Alacer Gold Corp

Alacer Gold — RBC Global Mining & Materials Conference 2018

17 slides from Alacer Gold's conference presentation, June 2018

  1. Slide 1: 2018 – A Transformational Year

    Slide 1: 2018 – A Transformational Year

    2018 – A Transformational Year RBC Global Mining & Materials Conference June 2018 TSX: ASR / ASX: AQG / 1

  2. Slide 2: Cautionary Statements

    Slide 2: Cautionary Statements

    Cautionary Statements Certain statements contained in this document constitute “forward-looking information”, “future oriented financial information” or “financial outlooks” (collectively, “forward looking information”) within the meaning of applicable securities laws. Forward-looking information of

  3. Slide 3: Delivering Value Through Organic Growth

    Slide 3: Delivering Value Through Organic Growth

    Delivering Value Through Organic Growth Delivering Adding Oxide Advancing Realizing Growth Çöpler Sulfide Production with Gediktepe through Expansion Project New Ore Source. Definitive Exploration. Under Budget & On Çakmaktepe Feasibility Study to Success with new Time in Q3 2018 Mining Starts Decis

  4. Slide 4: Company Snapshot

    Slide 4: Company Snapshot

    Company Snapshot Asset Locations Balance Sheet Supports Growth Balance Sheet1 Cash US$237M Debt US$350M Working Capital US$266M Capital Structure Shares on Issue 294M Fully Diluted 297M Avg Daily Trading Volume 730K shares Market Capitalization Recent Share Price2 C$2.44 Market Cap ~C$720M 1 As of M

  5. Slide 5: Sulfide Project ~85% Complete

    Slide 5: Sulfide Project ~85% Complete

    Sulfide Project ~85% Complete 2016 Now TSX: ASR / ASX: AQG / 5

  6. Slide 6: Çöpler Sulfide Project On Schedule

    Slide 6: Çöpler Sulfide Project On Schedule

    Çöpler Sulfide Project On Schedule 2017 Milestones Equipment Procurement Complete Autoclaves Arrived On-Site Complete Autoclave Assembly Complete Engineering Design Complete Autoclave Certification Complete CIP Area – Top of Tanks Major Plant Civil Works Complete Oxygen Plant Construction Complete E

  7. Slide 7: Çöpler Sulfide Project Under Budget

    Slide 7: Çöpler Sulfide Project Under Budget

    Çöpler Sulfide Project Under Budget Capital Expenditure Progress Robust Liquidity Position Remaining Capex $140M Reduced Capex Cash $692 Million $237 Million Capex Incurred1 $552M $744M ($52M) $692M $17M of potential additional savings ($552M) $140M $237M + $17M = $254M → Project Fully Funded A B Re

  8. Slide 8: Çakmaktepe Adds to Production Profile

    Slide 8: Çakmaktepe Adds to Production Profile

    Çakmaktepe Adds to Production Profile Leveraging Existing Infrastructure Çakmaktepe Access Road Under Construction N Çöpler oxide Çöpler sulfide N infrastructure infrastructure Çakmaktepe Access Road Çakmaktepe maiden Mineral Reserve of 176,000 contained gold ounces in oxide ore and a 70% increase t

  9. Slide 9: Growth Through Exploration - Ardich New Discovery

    Slide 9: Growth Through Exploration - Ardich New Discovery

    Growth Through Exploration - Ardich New Discovery Exciting drilling results at Ardich continue: ▪ Hole AR09 - 67.7m at 4.08 g/t gold ▪ Hole AR04 - 90.8m at 1.79 g/t gold Potential new ore source that would be accretive to current production profile Current drilling program testing extent of minerali

  10. Slide 10: Gediktepe Project Update

    Slide 10: Gediktepe Project Update

    Gediktepe Project Update Alacer owns 50% with JV Partner Lidya Mining PFS defined project as technically and economically viable1 DFS work identified additional requirements for metallurgy, resource modelling and site layout Definitive Feasibility Study Targeted to be Completed later in 2018 1 The m

  11. Slide 11: Foundation to Execute on Organic Multi-Mine Strategy

    Slide 11: Foundation to Execute on Organic Multi-Mine Strategy

    Foundation to Execute on Organic Multi-Mine Strategy Disciplined Financial & Çöpler’s Asset Quality Organic Growth From Risk Management Provides Foundation for Free Pipeline Diversifies Cash Cash Flow & Value Creation Flow Sources ▪ Sulfide Project1 Fully Funded with $237M of ▪ Çöpler Sulfide Projec

  12. Slide 12: Appendix

    Slide 12: Appendix

    Appendix TSX: ASR / ASX: AQG / 12

  13. Slide 13: 2018 – A Transformational Year: 2018 Guidance

    Slide 13: 2018 – A Transformational Year: 2018 Guidance

    2018 – A Transformational Year 2018 Guidance (100%1) Heap-leach gold ounces produced (includes Çakmaktepe2) (‘000’s) 70 to 90 Sulfide plant gold ounces produced (‘000’s) 50 to 100 Oxide ore tonnes treated (includes Çakmaktepe) (M) 2.3 Oxide ore grade (includes Çakmaktepe) (g/t gold) 1.2 Sulfide ore

  14. Slide 14: Q1 2018 Highlights

    Slide 14: Q1 2018 Highlights

    Q1 2018 Highlights Strategic Operational Financial Sulfide Project1 Safety Liquidity ▪ ~85% complete and ▪ 491 days, or 10.8M man-hours, ▪ Cash of $237M5 commissioning progressing worked without a lost-time injury ▪ Operating cash flows of $30M ▪ On schedule for start-up Q3’18 Production Attributabl

  15. Slide 15: Q1 2018 Operating Highlights

    Slide 15: Q1 2018 Operating Highlights

    Q1 2018 Operating Highlights Gold Ounces Produced AISC Operating Cash Flows 70 $1,000 $60 60 $800 50 $40 $600 ‘000’s ozs 40 $/ounce $M 30 $400 $737 $20 20 38 $30 $200 10 0 $0 $0 Q2 17 Q3 17 Q4 17 Q1 18 Q2 17 Q3 17 Q4 17 Q1 18 Q2 17 Q3 17 Q4 17 Q1 18 Tracking to full year oxide production (70,000 to

  16. Slide 16: Q1 2018 Financial Highlights

    Slide 16: Q1 2018 Financial Highlights

    Q1 2018 Financial Highlights Attributable Net Profit Three Months ended $30 On 100% basis March 31 $25 2017 2018 $20 Total gold ounces produced 32,918 37,875 $15 Total gold ounces sold 34,804 42,131 $27 $10 Avg realized price, incl hedge $1,259 $1,294 $5 Gold Sales ($M), incl hedge 44 55 $0 Operatin

  17. Slide 17: Çöpler Geology – Plan of Deposit

    Slide 17: Çöpler Geology – Plan of Deposit

    Çöpler Geology – Plan of Deposit TSX: ASR / ASX: AQG / 17

Source: Internet Archive copy of alacergold.com

More decks from Alacer Gold Corp