Alacer Gold — Technical Presentation (September 2014)
76 slides from Alacer Gold's technical presentation, Sep 24, 2014

Slide 1: Çöpler Gold Mine Site Visit Presentation – September 2014
Çöpler Gold Mine Site Visit Presentation – September 2014 Slide 1

Slide 2: Cautionary Statements
Cautionary Statements FORWARD‐LOOKING STATEMENTS Except for statements of historical fact relating to Alacer Gold Corp. (“Alacer”), certain statements contained in this presentation constitute forward‐looking information, future oriented financial information, or financial outlooks (collectively "fo

Slide 3: Welcome
Çöpler Gold Mine Welcome Slide 3

Slide 4: Positioned to Capitalize on Organic Growth
Positioned to Capitalize on Positioned to Capitalize Excellent Organic Growthon Multi‐Mine Strategy Potential Organic Growth Potential Çöpler Gold Mine Attractive Organic Growth Opportunities 1 Additional oxides Low capital cost High margin Significant cash flow Leverage existing infrastruc

Slide 5: Life-of-Mine Production Profile
Life‐of‐Mine Production Profile Çöpler Gold Mine Çöpler Gold Production 2014 ‐ 2034 300 250 Gold Production ('000 oz) 200 150 100 50 0 H2 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Oxide Gold Produced Sulfide Gold Produced Slide 5

Slide 6: High-Value, Near-Term Oxide Opportunities
High‐Value, Near‐Term Oxide Opportunities Çöpler heap leach pad expansion Çöpler Gold Mine Sulfide project DFS mine plan includes 4.2Mt at 1.2 gpt of heap leachable material currently classified as waste Study well progressed to expand existing heap leach pad capacity beyond current 50Mt Initi

Slide 7: World-Class Mine with Significant, Consistent Low-Cost Production and Cash Flow
World‐Class Mine World‐Class Minewith withSignificant, Consistent Significant, Low‐Cost Production and Cash Flow Low‐Cost Production and Cash Flow Çöpler Gold Mine Significant Heap Leach Production (koz Au) (100%) First Quartile Total Cash Costs (C2$/oz)1 $1,500 845 - 870 2013 Global Cash Cost Curve

Slide 8: Life-of-Mine Production Profile
Life‐of‐Mine Production Profile Çöpler Gold Mine July 2014 2018 2023 to Dec 2017 to 2022 to 2034 Total Heap Leach First 5 years Remainder of (100%) Only of POX LOM Mining Oxide Ore to Heap Leach Pad Mt 21.8 1.5 0 23.2 Sulfide Ore Mt 6.31 13.7 8.9 28.9 Waste Mt 85.8 51.4 24.1 161.2 Total Tonnes Mined

Slide 9: Overview
Çöpler Gold Mine Overview Slide 9

Slide 10: Outline of Presentation & Mine Tours
Outline of Presentation & Mine Tours • Location & Ownership Çöpler Gold Mine • People & Administration • Health, Safety & Environment • Community Relations • Pits & Infrastructure • Geology Welcome to Çöpler • Resources and Reserves Gold Mine! • Mining & Processing • Projects • Costs & Outlook • Sul

Slide 11: Company Snapshot
Company Snapshot Çöpler Gold Mine Corporate Overview Corporate / Asset Location Corporate Head Office Denver, Colorado Turkey 80% 50% 20%1 50% Anagold JV Kartaltepe JV Polimetal JV Tunçpınar JV (Lidya Mining) (Lidya Mining) (Lidya Mining) (Lidya Mining) Istanbul Turkey Office Kurttepe Kabadüz Ankara

Slide 12: Çöpler Licenses Held in Two Joint Ventures
Çöpler Licenses Held in Two Joint Ventures Çöpler Gold Mine Slide 12

Slide 13: People
People Çöpler Gold Mine Turkish Business Unit Organizational Structure Slide 13

Slide 14: Human Resources - Employees
Human Resources - Employees Çöpler Gold Mine Skill Levels of Employees in Çöpler Project ‐ as per Recruitment Places as of 31.Aug.2014 Unskilled Semi‐skilled Skilled Total Recruitment Place # % # % # % # % Çöpler 10 9% 27 6% 18 6% 55 6% Sabırlı 11 10% 31 7% 5 2% 47 6% Bağıştaş ‐ Dostal ‐ Bahçe ‐ ‐ 4

Slide 15: Health & Safety Performance
Health & Safety Performance Çöpler Gold Mine Health & Safety Strategy 7 Çöpler Gold Mine LTIs Over 550 Days without LTI & 6 4.05 million hours since last LTI 1. Meeting or exceeding (end of August) legal requirements and international standards 5 2. Creating and maintaining 4 a safe, healthy and LTI

Slide 16: Environmental Performance
Environmental Performance Çöpler Gold Mine Environmental Strategy 7 Çöpler Gold Mine Reportable Environmental Incidents Incidents & Government Reportable 1. Meeting or exceeding legal 6 requirements and Spills contained and remediated international environmental standards 5 2. Maintaining and improv

Slide 17: Community Relations
Community Relations Çöpler Gold Mine • Social policies, procedures and plans implemented in accordance with IFC Guidelines, Company Social Impact Assessment and Relocation Action Plan. • Communication with the local community and the Governmental officials by holding regular visits. • Community Deve

Slide 18: Community Relations
Community Relations Çöpler Gold Mine Mine site tours for locals, Capacity building & social officials, students, etc. programs for women New Primary School Some CR activity statistics to date: • 1,444 consultation meetings held • 224 grievances conveyed by the community have been resolved • 498 comm

Slide 19: Community Relations
Community Relations Çöpler Gold Mine • Expansion Project announcements were made to the Governor, Sub-governor, Mayor, village mukhtars, contractors, & employees. • Public Hearing, an important part of the EIA process, has been successfully completed. Slide 19

Slide 20: Çöpler Oxide Pits & Infrastructure – 2014
Çöpler Oxide Pits & Infrastructure – 2014 Çöpler Gold Mine Slide 20

Slide 21: Overview of Çöpler Mine
Overview of Çöpler Mine Çöpler Gold Mine SE Waste Dump Marble Pit Main Manganese Pit Pit Crusher & Clay‐Handling SART ADR Leach Pad Agglomeration Ponds & Conveying Slide 21

Slide 22: Geology
Çöpler Gold Mine Geology Slide 22

Slide 23: Exceptional Exploration Potential
Exceptional Exploration Potential Çöpler Gold Mine 18 years in Turkey gives Alacer early mover advantage Tethyan Belt is historically under‐explored and has excellent mineral potential Slide 23

Slide 24: Çöpler Geology – Regional Setting
Çöpler Geology – Regional Setting Çöpler Gold Mine Çöpler Located in Tethyan Metallogenic Belt Slide 24

Slide 25: Çöpler District Geology & Licenses
Çöpler District Geology & Licenses Çöpler Gold Mine Mining License (942 hectares) 15 km is surrounded by Exploration Licenses 25 km Slide 25

Slide 26: Çöpler Geology – Key Rock Types
Çöpler Geology – Key Rock Types Çöpler Gold Mine Limestone Old workings Marble on contacts Metasediments Intrusive Looking west across Çöpler deposit Slide 26

Slide 27: Çöpler Geology – Plan of Deposit
Çöpler Geology – Plan of Deposit Çöpler Gold Mine Slide 27 3 km long ore zone

Slide 28: Çöpler Geology – Mineralization Styles
Çöpler Geology – Mineralization Styles Çöpler Gold Mine Çöpler is an intermediate sulfidation epithermal deposit Sulfide mineralization exhibits three principal styles: • Disseminated sulfides in stock work quartz‐veined metasediments and diorite (Main Zone, Marble Zone) • Disseminated sulfides in c

Slide 29: Çöpler District – Priorities for 2014
Çöpler District – Priorities for 2014 Çöpler Gold Mine Identify supplementary oxide ore within trucking distance of Çöpler infrastructure Discover standalone projects in the extensive mineralized system Continue target generation and prioritization $11.1M 2014 Budget (100%) Slide 29

Slide 30: Çöpler District – 2013 Target Generation
Çöpler District – 2013 Target Generation Çöpler Gold Mine Slide 30

Slide 31: Strong Targets Identified in Highly Prospective Çöpler District
Strong Targets Identified in Highly Prospective Çöpler District Çöpler Gold Mine Anagold Yakuplu (80%) 17m at 1.7g/t Au from 55m 6m at 4.7g/t Au from 55m 14m at 1.6g/t Au from 1m 17m at 2.7g/t Au from 73m Dursunbey Yakuplu (50%) 7m at 4.6g/t Au from surface 10m at 1.0g/t Au from 6m 14m

Slide 32: Mineral Resources and Reserves
Çöpler Gold Mine Mineral Resources and Reserves Slide 32

Slide 33: Çöpler Resource Continues to Grow
Çöpler Resource Continues to Grow Çöpler Gold Mine Çöpler Resource + Mined Ounces (100%) 14 12 10 Million ounces of gold 8 Inferred 6 Measured + Indicated Contained Ounces Mined 4 2 ‐ Feb 10 Dec 11 June 12 June 13 Dec 13 Slide 33

Slide 34: Ongoing Resource Reconciliation Study
Ongoing Resource Reconciliation Study Çöpler Gold Mine • Resource reconciliation work has significantly upgraded the quality of the reserve • Changed modelling method from Ordinary Kriging to Probability Assigned Constrained Kriging (PACK), utilized because it allows better calibration of the resour

Slide 35: Block Model Comparison
Block Model Comparison Manganese Pit – Section 4,364,360N Çöpler Gold Mine 2013 Pit 2010 Resource Model • Ordinary Kriging & no historical comparisons 2010 2013 Pit 2013 Resource Model • Previous modelling by geology restricted ore definitions 2013 Block Color 2013 Pit 2014 Resource Model Legend • P

Slide 36: Manganese Pit Geology
Manganese Pit Geology Çöpler Gold Mine Manganese Pit “Ring of Fire” Diorite intrusion contact zone (white ring around intrusion) Poor drilling recoveries along contact High-grade ore mined along contact Slide 36

Slide 37: Resource Domains
Resource Domains Çöpler Gold Mine Source: Figure 14-3 of Çöpler NI 43-101 Technical Report dated July 29, 2014. Slide 37

Slide 38: Summary of the Two Pass PACK Method
Summary of the Two Pass PACK Method Çöpler Gold Mine Source: Figure 14-12 of Çöpler NI 43-101 Technical Report dated July 29, 2014. Slide 38

Slide 39: Resource Classification
Resource Classification Çöpler Gold Mine Plan of Resource Classification Showing Indicated (Green) with Inferred (Blue) Material Forming a Ring around the Indicated Material Source: Figure 14-16 of Çöpler NI 43-101 Technical Report dated July 29, 2014. Slide 39

Slide 40: Whittle Pit Optimizations
Whittle Pit Optimizations Çöpler Gold Mine Source: Figure 16-2 of Çöpler NI 43-101 Technical Report dated July 29, 2014. Slide 40

Slide 41: Çöpler Mineral Resource
Çöpler Mineral Resource Çöpler Gold Mine Updated Mineral Resources for the Ҫӧpler Deposit (As of December 31, 2013) Material Resource Category Tonnes Contained Au Gold Cut‐off Grade (g/t) Au (g/t) Ag (g/t) Cu (%) Type Material (x1000) (oz x 1000) Measured ‐ ‐ ‐ ‐ ‐ Indicated 69,512 1.08 2.78 0.15 2,

Slide 42: Çöpler Mineral Reserve
Çöpler Mineral Reserve Çöpler Gold Mine Updated Mineral Reserves for the Ҫӧpler Deposit (As of December 31, 2013) Tonnes Au Ag Cu Contained Au Recoverable Au Reserve Category Material (x1000) (g/t) (g/t) (%) Ounces Ounces Proven ‐ Oxide In‐Situ ‐ ‐ ‐ ‐ ‐ ‐ Probable ‐ Oxide In‐Situ 26,207 1.32 2.88 0

Slide 43: Reserve Comparison
Reserve Comparison Çöpler Gold Mine Ҫӧpler ‐ Mineral Reserve Comparison (100% Basis) Previous Reserve New (updated) Reserve Change (as at December 31, 2013) (as at December 31, 2013) Tonnes Contained Au Tonnes Contained Au Tonnes Contained Au Reserve Category Material Au (g/t) Au (g/t) Au (%) (x1000

Slide 44: Mining
Çöpler Gold Mine Mining Slide 44

Slide 45: Mining - Overview
Mining ‐ Overview Çöpler Gold Mine • Mine plans and designs are prepared by Anagold Engineering. • Staged open‐pit development • 4 oxide pits within large sulfide pit • Drilling & blasting and loading & hauling is by a contractor. • Bench height = 5m • Blast hole pattern = 3.50m x 3.50m • Blast hole

Slide 46: Mining – Contractor Mining Fleet
Mining – Contractor Mining Fleet Çöpler Gold Mine Mining Contractor ‐ Çiftay İnşaat Taahhüt Tic AŞ • 72 Mercedes Haul Trucks (38 tonne capacity) • 2 Volvo Articulated Haul Truck (35 tonne capacity) • 11 CAT Excavators (5m³) • 1 CAT Excavator (3.5m³) • 1 CAT Excavator (2.5m³) • 2 CAT Excavators (2.25

Slide 47: Mining – Pit Design Parameters
Mining – Pit Design Parameters Çöpler Gold Mine Source: Table 16-11 of Çöpler NI 43-101 Technical Report dated July 29, 2014. Slide 47

Slide 48: Mining – Production to Q2 2014
Mining – Production to Q2 2014 Çöpler Gold Mine Mined Material Units 2011 2012 2013 2014 Q1 2014 Q2 TOTAL Oxide Ore Tonnes t 7,482,545 7,077,728 6,673,520 1,418,391 1,558,392 24,210,575 Gold Grade g/t 1.55 1.65 1.90 1.50 1.43 1.66 Cont.Ozs. oz 371,729 374,430 407,361 68,336 71,656 1,293,512 Sulfide

Slide 49: Processing
Çöpler Gold Mine Processing Slide 49

Slide 50: Processing - Overview
Processing ‐ Overview Çöpler Gold Mine Nominal plant throughput = 6.2Mtpa or 17,000tpd: • Primary gyratory & secondary/tertiary cone crushing circuit for rock ore supply. • Sizer circuit for clay ore supply. • Approximately equal split of clay to rock ore supply (nominal crush size to minus 12mm/25m

Slide 51: Processing – Flow Sheet
Processing – Flow Sheet Çöpler Gold Mine Slide 51

Slide 52: Processing – Production Performance
Processing – Production Performance Çöpler Gold Mine 2011 2012 2013 2014 Q (average) Q (average) Q (average) Q1 Q2 Stacked Ore ton 471,527 1,074,257 1,447,149 1,384,123 1,524,013 Grade g/t 2.50 1.97 2.08 1.48 1.46 ROM ton 1,350,520 694,690 227,052 ‐ ‐ Grade g/t 1.16 0.94 0.81 ‐ ‐ Total Ore to HL ton

Slide 53: Processing – Initiatives and Projects
Processing – Initiatives and Projects Çöpler Gold Mine Recently completed: • Clay Handling Circuit – commissioned and operating Q4 2013 • New agglomerator – commissioned Q2 2014 • Grasshopper conveyor upgrade phase 1 • HLP barren solution flow rate increased up to 1,200m3/hr Current improvement proj

Slide 54: Projects
Çöpler Gold Mine Projects Slide 54

Slide 55: Substantial Capital Invested to Optimize Operations Over Past Three Years
Substantial Capital Invested to Optimize Operations Over Past Three Years Çöpler Gold Mine Over $60 million invested in optimization and process improvement projects Clay‐Handling Circuit $13M spent HL Pad Phase 3 Expansion $7M spent Designed to improve processing of ore Increased total leac

Slide 56: SART Plant
SART Plant Çöpler Gold Mine SART Plant ‐ Process Design Criteria Design Throughput 380 m3/hour (PLS or BLS) Plant Availability 92% Feed Solution Copper 383 mg/L (average) Copper Recovery 93.7% (average) Discharge Solution Copper 24 mg/L (average) Copper Production 3.3 tpd Cu (average) Precipitate Pr

Slide 57: New CIC Circuit – Overview and Design Criteria
New CIC Circuit – Overview and Design Criteria Çöpler Gold Mine New CIC Circuit Design Criteria Designed Capacity 582m³/hour Maximum Capacity 600m³/hour Capacity Increase with Introduction of New CIC Circuit 400m³/hour Total CIC Capacity After Upgrade 1000 m³/hour Slide 57

Slide 58: Costs and Outlook
Çöpler Gold Mine Costs and Outlook Slide 58

Slide 59: Summary – Operating Costs
Summary – Operating Costs Çöpler Gold Mine 2011 2012 2013 Q1 2014 Q2 2014 Operating Statistics ‐ 100%: Waste tonnes mined 11,371,206 18,071,316 20,683,286 5,471,484 6,365,596 Oxide ore mined ‐ tonnes 7,443,854 7,036,221 6,673,520 1,418,391 1,558,392 Oxide ore mined ‐ grade (g/t) 1.54 1.61 1.90 1.50

Slide 60: 2014 Guidance
2014 Guidance Çöpler Gold Mine Çöpler Mine 2014 Guidance Waste tonnes mined (100%) (millions) 25 Oxide ore tonnes treated (millions) 6.2 Oxide ore grade (g/t gold) 1.6 Heap-leach gold ounces produced (100%) (‘000’s) 200,000 to 225,000 Heap-leach gold ounces produced (attributable1) (‘000’s) 160,000

Slide 61: Sulfide Project
Çöpler Gold Mine Sulfide Project Slide 61

Slide 62: Sulfide Project Demonstrates Robust Economics
Sulfide Project Demonstrates Robust Economics Çöpler Gold Mine LOM Key Assumptions1 (100%) Free Cash Flow1 (millions) (100%) Oxide ‐ HL Sulfide ‐ POX Total Ore Mined Kt 23,249 28,868 LOM $1.6B Au Grade g/t 1.31 2.67 Free Au Recovery % 69.2% 93.9% Cash Flow LOM Modelled Mine Life years 6 18 $227 $227

Slide 63: Sulfide Project Development
Sulfide Project Sulfide Development Project Timeline Development Timeline Çöpler Gold Mine Project Schedule Build Project Team: July 2014 to March 2015 Project Director position filled 2014 2015 2016 2017 2018 Recruit Owner’s Construction Team Project Operations Manager position filled Çöpler

Slide 64: Overview of Sulfide Processing Facility
Overview of Sulfide Processing Facility Proven technology Çöpler Gold Mine • Proven technology used for 38% of global gold production • Autoclave circuit comprised of seven individual pressure vessels • Temperature of 220o C (430o F), Pressure of 2,900 kPag (420 psi) • Sulfur grade averages 4.2%, pr

Slide 65: Çöpler Sulfide Process Schematic
Çöpler Sulfide Process Schematic Çöpler Gold Mine Source: Figure17-11 of Çöpler NI 43-101 Technical Report dated July 29, 2014 Slide 65

Slide 66: Sulfide Project Site Layout
Sulfide Project Site Layout Çöpler Gold Mine Designed with room for a staged approach EXISTING AGGLOMERATOR EXISTING CRUSHING Slide 66

Slide 67: Sulfide Project Capital Cost & Risk Management
Sulfide Project Capital Cost & Risk Management Çöpler Gold Mine Capital Cost Summary1 (millions) • Project Management Crushing and Grinding Equipment $70 – Recruitment of the owner’s team Autoclaves and Ancillary Equipment $170 – Leverage local knowledge and experience Metal Recovery (incl. ADR) $74

Slide 68: Sulfide Project Capital Schedules
Sulfide Project Capital Schedules Çöpler Gold Mine Pre‐Production Capital Expenditure $ Millions Total 2014 2015 2016 2017 2018 Plant 571.1 15.1 82.2 236.7 203.5 33.7 Tailing Facility 49.3 0.0 10.4 25.9 13.0 0.0 Social and Permitting 12.3 0.8 1.2 4.5 5.7 0.0 Total Pre‐Production Capital 632.8 15.9 9

Slide 69: Sulfide Project to Deliver Significant Growth
Sulfide Project to Deliver Significant Growth Çöpler Gold Mine Average annual gold production of >150 koz at Total Cash Costs1 of $540/oz Tonnes Processed and Grade (100%) Production and Total Cash Costs1 (C2) (100%) H2 6.4 6.4 H2 2014 5.7 2014 1.8 1.4 1.2 1.3 1.7 1.3 1.0 3.3 3.9 269 257 $540 0.9 0.

Slide 70: Sulfide Ore Mined by Year
Sulfide Ore Mined by Year Çöpler Gold Mine Sulfide Ore Total 20141 20151 20161 20171 2018 2019 2020 2021 2022 2023 2024 2025 2026 Low‐Grade (1.4‐2.3 g/t) Mined (Mt) 15.7 0.9 0.9 1.0 0.8 1.3 2.4 1.6 0.8 0.6 1.6 1.4 2.4 0.0* Low‐Grade Gold Grade (g/t) 1.86 1.82 1.85 1.88 1.84 1.85 1.89 1.88 1.88 1.87

Slide 71: Sulfide Ore Processed by Year
Sulfide Ore Processed by Year Çöpler Gold Mine Total ‘17 ‘18 ‘19 ‘20 ‘21 ‘22 ‘23 ‘24 ‘25 ‘26 ‘27 ‘28 ‘29 ‘30 ‘31 ‘32 ‘33 ‘34 Sulfide Ore Processed (Mt) 31.7 0.0* 1.5 1.8 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.6 Sulfide Au Grade Processed (g/t) 2.7 5.2 4.9 4.2 4.2 3.5 3.0 3.0 2.7 3

Slide 72: Sulfide Project Operating Costs
Sulfide Project Operating Costs Çöpler Gold Mine LOM Cash Operating Costs1 Summary Unit Cost Mining Per tonne mined $1.85 Rehandle Per tonne rehandled $1.16 Heap Leach Processing Per tonne heap leach $9.79 processed POX Processing Per tonne POX processed $34.55 Site Support and Offsite Per tonne pro

Slide 73: Sulfide Project Operating Costs
Sulfide Project Operating Costs Çöpler Gold Mine LOM Cash Costs Summary POX Processing Costs by Component LOM Electric Power Fuel Oil Mobile Equipment ($/t ore $109/oz $15/oz Fuel ($/oz) processed) 26% 3% $7/oz 2% Mining Contract / Support $7.18 $121.85 Labour $53/oz Rehandle 12% G&A Supplies $14/oz

Slide 74: Base Case Financial Metrics – An Incremental Analysis
Base Case Financial Metrics – An Incremental Analysis Çöpler Gold Mine Financial Metrics Base Case DFS Case (as of July 1, 2014) (Oxide (Heap Leach + Incremental Only) POX) B–A A B LOM cash flow (millions) $323 $1,600 $1,250 NPV at 5% (millions) $299 $921 $622 IRR % N/A N/A 20.5 Payback from start o

Slide 75: Reduced Execution Risk
Reduced Execution Risk Çöpler Gold Mine Brownfield project with well understood orebody: Mined Çöpler orebody for over 3 years Stockpiled >2.3 Mt of sulfide ore at 4.62g/t Existing infrastructure Exhaustive studies and reviews completed: Extensive metallurgical peer reviews 4 pilot plant t

Slide 76: Thank you for your interest
Çöpler Gold Mine September 2014 Thank you for your interest Slide 76
Source: Internet Archive copy of alacergold.com
More decks from Alacer Gold Corp
Investor Presentation (August 2018)15 slides · August 2018
Q2 2018 Earnings Presentation12 slides · Jul 31, 2018
RBC Global Mining & Materials Conference 201817 slides · June 2018
Corporate Update (May 2017)75 slides · May 10, 2017
Q1 2017 Earnings Presentation13 slides · May 2, 2017
FY2016 Earnings Presentation14 slides · Feb 6, 2017