High Grade Nickel Mineralisation at Lake Johnston Project
Filed with ASX · · 19 pages · English
Summary by 6ix AI
TG Metals Ltd. has announced the results of its Phase One aircore drilling program at the Lake Johnston Project, highlighting significant nickel mineralisation. The company plans to conduct further metallurgical testwork to assess the potential for on-site processing of the mineralisation. Additionally, a reverse circulation drill rig has commenced drilling for nickel sulphides as part of ongoing exploration efforts.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Earlier from TG Metals
- Response to ASX Query Letter
- Lithium Soil Anomaly Grows at Lake Johnston
- Drilling to Commence on Lake Johnston Nickel Targets
- New Nickel Sulphide Targets Defined at Lake Johnston in WA
- Exploration Target Statement Bremer Range Nickel Laterite
Later from TG Metals
- High Grade Lithium Intercepted at Lake Johnston
- Expanded Lithium Soil Anomaly at Lake Johnston
- TG Metals Raises $10 Million in Placement
- High Grade Lithium Hits Continue at Lake Johnston
- Lithium Drilling Recommences at Burmeister
Follow TG Metals into a list and get an email when it puts out news.
Follow TG Metals