
the project is responsible for quality control and has verified the data
disclosed. He has determined that the laboratory reports matched the drill
sample logs and that the quality control assays fall within reasonable limits.
QA./QC procedures incorporate blanks and duplicates inserted at the drill site
and standards inserted after sample preparation. Drilling is by reverse
circulation. A one eighth split of each two-metre section of the drill hole,
weighing approximately 6 kg is processed by ALS Chemex at its preparation
laboratory in Hermosillo, Mexico. Pulps are analysed by ALS Chemex at its
laboratory in North Vancouver, British Columbia, using 50 gram subsamples,
fire assay with an AA finish for gold and four-acid digestion and ICP finish
for silver from a 0.4 gram subsample. Highgrade gold or silver intervals are
re-assayed by fire assay with gravimetric finish.
Cautionary Statement
Statements in this release may be viewed as forward-looking statements.
Such statements involve risks and uncertainties that could cause actual
results to differ materially from those projected. There are no assurances the
Company can fulfill such forward-looking statements and the Company undertakes
no obligation to update such statements. Such forward-looking statements are
only predictions; actual events or results may differ materially as a result
of risks facing the Company, some of which are beyond the Company's control.
>>