Gas Flowing from all Three Pilot Wells at Gurvantes XXXV
Filed with ASX · · 2 pages · English
▪ Critical desorption pressure achieved in all three pilot wells with sustained gas flow now established at the Gurvantes XXXV Coal Seam Gas Project in Mongolia ▪ Gas flowing consistently from all three wells and currently being flared ▪ Fluid levels (hydrostatic head) continue to be drawn down in accordance with the reservoir management plan ▪ Initial gas flow rate expected to be reported once hy
Story so far
Earlier from TMK Energy
- First Gas Flowed to Surface at Gurvantes
- TPD: Gurvantes Update - Production Testing Commences
- Production Testing Commences
- Final Commissioning of Pilot Wells Underway
- Maiden Pilot Well Program on Schedule
Later from TMK Energy
- TPD: Continuous Gas Flows Achieved
- 2023 Exploration Activities Commenced
- Operations Update - Gurvantes XXXV
- TPD: TPD and TMK to consolidate ownership of Gurvantes XXXV
- TMK consolidates 100% ownership of gurvantes XXXV
Follow TMK Energy into a list and get an email when it puts out news.
Follow TMK Energy