Calvalley Petroleum IncTSX: CVI.A

/C O R R E C T I O N from Source -- Calvalley Petroleum Inc./

· Issued by Calvalley Petroleum Inc via CNW
In c9020 sent today at 9:20e, an error occurred in "Net Earnings per
basic and diluted share" under the "Three months 2006 section". In fact,
we should have read "(0.01)" instead of "(0.1)". Corrected copy follows:

Calvalley Petroleum Inc. Issues First Quarter Interim Statements


CALGARY, AB, May 15 /CNW Telbec/ - Calvalley Petroleum Inc., (TSX: CVI.A)
Calvalley Petroleum Inc. (the "Company" or "Calvalley"), an international,
junior oil and gas company based in Calgary, Alberta, is pleased to announce
its operating results and to release its interim statements for the first
quarter of 2006.

All references below are in U.S. dollars.

2006 First Quarter Highlights Included:

<<
-   Closing a $47.7 million (net) bought deal private placement at
    CDN$6.50 per share in February, 2006
-   Drilling four horizontal wells drilled, with a fifth well currently
    being drilled
-   Issuing tender documents for an additional drilling rig and a service
    rig
-   Presenting five additional well proposals for the continued
    development of the Hiswah field to the Government of Yemen for
    approval
-   Presenting three exploration well recommendations to the Government
    of Yemen for approval
-   Issuing tender documents for acquiring 760 kilometers of 2D seismic
    survey data


Financial Highlights for the Period Ended March 31, 2006

                                  Three Months         Three Months
                                          2006                 2005

Total Revenues ($000)                      442                  295
Net Earnings (loss) ($000)              (1,236)                  68
Net Earnings per basic
 and diluted share ($)                   (0.01)                (0.0)
Net cash flow ($000)                    41,731                6,912
Working capital ($000)                  68,793               23,132
Total assets ($000)                    102,084               40,801
Long term debt                             Nil                  Nil
>>

Commencement of Production in Yemen and Ongoing Construction Projects

In late 2005, Calvalley initiated production of the Hiswah Oil Field,
from a single well, Hiswah-6. With limited infrastructure in place, utilizing
temporary tankage and truck loading facilities, the oil was transported
approximately 280 km to Safer Exploration receiving facilities on Block 18.
Initially, production was constrained by the receipt capacity of the Safer
delivery terminal. However, since that time, Calvalley has been authorized to
design and has successfully constructed a new permanent off-loading facility
at Block 18, thereby alleviating the bottleneck.
Other construction projects continued with in the first quarter of 2006,
including installation of temporary facilities for the production of the
Hiswah 3 and 6 wells, while proceeding with construction of a permanent
Central Processing Facility ("CPF") and a field gathering pipeline system.
Calvalley continues to work toward obtaining governmental approval of
design for a sales pipeline transmission system that will connect Block 9 with
Safer's Block 18 facilities. Negotiations continued through the first quarter
of 2006 in respect of the final specifications for the pipeline with the
governmental authorities in Yemen. At this time, the Company has made a
recommendation to construct a twelve inch diameter pipeline which will
ultimately have four pump stations and a maximum capacity of 100,000 barrels a
day.

Continued Drilling Success at Hiswah

Calvalley continues to aggressively pursue exploration and development
opportunities on Block 9. In the first three months of 2006, four horizontal
wells were drilled in the Hiswah field. Drilling of a fifth well, Hiswah 16,
is currently underway which is the fourteenth well in the Hiswah field and the
twenty-fifth well overall in Block 9. The continued emphasis on such drilling
activities illustrates the Company's desire to pursue production growth in
addition to its commitment to an aggressive exploration and development
strategy going forward.

Financial Stability

In January and February of 2006, the Company issued 407,143 Class "A"
common voting shares, with the exercise of warrants originally issued as part
of a 2005 private placement and expiring on March 14, 2006, for cash
consideration of CDN$1,587,858.
On February 21, 2006, Calvalley closed a bought deal private placement of
9,000,000 Class "A" common shares at a price of CDN$6.50 per share for a "net
proceeds" amount of $46,279,000 dollars. This private placement was
underwritten by a syndicate led by UBS Securities Canada Inc. and which
included Jennings Capital Inc., Octagon Capital Corporation and Leede
Financial Markets Inc. The Company intends to apply the proceeds of this issue
towards its ongoing exploration and development program in Yemen.

Outlook

The outlook for the remainder of 2006 is very promising. Calvalley is
pleased to report that the Government of Yemen has recently approved the
location and well programs for another five horizontal wells and an additional
ten well locations have been proposed for subsequent drilling in 2006.
Further, the Government of Yemen has also approved the acquisition of 760 km
of 2D seismic data, which will delineate existing leads that the Company's
technical team has identified as well as to identify additional prospects. In
this regard, Calvalley has received bids from internationally-respected
seismic acquisition firms and expect this program to be initiated by the
summer of 2006.
Calvalley is listed on The Toronto Stock Exchange, trading under the
symbol "CVI.A".

THE TORONTO STOCK EXCHANGE HAS NOT REVIEWED AND DOES NOT ACCEPT
RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

This press release may contain forward-looking statements including,
without limitation, financial and business prospects and financial outlooks,
and such statements may be forward-looking statements which reflect
management's expectations regarding future plans and intentions, growth,
results of operations, performance and business prospects and opportunities.
Words such as "may", "will", "should", "could", "anticipate", "believe",
"expect", "intend", "plan", "potential", "continue", and similar expressions
have been used to identify these forward-looking statements. These statements
reflect management's current beliefs and are based on information currently
available to management. Forward-looking statements involve significant risk
and uncertainties. A number of factors could cause actual results to differ
materially from the results discussed in the forward-looking statements
including, but not limited to, changes in general economic and market
conditions and other risk factors. Although the forward-looking statements
contained herein are based upon what management believes to be reasonable
assumptions, management cannot assure that actual results will be consistent
with these forward-looking statements. Investors should not place undue
reliance on forward-looking statements. These forward-looking statements are
made as of the date hereof.
Forward-looking statements and other information contained herein
concerning the oil and gas industry and Calvalley's general expectations
concerning this industry are based on estimates prepared by management using
data from publicly available industry sources as well as from reserve reports,
market research and industry analysis and on assumptions based on data and
knowledge of this industry which Calvalley believes to be reasonable. However,
this data is inherently imprecise, although generally indicative of relative
market positions, market shares and performance characteristics. While
Calvalley is not aware of any misstatements regarding any industry data
presented herein, the industry involves risks and uncertainties and is subject
to change based on various factors.
%SEDAR: 00001745E

Calvalley Petroleum Inc on 6ix

Earlier from Calvalley Petroleum

Later from Calvalley Petroleum

All Calvalley Petroleum news releases