Iron Bear Resources Ltd · ASX:IBR

Iron Bear Resources — Shareholder Meeting (November 2026)

25 slides from Iron Bear Resources's shareholder meeting presentation, Nov 23, 2026

  1. Slide 1: AGM Presentation - Project Iron Bear

    Slide 1: AGM Presentation - Project Iron Bear

    rsonal use only AGM Presentation Project Iron Bear 23rd of November 2026 ASX: IBR • I R O N B E A R R E S O U R C E S L T D PROJECT IRON BEAR | A WORLD CLASS IRON ORE DEVELOPMENT IN CANADA 1

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer ASX: IBR This presentation may contain forecasts and forward-looking information. Such forecasts, projections and information are not a guarantee of future performance and may involve unknown risks and uncertainties. Actual results and developments will almost certainly differ materially

  3. Slide 3: Iron Bear project highlights

    Slide 3: Iron Bear project highlights

    Iron Bear is a world class iron ore project located in the Labrador Trough, positioned to benefit from the high value and high growth low carbon iron ore market ASX: IBR IRON BEAR PROJECT HIGHLIGHTS 1 Iron Ore magnetite project located in the Labrador Trough in Canada, tier one rsonal use only minin

  4. Slide 4: Overview of Iron Bear updated PFS

    Slide 4: Overview of Iron Bear updated PFS

    The updated PFS substantially increases the financial attractiveness of the Iron Bear project compared to the initials PFS dated July 2026, with no changes to the underlying key assumptions ASX: IBR OVERVIEW OF IRON BEAR UPDATED PFS rsonal use only ▪ Iron Bear Project NPV: Increase from USD 9.0B to

  5. Slide 5: Production increased with reduced CAPEX between Updated and Initial PFS

    Slide 5: Production increased with reduced CAPEX between Updated and Initial PFS

    Production has been increased, with reduced CAPEX, between the Updated and Initial PFS ASX: IBR BASE CASE UPDATED PFS INITIAL PFS VARIATION NPV8% USD 11.6 billion USD 9.0 billion +29% rsonal use only IRR %, 17.9 % 15.2 % post-tax +18% CAPEX Preproduction USD 4.0 billion USD 4.2 billion -5% Productio

  6. Slide 6: Iron Bear project NPV improvement waterfall

    Slide 6: Iron Bear project NPV improvement waterfall

    Five improvement levers were actioned to improve the NPV of the Iron Bear Project ASX: IBR IRON BEAR PROJECT NPV IMPROVEMENT WATERFALL rsonal use only 6 PROJECT IRON BEAR | ASX:IBR | A WORLD CLASS IRON ORE DEVELOPMENT IN CANADA

  7. Slide 7: Updated PFS base case scenario description

    Slide 7: Updated PFS base case scenario description

    The Updated PFS is based on similar operational phases as the initial PFS but with higher throughput for each process train ASX: IBR UPDATED PFS BASE CASE SCENARIO DESCRIPTION ULTIMATE PIT DESIGN • Production Target: 25.9 Mtpa, comprising 7.3 Mtpa Blast Furnace (BF) Concentrate and 18.6 Mtpa Direct

  8. Slide 8: Detailed engineering design and layouts for key assets (1/2)

    Slide 8: Detailed engineering design and layouts for key assets (1/2)

    The Updated Pre-feasibility Study delivered a detailed engineering design and layouts for all the key assets (1/2) ASX: IBR rsonal use only Ultimate pit design — year 40 Concentrator flowsheet — designed by Hatch with operational assumptions and inputs from test Production plant design — three 9.2 M

  9. Slide 9: Detailed engineering design and layouts for key assets (2/2)

    Slide 9: Detailed engineering design and layouts for key assets (2/2)

    The Updated Pre-feasibility Study delivered a detailed engineering design and layouts for all the key assets (2/2) ASX: IBR MINING AND PRODUCTION AREA LAYOUT PRODUCTION PLANT DESIGN rsonal use only Soil PIT (year 44) WRD #1 Soil WRD #3 TSF PROJECT IRON BEAR | ASX:IBR | A WORLD CLASS IRON ORE DEVELOP

  10. Slide 10: Timelines to DTM unchanged after Vale's departure

    Slide 10: Timelines to DTM unchanged after Vale's departure

    Timelines to DTM remaining unchanged after Vale’s departure, subject to Phase 2 funding secured before end of 2027 (Milestone 20 ) ASX: IBR IRON BEAR JV STRATEGIC PLAN X Operational milestone X Critical path X Value driver Env. milestones milestone As of November 2026 Phase 1 Phase 2 rsonal use only

  11. Slide 11: Seeking referral to the Major Projects Office

    Slide 11: Seeking referral to the Major Projects Office

    Iron Bear is seeking to be formally referred to the Major Projects Office (MPO) which would 16 provide accelerated permitting for the project and access to federal funding for the CAPEX ASX: IBR Jun 2025 C-5 Building Canada Act — legislative framework to streamline federal approvals for major projec

  12. Slide 12: Market conditions similar to when Vale deal was signed

    Slide 12: Market conditions similar to when Vale deal was signed

    Market conditions are similar to when the Vale deal was signed … 20 Demand for DR pellets increasing in MENA, USA and Europe due to new DR projects ASX: IBR rsonal use only Vale deal negotiated Vale deal Aug-Oct 25 closed Today 92-100 USD/t 102 USD/t 91 USD/t 12 PROJECT IRON BEAR | ASX:IBR | A WORLD

  13. Slide 13: Compelling value proposition for DR pellet supply

    Slide 13: Compelling value proposition for DR pellet supply

    The Iron Bear project is a compelling value proposition for industry participants looking to 20 secure a reliable supply of DR pellets, to enable low-cost and low-carbon steel production ASX: IBR 1 High growth and high vale DR pellet Transition of the steel industry to low rsonal use only carbon and

  14. Slide 14: Appendix

    Slide 14: Appendix

    rsonal use only APPENDIX Supporting technical information — resource and reserve estimates, product specifications, study detail, agreement mechanics and compliance statements. ASX: IBR • I R O N B E A R R E S O U R C E S L T D PROJECT IRON BEAR | A WORLD CLASS IRON ORE DEVELOPMENT IN CANADA 14

  15. Slide 15: Mineral Resource and Ore Reserve estimates

    Slide 15: Mineral Resource and Ore Reserve estimates

    A2 APPENDIX — RESOURCE & RESERVE ASX: IBR Mineral Resource and Ore Reserve estimates MINERAL RESOURCE ESTIMATE — 12.5% MAGFE CUT-OFF (JORC 2012) rsonal use only CATEGORY TONNES (BT) TOTAL FE% MAG FE% Indicated 4.5 29.46 20.60 Inferred 9.1 30.31 20.73 Total 13.6 30.03 20.68 Resource model cross-secti

  16. Slide 16: High-quality magnetite concentrate specifications

    Slide 16: High-quality magnetite concentrate specifications

    A3 APPENDIX — QUALITY PRODUCT ASX: IBR Metallurgical test work delivered high-quality magnetite concentrates with high Fe yields, low silica and very low deleterious elements including manganese1 rsonal use only MAGNETITE CONCENTRATE SPECIFICATIONS % by weight Fe SiO2 Al2O3 CaO MgO MnO P2O5 Stotal T

  17. Slide 17: Growing Direct Reduction pellet market

    Slide 17: Growing Direct Reduction pellet market

    A4 APPENDIX — GROWING MARKET Iron Bear is positioned to be a major producer in the Direct Reduction pellet market - a high ASX: IBR growth niche of the iron ore market GLOBAL STEEL PRODUCTION BY PROCESS1 IRON ORE CONSUMPTION BY PRODUCT TYPE1 rsonal use only 2024 2035 387 180 266 21% 8% 12% Direct Re

  18. Slide 18: Power study - low-cost Churchill Falls supply

    Slide 18: Power study - low-cost Churchill Falls supply

    A6 APPENDIX — POWER ASX: IBR Power study — low-cost Churchill Falls supply underpins profitability rsonal use only Assessed by Hatch at AACE Class 4 accuracy, covering the mine and 315 kV concentrator at Schefferville and the port and pelletising facilities at Pointe-Noire. New 315 kV transmission f

  19. Slide 19: Large magnetite project in the Labrador Trough with existing infrastructure

    Slide 19: Large magnetite project in the Labrador Trough with existing infrastructure

    Iron Bear is a large magnetite iron ore project in the 1 Labrador Trough with existing infrastructure ASX: IBR TENEMENTS LOCATION • The Iron Bear licenses are in the Labrador Trough, approximately 35 km northwest from the town of Schefferville rsonal use only • The Iron Bear project consists of 14 c

  20. Slide 20: Initial PFS delivered robust financials

    Slide 20: Initial PFS delivered robust financials

    2 The initial PFS delivered robust financials which will be further improved by end of Q4 26 ASX: IBR PFS Scenario Base Case (BC) BC + slurry lines BC + dry tailings Operational Metric Unit Value rsonal use only Life of Mine (LOM) Years 44 Unleveraged USD 9.0 billion USD 9.6 billion USD 8.0 billion

  21. Slide 21: World class JORC compliant mineral resource and probable reserve

    Slide 21: World class JORC compliant mineral resource and probable reserve

    3 Iron Bear has a world class JORC compliant mineral resource of 13.6 billion tonnes @ 30% Fe including a probable reserve of 3.3 Bt @ 29.1% Fe ASX: IBR The maiden 3.3 Bt @ 29.1% Fe probable reserve is based on the maiden mine plan outlined in the PFS and is significant globally in the iron ore indu

  22. Slide 22: Class leading 71% Fe DR concentrate versus peers

    Slide 22: Class leading 71% Fe DR concentrate versus peers

    Iron Bear can produce class leading 71% Fe direct reduction concentrate with silica below 4 1.2% and low deleterious elements ASX: IBR IRON BEAR HIGH - QUALITY DIRECT REDUCTION CONCENTRATE VERSUS PEERS DR CON. Fe SiO2 Al2O3 P2O5 MgO CaO Na2O K2O MnO V2O5 ZrO2 ZnO TiO2 FeO LOI Other Sum rsonal use on

  23. Slide 23: Direct Reduction pellets test results

    Slide 23: Direct Reduction pellets test results

    4 Iron Bear plans to produce Direct Reduction (DR) pellets with world class properties ASX: IBR DIRECT REDUCTION PELLETS TEST RESULTS rsonal use only MEASURE RESULT Fe total 68.4% SiO₂ / Al₂O₃ 1.54% / < 0.1% Phosphorus / sulphur < 0.01% / < 0.01% Compression strength (CCS ISO, avg) 346 daN Metallisa

  24. Slide 24: Compliance statements and important notices

    Slide 24: Compliance statements and important notices

    Compliance statements and important notices ASX: IBR COMPETENT PERSONS IMPORTANT NOTICES rsonal use only Mineral Resources — Michael Andrew FAusIMM, a full-time employee of Snowden This presentation may contain forecasts and forward-looking information. Such Optiro: 2026 Mineral Resource estimate. M

  25. Slide 25: Thank you

    Slide 25: Thank you

    rsonal use only THANK YOU! IRON BEAR RESOURCES LTD ASX: IBR CONTACT: IR@IRONBEAR.ORG WEB:WWW.IRONBEARRESOURCES.COM

Source: ASX announcement, Nov 23, 2026