Iron Bear Resources Ltd · ASX:IBR

Iron Bear Resources — Investor Presentation (June 2026)

23 slides from Iron Bear Resources's investor presentation, Jun 17, 2026

  1. Slide 1: Project Highlights and Development Strategy

    PROJECT HIGHLIGHTS AND DEVELOPMENT STRATEGY A World Class Iron Ore Development In Canada ASX: IBR • I R O N B E A R R E S O U R C E S L T D PROJECT IRON BEAR | A WORLD CLASS IRON ORE DEVELOPMENT IN CANADA 1

  2. Slide 2: Disclaimer

    Disclaimer ASX: IBR This presentation may contain forecasts and forward-looking information. Such forecasts, projections and information are not a guarantee of future performance and may involve unknown risks and uncertainties. Actual results and developments will almost certainly differ materially

  3. Slide 3: Iron Bear Project Highlights & Recent Developments

    Iron Bear is a world class iron ore project, being jointly developed with Vale, which is positioned to dominate the high value and high growth Direct Reduction iron ore market ASX: IBR IRON BEAR PROJECT HIGHLIGHTS & RECENT DEVELOPMENTS 1 Iron Ore Magnetite project located in Canada, less than 35km f

  4. Slide 4: Joint Venture with Vale to Develop Iron Bear

    Iron Bear and Vale executed a Development Agreement to bring the Iron Bear Project to Decision to Mine and provides a clear pathway to production ASX: IBR JOINT VENTURE WITH VALE TO DEVELOP IRON BEAR1 Under the terms of the agreement, Vale has the right to provide up to USD138 million of funding to

  5. Slide 5: Deliverables

    The Iron Bear Project underpinned by a clear operational plan to rapidly de-risk the asset and enable Vale to achieve decision to mine in 3 to 4 years ASX: IBR IRON BEAR JV STRATEGIC PLAN Operational Op. milestone X X X Op. milestone X Op. milestone As of June 2026 milestone achieved started delayed

  6. Slide 6: Tenements Location

    Iron Bear has privileged access to infrastructure and 1 hydropower, in proximity to major iron producers ASX: IBR TENEMENTS LOCATION • The tenements are located in Newfoundland Labrador, approximately 35 km northwest from the town of Schefferville • The Property consists of 14 contiguous map staked

  7. Slide 7: Positive Legislative Change to Support Resource Industry

    1 Application for the Status of Project of National Significance in Canada1 ASX: IBR POSITIVE LEGISLATIVE CHANGE TO SUPPORT RESOURCE INDUSTRY • June 2025: the Parliament of Canada passed the Building Canada Act to create the legislative framework to enable the federal government to streamline federa

  8. Slide 8: Board of Directors

    IBR has a strong leadership team and committed Board with the right Corporate Snapshot set of skills, to bring the Iron Bear project to Decision to Mine Iron Bear Resources |ASX:IBR ASX: IBR Board of Directors David Sanders Paul Berend Chairman Managing Director and CEO 68.6 0.018/0.081 Market Capit

  9. Slide 9: Iron Ore Resource

    IRON ORE RESOURCE World class 100% owned Iron ore mineral resource of 13.6 billion tonnes @ 30.03 Fe% (inferred and indicated JORC 2012 compliant) Refer to ASX announcement 12th May 2026 ASX: IBR • I R O N B E A R R E S O U R C E S L T D 9 9 PROJECT IRON BEAR | A WORLD CLASS IRON ORE DEVELOPMENT IN

  10. Slide 10: Mineral Resource Estimate

    2 Iron Bear has a world class JORC1 compliant mineral resource of 13.6 billion tonnes including 4.5 Bt in the indicated category ASX: IBR MINERAL RESOURCE ESTIMATE2 Cut-off 12.5% Magnetic Fe CATEGORY Tonnes (Billion) Total Fe% Mag Fe% • An upgraded mineral resource statement is supported by geophysi

  11. Slide 11: Iron Bear Drilling Locations

    2 115 diamond drill holes have been completed totalling 28,021m of core. There is an excellent correlation between the drilling and the magnetic inversion models1 ASX: IBR IRON BEAR DRILLING LOCATIONS • Two major drilling campaigns were completed in 2011 and 2012 and over 100t of drilling were colle

  12. Slide 12: Premium Quality Product

    PREMIUM QUALITY PRODUCT Production of high-quality DR* grade concentrate grading 71% Fe and 1.2% SiO2 due to an exceptional low impurity ore body Refer to ASX announcement 12th May 2026 DR* = Direct Reduction refers to the production of high purity magnetite concentrates necessary for Direct Reducti

  13. Slide 13: Magnetite Concentrate Specifications

    3 Metallurgical test work delivered high quality magnetite concentrates with high Fe yields, low silica and very low deleterious elements including manganese* ASX: IBR MAGNETITE CONCENTRATE SPECIFICATIONS % by weight Fe SiO2 Al2O3 CaO MgO MnO P2O5 Stotal TiO2 DR concentrate 71 1.2 < 0.1 0.07 0.06 0.

  14. Slide 14: Iron Bear DR Pellets Specifications

    3 Iron Bear has produced 300 kg of Direct Reduction (DR) pellets which have world class properties physical and metallisation properties, and ultra-low deleterious elements ASX: IBR IRON BEAR DR PELLETS SPECIFICATIONS Only three companies in the world can supply similar DR pellets on the seaborne ma

  15. Slide 15: Iron Ore Market

    IRON ORE MARKET Iron Bear is targeting the high value Direct Reduction Pellet Market anticipated to grow by 32% from 180 Mtpa to 266 Mtpa by 2035* Refer to Wood Mackenzie, Global iron ore investment horizon outlook – Q3 2025 ASX: IBR • I R O N B E A R R E S O U R C E S L T D 15 15 PROJECT IRON BEAR

  16. Slide 16: Transition in Iron Ore and Steelmaking – 2024 to 2035

    4 Transition in Iron Ore and Steelmaking – 2024 to 2035 ASX: IBR Global Steel Production by Process, 2024* Iron Ore Consumption by Product Type Total = 1,854 Mta, 2024 DR Pellet consumption is set to increase by 86Mt to 2035 387 2024 2035 21% Total = 2,290 Mta Total = 2,290 Mta 144 8% 180 266 8% 12%

  17. Slide 17: Pellet Demand

    4 MENA will drive a large increase in pellet demand, as GCC countries seek to take full advantage of their natural gas resources ASX: IBR Pellet Demand (in Mt) GCC countries are aggressively buildind DR steel mills and Vale is prioritising this region for its steel hubs PROJECT IRON BEAR | A WORLD C

  18. Slide 18: Value in use adjustment factors

    4 With adjustments based on product quality, the Iron Bear DR concentrate sits in the first quartile on the value-adjusted cost curve ASX: IBR Value in use adjustment factors product properties versus the 62% benchmark and applies the resulting premium or discount to the CFR cash cost. VIU Adjustmen

  19. Slide 19: Scoping Study

    SCOPING STUDY Iron Bear scoping study delivers robust economics with conservative long term price assumptions of USD 90/t for the IODEX 62% benchmark* *Refer to ASX announcement 11th August 2025 ASX: IBR • I R O N B E A R R E S O U R C E S L T D 19 19 PROJECT IRON BEAR | A WORLD CLASS IRON ORE DEVEL

  20. Slide 20: Financial Evaluation of Base Case Scenario

    Iron Bear Resources completed a scoping study in August 2025 which outlines compelling 5 economics with conservative price assumptions (long term iron ore price USD 90/t CFR*) ASX: IBR FINANCIAL EVALUATION OF BASE CASE SCENARIO 25 Mta PRODUCTION1 Nominal Life of Mine Cash Flows Post-tax NPV8% 8,000

  21. Slide 21: Senior Leadership

    Highly credible leadership team with experience in developing Corporate Snapshot large scale mining projects Iron Bear Resources |ASX:IBR ASX: IBR Senior Leadership Paul Vermeulen Floriane Desmergers VP Technical and Engineering GM Sustainability and Public Affairs 68.6 0.018/0.081 Market Capitaliza

  22. Slide 22: Compliance Statements

    Compliance Statements ASX: IBR Mineral Resource Competent Person The information in this report that relates to Mineral Resources is based on information compiled by Elizabeth Haren, a Competent Person who is a Fellow of The Australasian Institute of Mining and Metallurgy and a member of the Austral

  23. Slide 23: Thank You!

    THANK YOU! Project Highlights and IRON BEAR RESOURCES LTD ASX: IBR Development Strategy CONTACT: IR@IRONBEAR.ORG WEB:WWW.IRONBEARRESOURCES.COM