Alacer Gold Corp

Alacer Gold — FY2016 Earnings Presentation

14 slides from Alacer Gold's earnings presentation, Feb 6, 2017

  1. Slide 1: Full-Year 2016 Operating & Financial Results

    Slide 1: Full-Year 2016 Operating & Financial Results

    Full-Year 2016 Operating & Financial Results Rod Antal, President & Chief Executive Officer Mark Murchison, Chief Financial Officer February 6, 2017 TSX: ASR / ASX: AQG / 1

  2. Slide 2: Cautionary Statements

    Slide 2: Cautionary Statements

    Cautionary Statements Except for statements of historical fact relating to Alacer, certain statements contained in this presentation constitute forward-looking information, future oriented financial information, or financial outlooks (collectively “forward-looking information”) within the meaning of

  3. Slide 3: Stronger 2017 Production

    Slide 3: Stronger 2017 Production

    Stronger 2017 Production1 Production Increasing2, 3 Total Cash Costs4 Decreasing AISC4 Decreasing +43% 170 $966 -25% -29% $738 US$/Ounce $725 Ounces (000s) 119 US$/Ounce $525 2016A 2017E 2016A 2017E 2016A 2017E Sustaining capital expenditure $12 million 2017 production is weighted Sulfide capital ex

  4. Slide 4: Çöpler Sulfide Expansion Project on Track

    Slide 4: Çöpler Sulfide Expansion Project on Track

    Çöpler Sulfide Expansion Project on Track Warehouse POX Building Oxygen Plant Maintenance Workshop Reagent Storage Leach and CIP Tanks Decant Thickener Grinding Area POX Feed Thickener Iron Arsenic Precipitation Acidulation Area TSX: ASR / ASX: AQG / 4

  5. Slide 5: Çöpler Sulfide Expansion Project On Budget

    Slide 5: Çöpler Sulfide Expansion Project On Budget

    Çöpler Sulfide Expansion Project On Budget Autoclave at Samsun Port in Turkey Grinding Circuit Grinding Thickening Ball Mill SAG Mill  All major equipment purchase orders complete  Design engineering is 90% complete of which process engineering is 97% complete  Project remains on budget and on tr

  6. Slide 6: Çöpler Sulfide Project Fully Funded

    Slide 6: Çöpler Sulfide Project Fully Funded

    Çöpler Sulfide Project Fully Funded1 Cash and Cash Equivalents2 $215 million Over $100 million FCF Liquidity Position through September 2018 $565 Million Includes 142,000 ounces hedged at an average $1,282 gold price Undrawn Credit Facility3 $350 million Remaining Sulfide Project Capital of $586 mil

  7. Slide 7: Çöpler District Initial Mineral Resource Confirms Oxides

    Slide 7: Çöpler District Initial Mineral Resource Confirms Oxides

    Çöpler District Initial Mineral Resource Confirms Oxides Çakmaktepe Central Çakmaktepe North  Initial Measured & Indicated Mineral Resource of 140,000 contained ounces1  Mineral Resource remains open  Mineral Resource does not include Çakmaktepe Central drilling  Targeting 2018 oxide production

  8. Slide 8: Çakmaktepe Central Provides Resource Growth Potential

    Slide 8: Çakmaktepe Central Provides Resource Growth Potential

    Çakmaktepe Central Provides Resource Growth Potential  Çakmaktepe Central discovered late 2016; not included in initial Mineral Resource1  Encountered high-grade oxide gold at surface  Work to date identified mineralization from 5m to over 20m thick over a 400m strike length  Remains open in all

  9. Slide 9: Gediktepe Progressing into Detailed Study Phase

    Slide 9: Gediktepe Progressing into Detailed Study Phase

    Gediktepe Progressing into Detailed Study Phase  PFS defined Project as technically and economically viable  After tax NPV at 5% of $475M and IRR of 47%1  Alacer owns 50% with JV Partner Lidya Mining  Life-of-mine payable metals of 400,000 ozs of gold, 8M ozs of silver, 315M lbs of copper and 78

  10. Slide 10: 2016 Highlights

    Slide 10: 2016 Highlights

    2016 Highlights Strategic Operational Financial  Sulfide Project advancing  Produced 119,036 gold ozs  Cash of $215M on time and on budget  Total Cash Costs1 of  Operating cash flows of  Initial Mineral Resource $738/oz and AISC1 of $37M for Çöpler District $966/oz  Attributable net profit2 o

  11. Slide 11: P&L Statement – Earnings of $16 Million

    Slide 11: P&L Statement – Earnings of $16 Million

    P&L Statement – Earnings of $16 Million Q4 2016 Q3 2016 Q2 2016 Q1 2016 YTD 2016 Commentary ($M) ($M) ($M) ($M) ($M) Total gold sold (ounces) 32,263 21,155 30,263 31,750 115,431 Avg realized gold price ($/ounce) 1,191 1,324 1,252 1,187 1,230 Gold sales 38.4 28.0 37.9 37.7 142.0 Production costs 23.5

  12. Slide 12: Cost Metrics

    Slide 12: Cost Metrics

    Cost Metrics Q4 2016 Q3 2016 Q2 2016 Q1 2016 YTD 2016 Commentary 1 Production costs (Total Cash Costs (C2)) ($M) 23.5 18.0 22.8 20.9 85.2 Add: Exploration and evaluation ($M) 0.3 0.5 0.7 0.5 2.0 Includes G&A and share-based Other ($M) 4.5 5.4 4.4 4.2 18.4 compensation Sustaining capital expenditure

  13. Slide 13: Advancing Our Strategy

    Slide 13: Advancing Our Strategy

    Advancing Our Strategy  Çöpler oxide production has provided foundation for growth  Sulfide Project construction advancing rapidly  Initial Mineral Resource for Çöpler District confirms satellite oxides  Gediktepe is progressing into detailed study phase TSX: ASR / ASX: AQG / 13

  14. Slide 14: Contact

    Slide 14: Contact

    Contact For further information, please contact: Lisa Maestas Director, Investor Relations +1-303-292-1299 TSX: ASR / ASX: AQG / 14

Source: Internet Archive copy of alacergold.com