Alacer Gold — FY2016 Earnings Presentation
14 slides from Alacer Gold's earnings presentation, Feb 6, 2017

Slide 1: Full-Year 2016 Operating & Financial Results
Full-Year 2016 Operating & Financial Results Rod Antal, President & Chief Executive Officer Mark Murchison, Chief Financial Officer February 6, 2017 TSX: ASR / ASX: AQG / 1

Slide 2: Cautionary Statements
Cautionary Statements Except for statements of historical fact relating to Alacer, certain statements contained in this presentation constitute forward-looking information, future oriented financial information, or financial outlooks (collectively “forward-looking information”) within the meaning of

Slide 3: Stronger 2017 Production
Stronger 2017 Production1 Production Increasing2, 3 Total Cash Costs4 Decreasing AISC4 Decreasing +43% 170 $966 -25% -29% $738 US$/Ounce $725 Ounces (000s) 119 US$/Ounce $525 2016A 2017E 2016A 2017E 2016A 2017E Sustaining capital expenditure $12 million 2017 production is weighted Sulfide capital ex

Slide 4: Çöpler Sulfide Expansion Project on Track
Çöpler Sulfide Expansion Project on Track Warehouse POX Building Oxygen Plant Maintenance Workshop Reagent Storage Leach and CIP Tanks Decant Thickener Grinding Area POX Feed Thickener Iron Arsenic Precipitation Acidulation Area TSX: ASR / ASX: AQG / 4

Slide 5: Çöpler Sulfide Expansion Project On Budget
Çöpler Sulfide Expansion Project On Budget Autoclave at Samsun Port in Turkey Grinding Circuit Grinding Thickening Ball Mill SAG Mill All major equipment purchase orders complete Design engineering is 90% complete of which process engineering is 97% complete Project remains on budget and on tr

Slide 6: Çöpler Sulfide Project Fully Funded
Çöpler Sulfide Project Fully Funded1 Cash and Cash Equivalents2 $215 million Over $100 million FCF Liquidity Position through September 2018 $565 Million Includes 142,000 ounces hedged at an average $1,282 gold price Undrawn Credit Facility3 $350 million Remaining Sulfide Project Capital of $586 mil

Slide 7: Çöpler District Initial Mineral Resource Confirms Oxides
Çöpler District Initial Mineral Resource Confirms Oxides Çakmaktepe Central Çakmaktepe North Initial Measured & Indicated Mineral Resource of 140,000 contained ounces1 Mineral Resource remains open Mineral Resource does not include Çakmaktepe Central drilling Targeting 2018 oxide production

Slide 8: Çakmaktepe Central Provides Resource Growth Potential
Çakmaktepe Central Provides Resource Growth Potential Çakmaktepe Central discovered late 2016; not included in initial Mineral Resource1 Encountered high-grade oxide gold at surface Work to date identified mineralization from 5m to over 20m thick over a 400m strike length Remains open in all

Slide 9: Gediktepe Progressing into Detailed Study Phase
Gediktepe Progressing into Detailed Study Phase PFS defined Project as technically and economically viable After tax NPV at 5% of $475M and IRR of 47%1 Alacer owns 50% with JV Partner Lidya Mining Life-of-mine payable metals of 400,000 ozs of gold, 8M ozs of silver, 315M lbs of copper and 78

Slide 10: 2016 Highlights
2016 Highlights Strategic Operational Financial Sulfide Project advancing Produced 119,036 gold ozs Cash of $215M on time and on budget Total Cash Costs1 of Operating cash flows of Initial Mineral Resource $738/oz and AISC1 of $37M for Çöpler District $966/oz Attributable net profit2 o

Slide 11: P&L Statement – Earnings of $16 Million
P&L Statement – Earnings of $16 Million Q4 2016 Q3 2016 Q2 2016 Q1 2016 YTD 2016 Commentary ($M) ($M) ($M) ($M) ($M) Total gold sold (ounces) 32,263 21,155 30,263 31,750 115,431 Avg realized gold price ($/ounce) 1,191 1,324 1,252 1,187 1,230 Gold sales 38.4 28.0 37.9 37.7 142.0 Production costs 23.5

Slide 12: Cost Metrics
Cost Metrics Q4 2016 Q3 2016 Q2 2016 Q1 2016 YTD 2016 Commentary 1 Production costs (Total Cash Costs (C2)) ($M) 23.5 18.0 22.8 20.9 85.2 Add: Exploration and evaluation ($M) 0.3 0.5 0.7 0.5 2.0 Includes G&A and share-based Other ($M) 4.5 5.4 4.4 4.2 18.4 compensation Sustaining capital expenditure

Slide 13: Advancing Our Strategy
Advancing Our Strategy Çöpler oxide production has provided foundation for growth Sulfide Project construction advancing rapidly Initial Mineral Resource for Çöpler District confirms satellite oxides Gediktepe is progressing into detailed study phase TSX: ASR / ASX: AQG / 13

Slide 14: Contact
Contact For further information, please contact: Lisa Maestas Director, Investor Relations +1-303-292-1299 TSX: ASR / ASX: AQG / 14
Source: Internet Archive copy of alacergold.com
More decks from Alacer Gold Corp
Investor Presentation (August 2018)15 slides · August 2018
Q2 2018 Earnings Presentation12 slides · Jul 31, 2018
RBC Global Mining & Materials Conference 201817 slides · June 2018
Corporate Update (May 2017)75 slides · May 10, 2017
Q1 2017 Earnings Presentation13 slides · May 2, 2017
Investor Presentation (January 2017)24 slides · January 2017