David Stein
CEO of Kuya Silver
Replay available
Kuya Silver (CSE:KUYA) reported Q3 2026 results on this call. Replay available.

On 6ix: 6ix.com/event/kuya-silver-corp-kuyaf-q3-2026-earnings-call
Automated transcript · Written by software from the replay's audio. It can mishear names and figures; the replay is the record.
0:01 Good evening, depending on where in the world you're signing in from. I know there's quite a few in the room today from all over, so I really appreciate you joining us today. I'm lucky enough to have with me today David Stein, CEO of QuiaSilver, to talk about the Q3 production numbers. David, how are you today?
0:16 I'm good, thanks. Romeo, how are you? I'm well, thank you. I'll do some real quick housekeeping and then I'll let David take it away. So how it's going to work is he's going to run through a quick presentation, but then we're going to get into questions. So please use that chat function at the bottom of your screen. We're going to have a couple of analyst questions to lead off, but then I'm really eager to hear from the live audience in the room here today. So please do mark any questions you have at any point during today's event into that chat box. We'll try and get to as many as we can. For those that I don't get to, I'll make sure the KUYA team gets those afters so they'll be able to follow up with you. You can also hit the request meeting button at the bottom of your screen to request a meeting with the KUYA team. Again, I'll try to pass those through as soon as the event is over. And finally, this is being recorded. We'll be available for replay both on this exact same link but also on Six's YouTube channel early this afternoon at Eastern Time.
1:05 David, without further ado, I'll let you get into that protein.
1:08 Okay. Thanks, everyone, for calling in. This is going to be our regular Q3 financial earnings call, and I'll go through a quick presentation on the results and some other updates at site at Bethania, and then happy to answer any questions. I mean, even though we put out our financials over the weekend, we have had quite a bit of news in October as well so fairly recently and so I'm happy to talk about any of that or any other questions that people have during the Q&A but I'll try and cover the real critical things here in the next few minutes and let's get at it so obviously we're happy to announced our Q3 results again a couple days ago with you know I think really the highlight as probably you know by now is that Q3 was very much kind of a ramp up and transition year quarter where we focused on a lot on development but the fact we were able to do all that and still retain you know such a strong cash position especially as you know the silver price continues to fall here, is
2:40 putting us in a really, really strong position going forward. So we're really happy about that. You know, nice to get some revenue back. We should have, you know, more, significantly more in Q3, although obviously that is silver price, sorry, Q4, that is silver price dependent to some degree. And then, you know, really continue to ramp things up into 2027. So, yeah. Things are going well and we can talk about that a little later on. Again, some of our big numbers. I know some people will be watching for us to hit positive income at some point. At the moment, we are expensing a lot of our costs at site because we're not in commercial production yet. So some of those costs in the E&E line will go into operating costs once we do declare commercial production and we'll be able to capitalize some of our true capex that we're investing in the longer term future of the mine.
3:56 So I guess what I would say is I wouldn't worry too much about the earnings at least for the next few quarters until we declare commercial production. But certainly keep an eye on the cash flow and the cash position because that, in my view, is much more important. That's really telling you how much cash we're burning or if we're adding cash to the balance sheet, etc. And and again, that shows a very strong picture in Q3 with us ending the quarter with 24 million US dollars in cash. In terms of other updates, we were able to start the drill program in Q3.
4:54 and now that we're I guess two months into that it's going it's starting to it's starting to hum along nicely so we're now with as of today over 2000 meters drilled and over the you know because this press release was was written last week and so yeah we're doing really well on that front I'll I'll I'll have a slide on that in a little bit. But, you know, that's definitely a highlight in terms of what's going on at site besides the ramp up operation stuff. We also commissioned our first underground loader. And so this is our first step really into mechanizing the mine.
5:43 You know, when we took over the mine several years ago, what we inherited was, I guess what you would call a conventional kind of mining set up with tracks and ore carts on rails. So we're still using those and we'll continue to use those for a while. But we can now load instead of with shovels and human basically lifting up ore, we can now use this loader, which I'll show you a picture of in a second, which makes a big difference to load the ore carts underground, which then go up outside. So here it is. There's in the orange on the left, that's our new loader. You can see it's a pretty big piece of equipment, but it fits very nicely in our tunnel there and it can do a lot of different jobs underground, but obviously the big one is lifting.
6:37 And then, you know, a couple other shots of what things look like outside of the mine once we get the material out. It comes out in the door carts and we're going to be able to pull more of those with with our stronger winches at site and then they get dumped into a loading area where the bigger trucks are loaded with that Komatsu loader and those go to the process plant. So that's kind of our cycle right now and we're just getting more and more daily production as we go in this cycle. and then eventually things will transition to the other side of the mine where we'll have the ramp and we'll be trucking material out and reducing our reliance on the ore carts system.
7:32 So again, just to look at this, we have shown this in one of our press releases, but we're kind of moving from the gradually going to move from the western side where the existing portal is to the eastern side where the Santa Elena portal, the Big Star, is planned. So that is not started yet, but we are planning to start that in the next month or so in terms of the development of that ramp and the drilling and blasting required to start that project. And it'll go kind of all the way through the mine at a shallow angle so we can drive trucks in and out and and it'll give certainly a much better traffic flow in terms of getting material out of the mine, bigger equipment so we'll be able to do more tons per day and also better ventilation because we'll have a really big tunnel to blow air through.
8:30 So it solves a lot of longer term problems. It's not going to prevent us from getting to 350 with our current setup as we've talked about in the past in the recent press releases. But as we think about the longer-term future of the mine and going beyond 350 to 500 or 750 cents per day or maybe even more, we need that kind of infrastructure. Okay. So, again, just a couple of nice photos there of what's going on. but we're really excited about the modernization that we're able to do.
9:16 These are not in and of themselves expensive pieces of equipment or projects. These are all things we can easily afford but they're going to make huge impacts on the mine not just in the near term but over many years. Okay, now let's transition to the drill program and talk about that a little bit.
9:38 We are... We are now in the thick of it, at least on the drilling part of it. Of course, for those who aren't aware, drilling the core is just one part of the job of getting those assay results that we all love so much. And we're now well onto that, over 2,000 meters drilled as of today. Once the core is drilled, it's logged by the geologist so they go through the core and mark all the structures and geology, different rock types, etc. So there's usually a lag on that, that takes a little bit longer and then the core is split in half and then half of it usually will go to the assay, so crushed up and then chemical tests are done on it to determine all the metals inside and that process is still ongoing right now.
10:41 But we're seeing visually really good things as expected because we're drilling right now into kind of the known vein system. So as I said, we're seeing more or less what we expect so far, which is great. Here's a plan view of looking at the whole drill program as planned. And at the moment, we're still sticking to this, although we can always modify it depending on the results that you start seeing from the drilling. But about 2,000 meters into this, it's going as planned so far. And right now we would be all on this side over here doing these shorter drill holes, but many of them. And so we're really setting up in two different drill bays right now, one drilling north, one drilling south.
11:34 So the one drilling south, you're going to be hitting the Doce de Mayo, Victoria, and other associated veins in that zone, that sort of southern portion of the mine. And then when we drill to the north, you're going to be hitting Espanola and some of the branches off of Espanola. So that's how things are going right now. The third rig, which is still on the way, is going to be put in the eastern edge of the mine workings and drill off to the east. And you can see those Green planned holes right now are longer drill holes that are targeting the hilltop zone. And so that's going to be an important part of how we move the whole system off to the west. And we are, you know, we will have a portal over on this side as well that will also potentially give us another place to drill from, maybe not this year, but in the future.
12:36 What else do I want to say about this? Oh, yeah. I do, you know, I've mentioned this on a couple of interviews and stuff like this, but you might be hearing this for the first time. But, you know, with all this drilling that we are doing and will continue to do into early 2027, we obviously need to talk about an updated resource estimate. And that's something we would expect to be able to do by middle of next year. So that will include essentially whatever we can do in terms of drilling these current veins deeper, which is what we're doing now. And perhaps we'll be able to add stuff, we'll be able to add data from the Hilltop Zone and also from Carmelitas as well, which is our first surface target, which I don't have a slide for today.
13:31 So kind of to conclude,
13:34 We're again in that strong financial position where we continue to make progress on the ramp up and we're, you know, November and December we're seeing some really, really good progress at the mine in terms of the tons per day moving up and getting us to a really good position to start the new year. The new ramp is going to be, as I mentioned, an important part of the longer term future and may give us some short term wins as it opens up that whole eastern area of the mine as well. And then the drill campaign is going to be a real big driver of value for us as well. I can't emphasize this enough, but for so many years we did not have any cash and so We couldn't drill and I do feel like that left us behind a little bit in terms of, yeah, we got the mine ramped up and restarted and ramping up, which is great. But the other part of your growth profile as a miner, especially a junior miner as we are right now, is to follow that up with adding resources.
14:50 And now we're able to do that. And we're able to do that in a really, really aggressive way, which is exciting. and we know we've always had the veins there. They've just been sitting there tantalizing us, taunting us, ready to be drilled for so many years and now we're able to do it and it's extremely exciting. I'll leave you with this. This is an AI graphic of our planned ramp but this is what it will look like and you can see the scale of what a four by four meter So with that, let's go to the questions. Awesome, appreciate it, David. So I'm going to start off with a couple of questions sent in by Mark Weichman, equity research analyst from Noble Capital Markets.
15:55 Then we'll get into some of the questions from the chat, and then if we've got time, I've got a couple of last ones to close us off. You wanted to ask first, you said much of 2026 has been devoted to underground development, infrastructure improvements, and establishing additional mining areas. How have these investments positioned Bethania for higher production and how do you envision silver equivalent output progressing through 27 and 28 as the operation advances towards that 350 TPD?
16:21 Yes, it's a good question. So let me back up and just mention something I wanted to mention earlier in the presentation, which you did mention in one of the recent press releases, which is how Lately, in the last, let's say, two, three months, we've been extremely successful at building up our workforce at site. And that has been a big bottleneck for us. If you go back, you know, sort of six plus months ago, we've, you know, our team in Lima and the team at site has really started to crack the code on recruitment. And we're now up to over 180 employees. people, headcount, all the operations staff at the mine.
17:10 Our target will be by end of this year or thereabouts to be around $250. So we're still hiring very, very fast right now, but it's going really, really well. When we look at where the capital dollars have been put, obviously underground development is When you're starting up a mine and you want to change the throughput, i.e. increase it, there's a certain amount of underground development, just building more tunnels, accessing more areas with ore that you just have to do ahead of time. And so we've been able to do that while we were still producing.
17:58 If you had all the money in the world, you probably wouldn't mine while you're doing all this mining. sort of early stage development. You just keep the mine shut down and just drill and blast all the tunnels you can. We got into this as more like we don't have all the money in the world. We need to generate some revenue as we go. And so that really geared our strategy towards more of a gradual ramp up. Nevertheless, we're now more than halfway through that now. We're well, well into it. And it's looking very good for 2027. So the underground development is a big part of it. And as I said, you always have to do development, even in a mature mind. But you have to do more when you're trying to increase the tonnage, the tons per day, increase the rate. So we've been doing that.
18:55 And as I said, we're probably coming to the tail end of that. as we go into early early 2027 and the other thing is is we've got to get the nothing it's it's great to do all the tunnels that you want you could make a whole ant farm under there but you need to get the ore out you need to get it out so you can process it and sell it and so that's the other that's the other piece of the puzzle and and so again you know through our our own innovation with our winch system which we're using currently pulling the ore carts out and then eventually the ramp where we will be able to do 350 and then potentially way, way more than that as the exploration kind of catches up to the mining.
19:43 We'd obviously like to and we expect to do significantly more from Bethania and then scale something similar as we go to potentially have multiple mines in the district like Carmelita's and others. as well. So that's really the impact of the investments we're doing today on the longer term picture. Great, appreciate that. Mark also had a question on the Camilla agreement. He notes it provides dedicated processing capacity while preserving capital for Bethania's own processing facility. He wants to know how you plan to accommodate increased mining volumes beyond Camilla's concentrated capacity, and what's the expected timeline for constructing and commissioning the 350 TPD day at Bethania plant?
20:30 Yeah, so I think to go significantly beyond 350, we really need to gear that to building the Batania plant, and it's still a top priority capital project for us. Look, I think given the significant drop in the silver price that we've been seeing, we just want to be really careful on... on how we spend our capital right now. And so I think we are still evaluating exactly how much and when that's going to be. And we do have a very big runway because essentially we could have exclusive access to the Camilla plant for the next two years.
21:17 And we'll just have to work with them to make sure that we can produce as much as we can from that plant. there's no magic upper limit on what they do there I know we announced 280 tons per day that's sort of the initial expansion based on that $400,000 loan we gave them but there's certainly potential that it could go above that and we'll just have to work with them on that in the near term and as I've said before on other calls there are other plans around so I really feel like you know as much as we can produce we can get it processed but we definitely want to get that plant built at some point in the next couple years because it will reduce our costs significantly and it'll take about a year to build it so we really want to plan that ahead of time so whether that's starting middle of next year or sometime later it's not going to be way later than that I think we've got to get it started probably sometime in 2027, but as to exactly when, I think we want to see the mine ramping up and generating its own cash flow to support the construction of that plant rather than having to rely too much on capital markets, etc.
22:43 Great, thank you. I think I'll do one more from Mark. You know that the 20,000 meter drilling program is the largest in Bethany's history, as you said today. Beyond expanding the mineral resource, how could successful drilling on the Española, the Doce de Mayo, Victoria, and other vein systems influence the mine plan, extend mine life, and potentially support production beyond the 350 TPD?
23:09 Look, I think we are... planning to use this drill program to plan the next few years of the mine. There is some of the drilling that's being done is not too far away from the mine workings. So that's more of the sort of infill conversion type drilling where we're converting the inferred resources from five years ago to to something higher than that, whether that's measured or indicated, you know, I don't know yet, but that would be the goal. Actually, I have, you know, I have the priorities here infill in here, sorry, the first bullet here under priorities.
23:59 So infill, add, infer to the depth, hilltop zone, and then, you know, updated resource. So that's all just the underground drilling. But Yeah, so that means it could impact our mine plan very soon, like even potentially in less than a year's time. Certainly if we find something and it's already near a mine working, you can very quickly shift your mine plan and go after it with some additional tunnels and additional development. Longer term, I think that we're doing way more drilling right now than we would need just to maintain the mine life. Sure. so this is really to expand is really the goal here and I don't see the current drill program as being the end of the story at all it's really just the beginning and we'll probably just keep reloading that drill program and keep drilling and we can go a lot deeper at Bethania than we're drilling right now in the next few months and some of the other similar mines in Peru go much, much deeper than where we are right now. I mean, we're still scratching the surface at the western side of Bethania there and you can kind of see the potential scale in this type of long section here of where we could go with this.
25:26 So I think the nice thing is if we do find or when we find this bigger resource. When we drill out this bigger resource, we will have the capacity to mine potentially as much as a thousand tons per day because we can still use the winch decline system for some production and then we can do most of it with the ramp as well. And so we have a lot of flexibility to dramatically increase the production as the resources start kicking in from the drill program. Great, thank you. I'm going to jump to a couple questions from the chat, just because everybody's been very patient there. First question came in from Hank.
26:11 He wanted to know, how has the transport of the ore from the mine progressed, rubber tires instead of rails?
26:19 Sorry, repeat the question? He wants to know how the transport of the ore from the mine has progressed, rubber tires instead of rails.
26:27 Okay, so right now we bring all the ore out. with the rail system. I have some, there's the rails going through, that's probably the main adit. And, you know, here's the ore carts lined up so that they're sitting on tracks ready to dump into our stockpile. So that's what we're doing right now and we'll continue to do for, you know, for some time until we, you know, We'll probably keep using that for the western part of the vein system for probably a few more years until we gradually move the whole mine off to the east and we'll start using the ramp exclusively.
27:15 But as I said before, we could use both if we need it, if we need the capacity. So the ramp will be, and again I'll go to the AI drawing here, the AI graphics. This will be rubber tires. You can see there's no rails there. This is going to be trucks going in and out of the mine from the east. Now after we get the material out of the mine, we load it into these bigger trucks, which you can see here, this orange one right here is one of our run-of-the-mill haul trucks. So that will be filled and that will go to the Camilla plant at the moment. and that's just on national roads that are maintained by the government actually.
28:05 We can go all the way on sort of regular gravel and or pavement roads to the mill. Okay, thanks. Juan from the chat wanted to know what are the TPD estimates for Q1-27?
28:21 We haven't put out updated numbers for Q1. We're going through the process of updating our budgets for the end of the year and into 2027 now. I think we're going to surprise people to the upside. I think we've gone through kind of a readjustment of the realities of how it's been to ramp up and in what's been a very, very difficult and volatile 2025 or 2026, especially after the euphoria of how the year started. But yeah, it's looking very good. We're still planning to hit the 350 in the first half of next year. And so if you take that into consideration, you can probably guess what we're going to do in Q1.
29:21 Sure. No, appreciate that. Kind of a follow-up question. HRSA Clements in the chat wants to know, to what production of silver ounces does the 350 TPD translate to?
29:33 It's about a million ounces a year, plus or minus, depending on the grade. Yeah. Great, thank you. One question from Rock in the chat. How long is the ramp going to be in at what grade?
29:47 I think it's 11 degrees, 11, 12 degrees. something like that and it will be I think the first section of it will be something like 700 or 800 meters and then we'll continue to kind of spiral it at depth in the center part of the mine after that but we'll, you know, that first section to basically get to where it's usable will be something around that. Okay. I appreciate that. Roland from the chat wants to know when do you estimate that the new hoist can be put into operation and when do you think the ramp will be completed? Might as well reiterate that as well.
30:34 So the the I think he means the winch so we're operating a winch right now and then we're renting kind of the medium sized one and then we're going to an even bigger one that we're purchasing early in the new year so that's just a continual process of improvement that will happen over the next few months and then you know by I guess the end of Q1 we'll have the new big winch that we purchased and is being manufactured for us and we'll that'll be that should be the final winch we should be able to use that one forever essentially on that western side of the mine where the current portal is.
31:23 And then the ramp, we're kind of working right now with, we're going to start the portal like in the next few weeks, very soon. We are working with contractors bidding that. It's a new job obviously so things have changed there since we were talking to contractors, let's say, six months ago, four to six months ago about a different ramp design. So we're going to look to bring in contractors for that. And so we'll have to see with the, we'll have to work with contractors to see how fast we do that ramp project. As I said, because we don't need it, it's not a bottleneck anymore.
32:09 We're not in like a massive hurry to do it but we'd still like to get it done because it has significant benefits for both exploration and mining and ventilation and all that stuff I mentioned earlier so I think it'll be from the time that's going with the contractor it'll be something like a year perhaps to get that first section done but it could be faster or slower depending on this silver price, you know, exactly what kind of deal we're doing with the contractor. Or maybe we supplement it with our own workers if we have a big enough workforce. That's always a possibility as well.
32:54 Great. I appreciate that. Elmer in twos, I'm going to loop those into a future question, so just appreciate your patience. Brian asks, have you updated your estimate of the cost for the new mill? If so, do you expect those costs to be incurred ratably over the next year?
33:09 We have not. That's something that's ongoing. That's another project, internal project that's ongoing. So, we'll speak to that when we have something new there. But, you know, as I mentioned in the preamble, exactly when we start that will depend on, you know, obviously how budgeting goes. as we look into 2027 and also the silver price as well because we want to ramp up the mine and start generating positive cash flow and we can do that without having our own plans so that's the priority number one and then whatever happens with the rest of our cash we can do that without you know with with our current cash position and still have cash left over.
34:09 What we do with the rest of that cash, we want to be very, very careful right now until we get a better sense of especially where the silver price is going. We don't want to get into a position where we are going to be forced to raise money at a low price, etc. We want to use that cash war chest, if you will, for lack of a better word, to our advantage. and that means, you know, maybe we aren't going to do absolutely every project under the sun that we'd like to do right now. We're going to, you know, I think sitting on cash and having that as a backstop is a better use of our capital right now. Great, appreciate that. Christian, I'll save your question towards right at the end. Roland wants to know, what determines the amount of ore you will transport tomorrow?
34:55 Are there plans to begin or prepare for work, groundworks on your own mill?
35:02 I think I just answered that on the mill question but yeah I think we're constantly working with the Camilla team to optimize the mill over there and we'll be in the position to basically fill it pretty soon so that's something that's ongoing but As we said in the Camilla press release, which was, I guess, three press releases ago or two press releases ago, the initial expansion using our loan is going to be 280 tons per day, but then we can go higher than that. It just might require an additional investment.
35:51 Sars from the chat says just jumping off the comments about the final winch being installed in the next few months he wants the clarity on the actual winch capacity which is installed right now I'm not sure what you mean by capacity but I think it's 50 horsepower so the one that's the one that we bought that's coming for February is 175 so it's more than was that three and a half times bigger? Sure. Okay, right on. Christian from the chat wants to know how many hours per day is the Bethania mine operating at this point in time?
36:29 It operates 24 hours a day. Great, thank you. I'm going to combine a couple questions into one that was actually asked by Mark Reckman, but it should cover a couple questions that were unanswered in the chat. So, you know, with approximately $24.4 million in cash as of September 30th, you've got flexibility to advance Bethania, which is something you've echoed today as well, David. Also, what are the remaining capital requirements to achieve the initial production target and construct the company's processing plant? Assuming the ramp-up proceeds as planned, when could Bethania begin generating sustainable, positive, free cash flow, and how do you think that position is created by the end of 28?
37:07 Well, again, you tell me the silver price, and I can... I can tell you when we'll be generating positive free cash flow so look at starting to repeat myself but we're going through the process of budgeting we're going through the process of updating the capex for the plant that's a separate project and you know we don't expect it to be dramatically different than what I've kind of estimated in the past, but we still have to do the work and figure out all the individual pieces of equipment, where we're going to order them from, how much they're going to cost, how long it's going to take, etc. So we're basically doing detail engineering all over again, even though we did it four or five years ago. So that's a process that's ongoing.
38:00 As I said, given our good relationship with Camilla and we don't have to be in a massive hurry there. We have to be in a little bit of a hurry, but we have probably a year of grace at least before it becomes an urgent project to deal with. So, ideally, we're going to be building that plant through cash flow from the mine, and that would be the goal here, which might push it to starting later in 2027. Great. Thank you. Time for a couple more questions, then we're going to wrap up.
38:45 One from the chat asks, just your thoughts and perspective on being added to the SLJ ETF a few days ago.
38:54 Thank you. That's a great question. So, yeah, we were added on Friday, or there was a big 2 million shares of stock that were purchased to add Kuya to the SILJ index. As I understand, actually, there was a change in the methodology with the index that it tracks. So the index, the guys who decide what's in an index and the guys who actually buy and construct the ETF, it's two different companies. And it was actually the index that changed their methodology to actually allow CFD companies, which...
39:44 for the first time, and so we were added for that reason, I believe. And the initial position is quite small in terms of our weighting, but just getting in there means that as the... And getting in there basically at the bottom of the market, which is amazing, because what it means is when there's inflows into the ETF, they're going to have to buy more KUYA shares. And... and so, you know, you want to go in at the bottom rather than the top because at the top, you know, then they're going to be selling your shares as they get a, you know, because when funds lose money, they have to sell their components, their holdings, whether it's a mutual fund or an ETF, they have to sell their holdings to generate cash and give that cash back to their investors, right? And so, right now, it's the opposite where, you know, hopefully, anyway, we're on the bottom.
40:41 They're still taking an initial position in Kuya and then that position will grow as we go, you know, as the silver price and interest in our sector goes back up. Okay, thank you. Moving gears completely, as Christian from the chat wants to know, what are your thoughts on refunding the expenses and expanding Kuya's share in the project in Saudi Arabia next year?
41:06 We're still evaluating it. It's, we're I have to say we're very happy with how it's gone geologically speaking. I think it's been an undisputed success from the point of view of the drill results that we've achieved to date and continue to see from this site. But obviously we have to look at it in the context of the market and how it can impact Kuya's share price ultimately. That's what it's got to be all about. If there's a way for us to be involved in that and that we think is going to add shareholder value, i.e.
41:51 result in a higher share price for Kuya down the road, then that's something we have to look at very seriously. But we're still evaluating that and we'll continue to do that over the next few months. Great, appreciate it. Last question before we wrap up today. Bill Warren wanted to know are insiders buying shares at these levels but I'll add are they allowed to at the current time?
42:12 Yeah, obviously we can't buy when we have material news coming out because we're blacked out a lot of the time. But yeah, it'll be reported on S-A-D-I and it'll be carried on places like CEO.ca and stuff they track They tracked the filings and so all I would say is when we do buy, you will know about it very, very quickly after. There you go. Appreciate it. Well, David, thank you so much for running through Q3 financials and production update with us. Thanks, everybody. I know there were a lot of you in the room, so I really appreciate everybody joining us. If anybody does have any final questions they think of once the event ends, you can request a meeting with David and the creative team at the bottom, or you can reach out in response to any of the emails about the event and get that question answered. David, I'll throw it to you for a last word, but thanks for joining today.
43:13 Yeah, look, I mean, we're now more than halfway through Q4. Very happy with how things are going at site, ramping up. We really seem to turn the corner, especially from late Q3 to now, in terms of the production, in terms of the staffing levels, in terms of the equipment arriving at site and being able to be used for higher throughput. So a lot of the things that have been bottlenecking us or kind of bogging us down earlier in the year are starting to be resolved. little by little and we're very very happy and I'm excited to talk more in the new year about our T4 results and continue to show incremental quarter over quarter growth of production cash flow and then also the I have high expectations for the exploration results as well which will probably be talking about early in the new year as well.
44:13 So lots of great things to come in the next few months and beyond. And for those who are shareholders, thank you for your support. I think we're on to something really, really big here and it's going to be an exciting two years. David, thank you so much and thanks everybody for joining us. Have a great day.
44:33 Bye.
Follow Kuya Silver Corporation into a list and get an email when it puts out news.
CEO of Kuya Silver