High Grade Lithium Hits Continue at Lake Johnston
Filed with ASX · · 26 pages · English
Summary by 6ix AI
TG Metals Ltd. has announced further high-grade lithium mineralization at the Burmeister site within the Lake Johnston Project, highlighting significant drill results and extending the strike of mineralization. The best drill interval reported is a substantial length with notable lithium content, and multiple high-grade results have been identified, indicating a thickening of pegmatites.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Earlier from TG Metals
- TG Metals Raises $10 Million in Placement
- Expanded Lithium Soil Anomaly at Lake Johnston
- High Grade Lithium Intercepted at Lake Johnston
- High Grade Nickel Mineralisation at Lake Johnston Project
- Response to ASX Query Letter
Later from TG Metals
- Lithium Drilling Recommences at Burmeister
- Drilling Delivers Further High Grade Lithium at Burmeister
- Further High Grade Lithium Drilling at Burmeister
- Lake Johnston soil results define lithium drill targets
- Burmeister Lithium Potential Defined
Follow TG Metals into a list and get an email when it puts out news.
Follow TG Metals