Iron Bear Resources Ltd · ASX:IBR
Iron Bear Resources — Cape Lambert Iron Ore — Non-Deal Roadshow (April 2006)
16 slides from Iron Bear Resources's roadshow presentation, Apr 20, 2006

Slide 1: CFE to List on AIM (4 May 2006)
20 April 2006 The Company Announcements Office Australian Stock Exchange Limited Via E Lodgement CFE TO LIST ON AIM (4 MAY 2006) Cape Lambert Iron Ore Ltd (ASX: CFE) is pleased to announce that its shares will be officially quoted on AIM on 4 May 2006. The Company believes the AIM listing will maint

Slide 2: Western Australian Iron Ore Project
Western Australian Iron Ore Project April 2006

Slide 3: Corporate Profile
Corporate Profile Total Shares on Issue 250 m Options 31 October 2008 @ $0.277 (ASX: CFEO) 136.6 m 31 October 2009 @ $0.327 50 m 31 October 2010 @ $0.377 40 m Cash at Bank 16 m Liquid Assets 2m Current as of April 2006 2

Slide 4: Majority Shareholders
Majority Shareholders Name Number % Issued Capital National Nominees Ltd 46,120,632 18.51% JP Morgan Fleming Aust Ltd 22,750,000 9.13% Power United Limited 18,328,363 7.35% Westpac Custodian Nominees Ltd 11,991,147 4.81% AWP Sage 11,720,075 4.70% Citicorp Nominees Pty Ltd 10,975,054 4.40% Waterloo A

Slide 5: Management
Management Mr Tony Sage – Executive Chairman Mr Sage has in excess of 25 years of experience in the field or corporate advisory services, funds management and capital raising. Mr Sage has been involved in the management and financing of listed mining companies in Australia and internationally for th

Slide 6: Corporate Strategy
Corporate Strategy • Join Venture / Sell the Romanian Copper/Gold Project • Disposal of shareholdings in Jackson Gold, Republic Gold, Great Australian and Polaris (net approx $AUD2.3million) • Progress BFS on Cape Lambert Deposit and initiate exploration work at Mt Anketell 5

Slide 7: Corporate Strategy
Corporate Strategy • Finalise negotiations with 2 major Chinese groups Shandong and Sinosteel. Shandong Finalise negotiations to purchase 19.9% of CFE on market for 100% of the off take. Sinosteel Second largest Chinese steel group wishes to JV (50/50) and build infrastructure for 100% of the off ta

Slide 8: Cape Lambert Region
Cape Lambert Region (Western Australia) Cape Lambert BHP/ Shell/ Woodside Cape Lambert NW Shelf Gas 2.5bt Resource >$9 billion p/a Rio Tinto Cape Lambert Port >45mt Iron Ore p/a Rio Tinto Wickham Dampier Port Tenement boundary >80 mt Iron Ore p/a (220 sq/km) Ó line Dampier Pipe s Ga Legend Karratha

Slide 9: Cape Lambert JORC Resource
Cape Lambert JORC Resource 2.5 Billion Tonnes @ 30%Fe 1.4bt in Indicated Resource category 1.1bt in Inferred Resource category (250m depth & 25%Fe cut off) 1.2 Billion Tonnes @ 33%Fe 0.67bt in Indicated Resource category 0.53bt in Inferred Resource category (250m depth & 30%Fe cut off) This Resource

Slide 10: Cape Lambert Geology
Cape Lambert Geology Mount Roe basalt Dolerite an d gabbro Cape Lambert Port Banded Iron (Rio Tinto >45mt iron ore p/a) Karrath a granodiorite Formation Banded iron formation Exploration Target Chert railway railway line Sedim ents Felsic volcanics Basalt Ultramafics 60% Fe Power Robe Target Station

Slide 11: Current Resource
Open along strike to the North Current Resource • 2.5bt Resource Open to the West • Significant upside, the resource is open to: • North • West • South Open along strike to the South • At Depth 10

Slide 12: Cape Lambert Logistic Advantages
Cape Lambert Cape Lambert Deposit Di st Logistic an ce Ra ~5 km il wa y Lin Advantages e • 5km from Coast • Direct connection to Gas, Power, Infrastructure, Local Workforce etc • $2.5million per/km:- Fortescue (FMG) 450km Mt Gibson (MGX) 400km Iron Ore Holdings (IOH) 250km Cape Size Vessel Gindalbie

Slide 13: Major Australian Magnetite Deposits
Major Australian Magnetite Deposits Cape Lambert deposit is located on the north west coast of Western Australia, 20km north of Karratha which is a major distribution hub for iron ore, gas, etc. Darwin Close Proximity from Cape Lambert to Asian Steel Mills Cape Lambert 2,500mt 2,500mt NT NT Qld QLD

Slide 14: Bankable Feasibility Components
Bankable Feasibility Components • 2.5 Billion Tonnes JORC compliant Resource • 50+ year mine life • 5mtpa – 10mtpa concentrator to >60% iron • Capital ex requirements to turn key, est. $350 million • AVG Waste Ratio 0.6 : 1 • Recovery 30 - 35% 13

Slide 15: Comparison of Similar Companies
Comparison of Similar Companies Capital Structure Current Market Shares Options Capitalisation Est. Cap Tonnes (Million) (Million) (Million $) EX (Million) Fortescue Metals (FMG) 224 2 1,350 2,500 1,100 Mt Gibson (MGX) 401 25 370 800 250 Gindalbie Metals (GBG) 385 22 275 1,100 730 Grange Resources (

Slide 16: Summary
Summary • Location - 5km’s from Coast • Significant infrastructure already in place (power, road, water and populated areas) • Substantial Tonnage with significant upside • Stable political and economic environment • Proximity to Asian markets 15
Source: Internet Archive copy of capelam.com.au
More decks from Iron Bear Resources Ltd
Shareholder Meeting (November 2026)25 slides · Nov 23, 2026
Investor Presentation (June 2026)23 slides · Jun 17, 2026
Investor Presentation (May 2026)24 slides · May 6, 2026
Cape Lambert Resources — Mining Indaba 201833 slides · February 2018
Cape Lambert Resources — Mines and Money London 201730 slides · November 2017
Cape Lambert Resources — Investor Presentation (May 2017)29 slides · May 2017