  1. Slide 1: Project Highlights and Development Strategy

    For personal use only PROJECT HIGHLIGHTS AND DEVELOPMENT STRATEGY A World Class Iron Ore Development In Canada ASX: IBR • I R O N B E A R R E S O U R C E S L T D PROJECT IRON BEAR | A WORLD CLASS IRON ORE DEVELOPMENT IN CANADA 1

  2. Slide 2: Disclaimer

    Disclaimer ASX: IBR This presentation may contain forecasts and forward-looking information. Such forecasts, projections and information are not a guarantee of future performance and may involve unknown risks and uncertainties. Actual results and developments will almost certainly differ For persona

  3. Slide 3: Iron Bear Project Highlights & Recent Developments

    Iron Bear is a world class iron ore project, being jointly developed with Vale, which is positioned to dominate the high value and high growth Direct Reduction iron ore market ASX: IBR IRON BEAR PROJECT HIGHLIGHTS & RECENT DEVELOPMENTS 1 Iron Ore Magnetite project located in Canada, less than 35km f

  4. Slide 4: Joint Venture with Vale to Develop Iron Bear

    Iron Bear and Vale executed a Development Agreement to bring the Iron Bear Project to Decision to Mine and provides a clear pathway to production ASX: IBR JOINT VENTURE WITH VALE TO DEVELOP IRON BEAR1 Under the terms of the agreement, Vale has the right to provide up to USD138 million of funding to

  5. Slide 5: Iron Bear JV Strategic Plan

    The Iron Bear Project underpinned by a clear operational plan to rapidly de-risk the asset and enable Vale to achieve decision to mine in 3 to 4 years ASX: IBR IRON BEAR JV STRATEGIC PLAN Operational Op. milestone X X X Op. milestone X Op. milestone As of May 2026 milestone achieved started delayed

  6. Slide 6: 2025 Transformational Year of Operational Progress

    2025 was a transformational year of rapid operational progress and the year in which Vale committed to the Iron Bear project ASX: IBR May 2025 Februray 2025 Oct 2025 Nov 2025 Pellet Plant July 2025 For personal use only Agreement with August 2025 Rail Study Process Plant operational design Slurry pi

  7. Slide 7: Tenements Location and Infrastructure

    Iron Bear has privileged access to infrastructure and 1 hydropower, in proximity to major iron producers ASX: IBR TENEMENTS LOCATION • The tenements are located in Newfoundland Labrador, approximately 35 km northwest from the town of Schefferville For personal use only • The Property consists of 14

  8. Slide 8: Iron Ore Resource

    For personal use only IRON ORE RESOURCE World class 100% owned Iron ore mineral resource of 16.6 billion tonnes @ 29.3 Fe% (inferred and indicated JORC 2012 compliant) Refer to ASX announcement 11th April 2024 ASX: IBR • I R O N B E A R R E S O U R C E S L T D PROJECT IRON BEAR | A WORLD CLASS IRON

  9. Slide 9: Mineral Resource Estimate

    2 Iron Bear has a world class JORC1 compliant mineral resource of 16.7 billion tonnes including 2.15 Bt in the indicated category ASX: IBR MINERAL RESOURCE ESTIMATE2 Cut-off 12.5% Magnetic Fe • An upgraded mineral resource statement is For personal use only CATEGORY Tonnes (Billion) Total Fe% Mag Fe

  10. Slide 10: Iron Bear Drilling Locations

    2 115 diamond drill holes have been completed totalling 28,021m of core. There is an excellent correlation between the drilling and the magnetic inversion models2 ASX: IBR IRON BEAR DRILLING LOCATIONS • Two major drilling campaigns were completed in 2011 and 2012 and over 100t of drilling were colle

  11. Slide 11: Premium Quality Product

    For personal use only PREMIUM QUALITY PRODUCT Production of high-quality DR* grade concentrate grading 71% Fe and 1.2% SiO2 due to an exceptional low impurity ore body Refer to ASX announcement 23rd April 2024 DR* = Direct Reduction refers to the production of high purity magnetite concentrates nece

  12. Slide 12: Magnetite Concentrate Specifications

    3 Metallurgical test work delivered high quality magnetite concentrates with high Fe yields, low silica and very low deleterious elements including manganese* ASX: IBR MAGNETITE CONCENTRATE SPECIFICATIONS % by weight Fe SiO2 Al2O3 CaO MgO MnO P2O5 Stotal TiO2 For personal use only DR concentrate 71

  13. Slide 13: Iron Bear DR Pellets Specifications

    3 Iron Bear has produced 300 kg of Direct Reduction (DR) pellets which have world class properties physical and metallisation properties, and ultra-low deleterious elements ASX: IBR IRON BEAR DR PELLETS SPECIFICATIONS For personal use only Only three companies in the world can supply similar DR pell

  14. Slide 14: Iron Ore Market

    For personal use only IRON ORE MARKET Iron Bear is targeting the high value Direct Reduction Pellet Market anticipated to grow by 32% from 180 Mtpa to 266 Mtpa by 2035* Refer to Wood Mackenzie, Global iron ore investment horizon outlook – Q3 2025 ASX: IBR • I R O N B E A R R E S O U R C E S L T D 14

  15. Slide 15: Transition in Iron Ore and Steelmaking 2024 to 2035

    4 Transition in Iron Ore and Steelmaking – 2024 to 2035 ASX: IBR Global Steel Production by Process, 2024* Iron Ore Consumption by Product Type Total = 1,854 Mta, 2024 DR Pellet consumption is set to increase by For personal use only 86Mt to 2035 387 2024 2035 21% Total = 2,290 Mta Total = 2,290 Mta

  16. Slide 16: MENA Driving Pellet Demand Increase

    4 MENA will drive a large increase in pellet demand, as GCC countries seek to take full advantage of their natural gas resources ASX: IBR Pellet Demand (in Mt) For personal use only GCC countries are aggressively buildind DR steel mills and Vale is prioritising this region for its steel hubs PROJECT

  17. Slide 17: Iron Bear DR Concentrate on Value-Adjusted Cost Curve

    4 With adjustments based on product quality, the Iron Bear DR concentrate sits in the first quartile on the value-adjusted cost curve ASX: IBR Value in use adjustment factors product properties versus the For personal use only 62% benchmark and applies the resulting premium or discount to the CFR ca

  18. Slide 18: Scoping Study

    For personal use only SCOPING STUDY Iron Bear scoping study delivers robust economics with conservative long term price assumptions of USD 90/t for the IODEX 62% benchmark* *Refer to ASX announcement 11th August 2025 ASX: IBR • I R O N B E A R R E S O U R C E S L T D 18 18 PROJECT IRON BEAR | A WORL

  19. Slide 19: Scoping Study Financial Evaluation of Base Case

    Iron Bear Resources completed a scoping study in August 2025 which outlines compelling 5 economics with conservative price assumptions (long term iron ore price USD 90/t CFR*) ASX: IBR FINANCIAL EVALUATION OF BASE CASE SCENARIO 25 Mta PRODUCTION1 Nominal Life of Mine Cash Flows Post-tax NPV8% For pe

  20. Slide 20: Schedule to Pre-Feasibility Study

    5 Schedule to Pre- Feasibility Study ASX: IBR For personal use only Notes PROJECT IRON BEAR | A WORLD CLASS IRON ORE DEVELOPMENT IN CANADA 20

  21. Slide 21: Leadership Team and Board of Directors

    IBR has a strong leadership team and committed Board with the right Corporate Snapshot set of skills, to bring the Iron Bear project to Decision to Mine Iron Bear Resources |ASX:IBR ASX: IBR Board of Directors David Sanders Paul Berend Chairman Managing Director and CEO 54.0 0.018/0.081 For personal

  22. Slide 22: Senior Leadership

    Highly credible leadership team with experience in developing Corporate Snapshot large scale mining projects Iron Bear Resources |ASX:IBR ASX: IBR Senior Leadership Paul Vermeulen Floriane Desmergers VP Technical and Engineering GM Sustainability and Public Affairs 54.0 0.018/0.081 For personal use

  23. Slide 23: Compliance Statements

    Compliance Statements ASX: IBR Mineral Resource Competent Person The information in this report that relates to Mineral Resources is based on information compiled by Elizabeth Haren, a Competent Person who is a Fellow of The Australasian Institute of Mining and Metallurgy and a member of the Austral

  24. Slide 24: Thank You

    For personal use only THANK YOU! Project Highlights and IRON BEAR RESOURCES LTD ASX: IBR Development Strategy CONTACT: IR@IRONBEAR.ORG WEB:WWW.IRONBEARRESOURCES.COM