Alacer Gold — Q1 2017 Earnings Presentation
13 slides from Alacer Gold's earnings presentation, May 2, 2017

Slide 1: First Quarter 2017 Operating & Financial Results
First Quarter 2017 Operating & Financial Results Rod Antal, President & Chief Executive Officer Mark Murchison, Chief Financial Officer May 2, 2017 TSX: ASR / ASX: AQG / 1

Slide 2: Cautionary Statements
Cautionary Statements Certain statements contained in this document constitute “forward-looking information”, “future oriented financial information” or “financial outlooks” (collectively, “forward looking information”) within the meaning of applicable securities laws. Forward-looking information of

Slide 3: 2017 Highlights
2017 Highlights Strategic Operational Financial Sulfide Project advancing Produced 32,918 gold ozs Cash of $284M, including on time, on budget and is initial draw on finance Total Cash Costs1 of $711/oz fully funded facility2 and AISC1 of $898/oz Drilling recommenced at Operating cash fl

Slide 4: Sulfide Project Construction Site
Sulfide Project Construction Site Laydown Area Warehouse Maintenance Workshop Pipe Rack Reagent Storage Oxygen Plant Haul Road POX Building Grinding Thickening Leach and CIP Tanks Ball Mill HV Switchyard Acidulation Area Sag Mill Iron Arsenic Precipitation Grinding Area POX Feed Thickener Decant Thi

Slide 5: Sulfide Expansion Project Progress
Sulfide Expansion Project Progress Autoclaves and Flash Vessels in Pressure Oxidation Building Acidulation Area, Decant & POX Feed Thickeners Sulfide Project is on budget and on track for first gold pour Q3 2018 Grinding Area TSX: ASR / ASX: AQG / 5

Slide 6: Expansion Project On Track
Expansion Project On Track 2017 Milestones Equipment Procurement Complete Capital Expenditure Progress (in millions) Autoclaves Arrival on Site Complete Completion of Autoclave Assembly Q2 2017 Costs 1, 2 Incurred Engineering Design Complete Q2 2017 $233 Electrical & Instrumentation Works Begin Q2 2

Slide 7: Çöpler Sulfide Project Fully Funded
Çöpler Sulfide Project Fully Funded1 Cash 2 $154 million Over $80 million FCF Liquidity Position through September 2018 Undrawn Finance Facility $220 million $504 Million Includes remaining 132,000 ounces hedged at an average $1,281 gold price Drawn Finance Facility 3 $130 million Remaining Sulfide

Slide 8: Çakmaktepe Central Resource Growth Potential
Çakmaktepe Central Resource Growth Potential Çakmaktepe Central discovered late 2016; most recent drilling not included in initial Resource1 Identified mineralization from 5m to over 20m thick over a 400m strike length Mineral resource remains open 2017 drilling program has recommenced to define dev

Slide 9: Gediktepe Delivers Organic Growth
Gediktepe Delivers Organic Growth PFS defined project as technically and economically viable After tax NPV at 5% of $475M and IRR of 47%1 Alacer owns 50% with JV Partner Lidya Mining Life-of-mine payable metals of 400,000 ozs of gold, 8M ozs of silver, 315M lbs of copper and 780M lbs of zinc1 Life-o

Slide 10: Q1 Operating Highlights
Q1 Operating Highlights Gold Ozs Produced AISC Mining Gross Profit 35,000 $900 $8.0 33,000 $7.5 31,000 $/ounce $M $800 $898 $7.0 29,000 32,918 $7.7 31,926 $846 $6.5 27,000 $6.7 25,000 $700 $6.0 Q1 16 Q1 17 Q1 16 Q1 17 Q1 16 Q1 17 Pasture permit received, reconfirming 2017 production guidance of 160,

Slide 11: Q1 Financial Highlights
Q1 Financial Highlights Three months ended Attributable On 100% basis March 31 Net Profit $10.0 2016 2017 $8.0 Total gold ounces produced 31,926 32,918 $6.0 ($M) $4.0 $8.7 Total gold ounces sold 31,750 34,804 $2.0 $2.1 Average realized price, including hedge $1,187 $1,259 $- Q1 16 Q1 17 Gold Sales (

Slide 12: Growing the Portfolio
Growing the Portfolio Çakmaktepe Gediktepe Çöpler Oxides Çöpler Sulfides Oxides DFS Now Q3 2018 Targeting 2018 June 2018 Organic Growth Strategy Yielding Results TSX: ASR / ASX: AQG / 12

Slide 13: Contact
Contact For further information, please contact: Lisa Maestas Director, Investor Relations +1-303-292-1299 TSX: ASR / ASX: AQG / 13
Source: Internet Archive copy of alacergold.com
More decks from Alacer Gold Corp
Investor Presentation (August 2018)15 slides · August 2018
Q2 2018 Earnings Presentation12 slides · Jul 31, 2018
RBC Global Mining & Materials Conference 201817 slides · June 2018
Corporate Update (May 2017)75 slides · May 10, 2017
FY2016 Earnings Presentation14 slides · Feb 6, 2017
Investor Presentation (January 2017)24 slides · January 2017