2023 Exploration Activities Commenced
Filed with ASX · · 3 pages · English
Summary by 6ix AI
The exploration program includes drilling a minimum of four fully cored wells and conducting seismic acquisition, with costs shared equally between TMK and Terra. The drilling program has already begun, utilizing contractors engaged by Terra, and is expected to last approximately two months. This cooperation aims to accelerate exploration efforts and reduce costs while leveraging existing geological data from the area.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Earlier from TMK Energy
- TPD: Continuous Gas Flows Achieved
- Gas Flowing from all Three Pilot Wells at Gurvantes XXXV
- First Gas Flowed to Surface at Gurvantes
- TPD: Gurvantes Update - Production Testing Commences
- Production Testing Commences
Later from TMK Energy
- Operations Update - Gurvantes XXXV
- TPD: TPD and TMK to consolidate ownership of Gurvantes XXXV
- TMK consolidates 100% ownership of gurvantes XXXV
- Pilot Well Program Update - November 2023
- Completion of Acquisition
Follow TMK Energy into a list and get an email when it puts out news.
Follow TMK Energy