Alacer Gold Corp

Alacer Gold — Corporate Update (May 2017)

75 slides from Alacer Gold's corporate update, May 10, 2017

  1. Slide 1: Organic Growth Strategy Yielding Results

    Slide 1: Organic Growth Strategy Yielding Results

    Organic Growth Strategy Yielding Results Çöpler Gold Mine Site Visit May 10-11, 2017 TSX: ASR / ASX: AQG / 1

  2. Slide 2: Cautionary Statements

    Slide 2: Cautionary Statements

    Cautionary Statements Certain statements contained in this document constitute “forward-looking information”, “future oriented financial information” or “financial outlooks” (collectively, “forward looking information”) within the meaning of applicable securities laws. Forward-looking information of

  3. Slide 3: Çöpler Gold Mine Welcome

    Slide 3: Çöpler Gold Mine Welcome

    Çöpler Gold Mine Welcome TSX: ASR / ASX: AQG / 3

  4. Slide 4: Growing the Portfolio

    Slide 4: Growing the Portfolio

    Growing the Portfolio Çakmaktepe Gediktepe Çöpler Oxides Çöpler Sulfides Oxides DFS Now Q3 2018 Targeting 2018 June 2018 Organic Growth Strategy Yielding Results TSX: ASR / ASX: AQG / 4

  5. Slide 5: Company Snapshot

    Slide 5: Company Snapshot

    Company Snapshot Asset Locations Balance Sheet Supports Growth Balance Sheet1 Cash US$284M2 Undrawn Credit Facility US$220M2 Capital Structure Shares on Issue 293M Fully Diluted 296M Avg Daily Trading Volume 1.4M shares Market Capitalization Recent Share Price3 C$2.11 Market Cap ~C$620M 1 As of Marc

  6. Slide 6: Corporate Structure

    Slide 6: Corporate Structure

    Corporate Structure 80% 50% 50% 50% Anagold JV Kartaltepe JV Polimetal JV Tunçpınar JV Çöpler Gold Mine Gediktepe Certain Turkey  Çöpler District Licenses  Regional Exploration 5 Projects Turkey 3 Projects Certain Çöpler Regional District Licenses Exploration 6 Projects 9 Projects Strong Turkish P

  7. Slide 7: Turkey – Great Infrastructure & Mining Jurisdiction

    Slide 7: Turkey – Great Infrastructure & Mining Jurisdiction

    Turkey – Great Infrastructure & Mining Jurisdiction  Europe’s largest gold producer  20% corporate tax rate  Substantial development incentives  Gold royalty rate ~1.6% of sales @ $1,250 gold price  Modern mining law New 150MW Hydroelectric Dam Below Çöpler New 4-Lane Highway & Railway past Çöp

  8. Slide 8: Turkey – Great Infrastructure & Mining Jurisdiction

    Slide 8: Turkey – Great Infrastructure & Mining Jurisdiction

    Turkey – Great Infrastructure & Mining Jurisdiction New Highway Bridge İliç Train Station İliç Government Hospital Primary & Secondary School in İliç TSX: ASR / ASX: AQG / 8

  9. Slide 9: Organic Growth Coming to Life

    Slide 9: Organic Growth Coming to Life

    Organic Growth Coming to Life Çakmaktepe TSF Heap Leach Pad Manganese Pit Marble Pit Main Pit TSX: ASR / ASX: AQG / 9

  10. Slide 10: Management & Employee Strength

    Slide 10: Management & Employee Strength

    Çöpler Gold Mine Management & Employee Strength TSX: ASR / ASX: AQG / 10

  11. Slide 11: Employees

    Slide 11: Employees

    Employees  Quality international and 1 domestic experience, along with excellent education means most roles can be filled by Turkish nationals  Very high rates of both near- mine local and broader Turkish recruitment (<1% expatriates)  Development of Turkish staff to fill senior roles including M

  12. Slide 12: Operations Team

    Slide 12: Operations Team

    Operations Team 1 1 CSEP – Copler Sulfide Expansion Project TSX: ASR / ASX: AQG / 12

  13. Slide 13: Operational Readiness

    Slide 13: Operational Readiness

    Operational Readiness (OR)  Operational Readiness goes well beyond the physical assets and demands the whole business be ready  Strong foundation in highly successful existing oxide heap leach business Assets  Operational Readiness commenced in 2016 across the business to ensure business culture,

  14. Slide 14: Operational Readiness – Key Elements

    Slide 14: Operational Readiness – Key Elements

    Operational Readiness – Key Elements 2017 2018 People: • Reshape organization structure and appoint leaders, • Reframe operating context • Recruit and train new and existing workforce (locally sourced with expatriates only where required) 2016 2018 2020 2 Expats1 17 Expats1 2 Expats1 0.16%1 1.2%1 0.

  15. Slide 15: Health, Safety, Environment & Community Relations

    Slide 15: Health, Safety, Environment & Community Relations

    Çöpler Gold Mine Health, Safety, Environment & Community Relations TSX: ASR / ASX: AQG / 15

  16. Slide 16: Health, Safety and Environment

    Slide 16: Health, Safety and Environment

    Health, Safety and Environment  HSE risks are managed through the risk-based Health, Safety and Environment (HSE) Management Standards and other dedicated systems. Contractors are directed to use the same or similar safety systems and their performance tightly managed  Best of International or Tur

  17. Slide 17: Environment

    Slide 17: Environment

    Environment Çöpler Gold Mine  Anagold’s environmental and social management plans outline the relevant legislative or compliance framework and industry or corporate standards, assessment of impacts, controls in place to minimize harm, monitoring commitments and roles and responsibilities  Environm

  18. Slide 18: Risk

    Slide 18: Risk

    Risk Çöpler Gold Mine  A comprehensive approach to risk has been deployed across the CSEP and Operations  A third-party curated system is used to ensure the quality and consistency of the risk registers and their use. This is especially important in this time of significant change within the busin

  19. Slide 19: Community Relations

    Slide 19: Community Relations

    Community Relations Çöpler Gold Mine  External Affairs Department (EAD) has taken the leading role in the establishment of Alacer’s Social Management System (SMS) which aligns with international practices including IFC Guidelines & Equator Principles  Regular consultation meetings are held with lo

  20. Slide 20: Community Relations

    Slide 20: Community Relations

    Community Relations Çöpler Gold Mine Laying the foundation for the Sponsoring sports thru 24 Helping gain access to greater success of the Çakmaktepe project Erzincan Sport Clubs and the İliç economic benefit through consultation Youth Sports Club Association  Strong support for education, infrastr

  21. Slide 21: Community Relations

    Slide 21: Community Relations

    Community Relations  Upon completion, the Sulfide Expansion Project will extend the life of the mine to 20 years  The construction activities commenced in the second half of 2016 and have brought a new social and economic dynamic to the region  Entrepreneurial and ambitious local community leads

  22. Slide 22: Çöpler Village

    Slide 22: Çöpler Village

    Çöpler Village TSX: ASR / ASX: AQG / 22

  23. Slide 23: Çöpler Gold Mine Geology

    Slide 23: Çöpler Gold Mine Geology

    Çöpler Gold Mine Geology TSX: ASR / ASX: AQG / 23

  24. Slide 24: Exceptional Exploration Potential

    Slide 24: Exceptional Exploration Potential

    Exceptional Exploration Potential Çöpler Gold Mine 1 M oz Chelopech 5 Moz Gediktepe Ada Tepe Çöpler +10 Moz Skouries Cerattepe Hot Kestanelik Tac Mastra Akarca Olimpias Kaymaz Kirazli Sogut Ovacik Diyadin Himmetdede Kisladag Efem Cukuru Oksut  20 years in Turkey gives Alacer early mover advantage 

  25. Slide 25: Çöpler Geology – Regional Setting

    Slide 25: Çöpler Geology – Regional Setting

    Çöpler Geology – Regional Setting Çöpler Gold Mine Çöpler Located in Tethyan Metallogenic Belt TSX: ASR / ASX: AQG / 25

  26. Slide 26: Çöpler Geology – Mineralization Styles

    Slide 26: Çöpler Geology – Mineralization Styles

    Çöpler Geology – Mineralization Styles Çöpler Gold Mine  Çöpler is an intermediate sulfidation epithermal deposit  Sulfide mineralization exhibits three principal styles:  Disseminated sulfides in stock work quartz-veined metasediments and diorite (Main Zone, Marble Zone)  Disseminated sulfides

  27. Slide 27: Çöpler Geology – Key Rock Types

    Slide 27: Çöpler Geology – Key Rock Types

    Çöpler Geology – Key Rock Types Çöpler Gold Mine Limestone Marble Old workings on contacts Metasediments Intrusive Looking west across Çöpler deposit TSX: ASR / ASX: AQG / 27

  28. Slide 28: Çöpler Resource Classification

    Slide 28: Çöpler Resource Classification

    Çöpler Resource Classification1 Plan of Resource Classification showing Indicated (Green) with Inferred (Blue) gold mineralization forming a ring around the Indicated mineralization. 1 Source: Figure 14-17 of Çöpler NI 43-101 Technical Report dated June 9, 2016. TSX: ASR / ASX: AQG / 28

  29. Slide 29: Çöpler Oxide Operations

    Slide 29: Çöpler Oxide Operations

    Çöpler Gold Mine Çöpler Oxide Operations TSX: ASR / ASX: AQG / 29

  30. Slide 30: Stronger 2017: Production, Total Cash Costs and AISC

    Slide 30: Stronger 2017: Production, Total Cash Costs and AISC

    Stronger 20171 Production Increasing2 Total Cash Costs3 Decreasing AISC3 Decreasing +43% 170 $966 -25% -29% $738 US$/Ounce Ounces (000s) 119 $725 US$/Ounce $525 2016A 2017E 2016A 2017E 2016A 2017E Sustaining capital expenditure $12 million 2017 production is weighted Sulfide capital expenditure $420

  31. Slide 31: Life-of-Mine Production through March 31, 2017

    Slide 31: Life-of-Mine Production through March 31, 2017

    Life-of-Mine Production through March 31, 2017 Life-of-Mine Production through March 31, 2017 Çöpler Gold Mine Mined Material Units 2009 & 2010 2011 2012 2013 2014 2015 2016 2017 Q1 TOTAL Tonnes t 1,579,948 7,443,854 7,036,221 6,673,520 6,474,401 6,119,506 4,598,436 1,029,576 40,955,461 Oxide Ore Gr

  32. Slide 32: Çöpler Mine

    Slide 32: Çöpler Mine

    Çöpler Mine Çöpler Gold Mine Looking east across Çöpler deposit TSX: ASR / ASX: AQG / 32

  33. Slide 33: Mining - Overview

    Slide 33: Mining - Overview

    Mining - Overview  Mine plans and designs are prepared by Alacer & Çöpler Gold Mine Anagold Engineering.  Strategic mine planning optimizes use of the ore body  Strategic and tactical stockpiling of sulfide ore optimizes the ore body value and reduces feed variability to the autoclaves  Staged o

  34. Slide 34: Mining – Contractor Mining Fleet

    Slide 34: Mining – Contractor Mining Fleet

    Mining – Contractor Mining Fleet Mining Contractor - Çiftay İnşaat Taahhüt Tic AŞ Çöpler Gold Mine  112 Mercedes Haul Trucks (38 tonne capacity)  3 Volvo Articulated Haul Truck (35 tonne capacity)  2 Volvo Articulated Haul  Truck (40 tonne capacity)  17 CAT Excavators (5m³)  4 CAT Excavator (3

  35. Slide 35: Çöpler Geology – Plan of Deposit

    Slide 35: Çöpler Geology – Plan of Deposit

    Çöpler Geology – Plan of Deposit Çöpler Gold Mine TSX: ASR / ASX: AQG / 35

  36. Slide 36: Çöpler Gold Mine Oxide Process Flow Sheet

    Slide 36: Çöpler Gold Mine Oxide Process Flow Sheet

    Çöpler Gold Mine Oxide Process Flow Sheet Çöpler Gold Mine TSX: ASR / ASX: AQG / 36

  37. Slide 37: Oxide Processing - Overview

    Slide 37: Oxide Processing - Overview

    Oxide Processing - Overview Nominal plant throughput = 6.2Mtpa or 20,000tpd: Çöpler Gold Mine  Primary gyratory & secondary/tertiary cone crushing circuit for rock ore supply  Sizer circuit for clay ore supply  Nominal crush size (P80) to minus 14mm  Good quality agglomeration for percolation co

  38. Slide 38: Çöpler Sulfide Expansion Project

    Slide 38: Çöpler Sulfide Expansion Project

    Çöpler Gold Mine Çöpler Sulfide Expansion Project TSX: ASR / ASX: AQG / 38

  39. Slide 39: Project Construction Underway

    Slide 39: Project Construction Underway

    Project Construction Underway Warehouse Oxygen Plant POX Building Reagent Storage Maintenance Workshop Grinding Thickening HV Switchyard Ball Mill Leach and CIP Tanks Iron Arsenic Precipitation Sag Mill POX Feed Thickener Decant Thickener Acidulation Area Grinding Area Construction Site TSX: ASR / A

  40. Slide 40: Expansion Project Progress

    Slide 40: Expansion Project Progress

    Expansion Project Progress Project remains on track for first gold pour Q3 2018 Autoclave Building with Flash and Autoclave Vessels in Position Oxygen Plant Leach and CIP Area TSF Area TSX: ASR / ASX: AQG / 40

  41. Slide 41: Expansion Project On Track

    Slide 41: Expansion Project On Track

    Expansion Project On Track 2017 Milestones Equipment Procurement Complete Capital Expenditure Progress (in millions) Autoclaves Arrival on Site Complete Completion of Autoclave Assembly Q2 2017 Costs 1, 2 Incurred Engineering Design Complete Q2 2017 $233 Electrical & Instrumentation Works Begin Q2 2

  42. Slide 42: Expansion Project On Track

    Slide 42: Expansion Project On Track

    Expansion Project On Track  No change to scope  The autoclave sections have been welded together, non-destructive testing of the welds completed and verified by third parties  All equipment ordered and progressively arriving in country and on site  Engineering now 98% complete  Engineering offi

  43. Slide 43: Çöpler Sulfide Project Fully Funded

    Slide 43: Çöpler Sulfide Project Fully Funded

    Çöpler Sulfide Project Fully Funded1 Cash 2 $154 million Over $80 million FCF Liquidity Position through September 2018 Undrawn Finance Facility $220 million $504 Million Includes remaining 132,000 ounces hedged at an average $1,281 gold price Drawn Finance Facility 3 $130 million $504M + $80M = $58

  44. Slide 44: Key Project Finance Inputs

    Slide 44: Key Project Finance Inputs

    Key Project Finance Inputs $350M Finance Facility – First Draw of $130M in April  8 year term  No mandatory hedging required  No cost overrun reserve required  No prepayment penalties  Interest rate – LIBOR plus 3.5% to 3.95%  Repayment profile  First repayment Q1 2019  Final repayment Q4 20

  45. Slide 45: Attractive Financial Metrics

    Slide 45: Attractive Financial Metrics

    Attractive Financial Metrics1 Total LoM Financial Metrics After Tax – 100% Basis2, 3 Oxide Only Incremental (Oxide + Sulfide) (as of January 1, 2016) A B–A B LoM cumulative cash flow (millions) $94 $1,577 $1,483 NPV at 5% (millions) $94 $822 $728 IRR % N/A 23.6 19.2 Payback from start of sulfide Au

  46. Slide 46: Operating Costs

    Slide 46: Operating Costs

    Operating Costs1 LoM Cash Operating Costs2 Summary POX Processing Costs by Component Unit Cost Mining Per tonne mined $1.50 Laboratory Rehandle Per tonne rehandled $1.12 $0.89/t Other Fuel $0.39/t Heap Leach Processing Per tonne heap leach processed $8.09 $0.92/t 3% Labour 1% POX Processing Per tonn

  47. Slide 47: Sulfide Project Process Plant Flowsheet

    Slide 47: Sulfide Project Process Plant Flowsheet

    Sulfide Project Process Plant Flowsheet Çöpler Gold Mine Key Design Features:  Horizontal autoclaves  Best practices included for operability and maintainability:  Twin POX trains  Storage within the circuit  Key equipment supplied from proven vendors  Option to add copper recovery circuit TSX

  48. Slide 48: Çöpler District - Çakmaktepe

    Slide 48: Çöpler District - Çakmaktepe

    Çöpler Gold Mine Çöpler District - Çakmaktepe TSX: ASR / ASX: AQG / 48

  49. Slide 49: Çöpler District Initial Resource Confirms Oxide Ounces

    Slide 49: Çöpler District Initial Resource Confirms Oxide Ounces

    Çöpler District Initial Resource Confirms Oxide Ounces Çakmaktepe Central Çakmaktepe North Initial Measured & Indicated Mineral Resource of 140,000 contained ounces1 Access road is permitted and under construction Mineral Resource does not include most recent Çakmaktepe Central drilling 1 Further in

  50. Slide 50: Çakmaktepe Central Resource Growth Potential

    Slide 50: Çakmaktepe Central Resource Growth Potential

    Çakmaktepe Central Resource Growth Potential Çakmaktepe Central discovered late 2016; most recent drilling not included in initial Resource1 Identified mineralization from 5m to over 20m thick over a 400m strike length Mineral Resource remains open 2017 drilling program to define development plans Ç

  51. Slide 51: Çakmaktepe East – Oxide Deposit

    Slide 51: Çakmaktepe East – Oxide Deposit

    Çakmaktepe East – Oxide Deposit Looking Southwards  Flat low-grade gossans 50m Grid at contacts of ophiolite with limestone + metasediment.  Highest grade at contact with diorite.  300m from ÇN.  Robust near and at- surface oxide resource.  Drilled to 25m x 20m Main mineralized spacing zones in

  52. Slide 52: Çakmaktepe Southeast – Oxide Deposit

    Slide 52: Çakmaktepe Southeast – Oxide Deposit

    Çakmaktepe Southeast – Oxide Deposit  Flat lying gossans at contacts of ophiolite with limestone + metasediment. Looking Eastwards  Majority of mineralization within single continuous, near surface gossan  Shallow oxide at surface, and within 20m to 50m of surface.  Extent fully defined by Main

  53. Slide 53: Bayramdere – Oxide Deposit

    Slide 53: Bayramdere – Oxide Deposit

    Bayramdere – Oxide Deposit Looking  Smallest and deepest deposit Southwest but with highest average grade  Multiple flat lodes stepping downwards east to west  Limestone – Ophiolite ‘Contact’ mineralization Main Mineralized Zones in Red 1 Further information, including complete drill hole data, i

  54. Slide 54: Gediktepe

    Slide 54: Gediktepe

    Gediktepe TSX: ASR / ASX: AQG / 54

  55. Slide 55: Gediktepe Delivers Organic Growth

    Slide 55: Gediktepe Delivers Organic Growth

    Gediktepe Delivers Organic Growth PFS defined Project as technically and economically viable Alacer owns 50% with JV Partner Lidya Mining Life-of-mine payable metals of 400,000 ozs of gold, 8M ozs of silver, 315M lbs of copper and 780M lbs of zinc1 Life-of-mine production >12 years of 1.8M ozs2 on a

  56. Slide 56: Gediktepe Production Profile and Project Metrics

    Slide 56: Gediktepe Production Profile and Project Metrics

    Gediktepe Project Gediktepe Production Profile (100% Basis) Life-of-Mine Project Metrics1 (100% Basis) 250 Pre-production capital $120M Additional capital for sulfide plant $126M 200 Gold Equivalent Ounce2 (000 oz) Project payback 2.5 years 150 After-tax free cash flow $745M C22 per oz AuEq3 $613 10

  57. Slide 57: Resources and Reserves

    Slide 57: Resources and Reserves

    Resources and Reserves TSX: ASR / ASX: AQG / 57

  58. Slide 58: Alacer's Mineral Resources

    Slide 58: Alacer's Mineral Resources

    Alacer’s Mineral Resources Notes: Further information on this resource estimate is in the Çöpler Mine Technical Report, the Çöpler District Resource Release, and in the press release dated September 13, 2016, entitled “Alacer Gold Announces a New Reserve for its Gediktepe Project Providing Future Gr

  59. Slide 59: Alacer's Mineral Reserves

    Slide 59: Alacer's Mineral Reserves

    Alacer’s Mineral Reserves Notes: Further information on this resource estimate is in the Çöpler Mine Technical Report and the Gediktepe PFS, all of which can be found on the Corporation’s website and the Corporation’s public filings. The Mineral Reserve methodology and cut-off grades are discussed i

  60. Slide 60: Çöpler Tour Storyboards

    Slide 60: Çöpler Tour Storyboards

    Çöpler Tour Storyboards 1 1 Detailed information regarding the Sulfide Project, including the material assumptions on which the forward-looking financial information is based, can be found in the Technical Report dated June 9, 2016 entitled “Çöpler Mine Technical Report,” available on www.sedar.com

  61. Slide 61: Çöpler POX Process Plant

    Slide 61: Çöpler POX Process Plant

    ÇÖPLER POX PROCESS PLANT PROJECT DESCRIPTION: Once commissioned, the Ҫöpler Sulfide Expansion Project's POX Plant will allow Anagold to efficiently and economically process the primary refractory sulfide ore of the Ҫöpler deposit over its currently projected 20 year operating life. The key metrics f

  62. Slide 62: Process plant area layout

    Slide 62: Process plant area layout

    Crushing Acidulation Iron/Arsenic Grinding Precipitation POX Cyanide Leach High Voltage Switchyard Control Room CIP Elution CCD Detox, Workshop Neutralization & Tailings Reagent Mixing Oxygen Plant Warehouse

  63. Slide 63: Grinding & Crushing Area

    Slide 63: Grinding & Crushing Area

    GRINDING & CRUSHING AREA PROCESS DESCRIPTION: Run Of Mine (ROM) ore is fed to the hopper with a front-end loader through a fixed 500 mm grizzly. The -500 mm ore is processed through an MMD 750 toothed roll sizer, producing -250 mm feed for grinding, which is transferred via two conveyors to the SAG

  64. Slide 64: Acidulation & Iron Arsenic Precipitation Area

    Slide 64: Acidulation & Iron Arsenic Precipitation Area

    ACIDULATION & IRON ARSENIC PRECIPITATION AREA PROCESS DESCRIPTION: Grinding Thickener In the Acidulation circuit, acid produced in the autoclaves and recovered in the decant thickener is used to selectively destroy a portion of the carbonate content of the ground ore before feeding the autoclaves. T

  65. Slide 65: POX Area

    Slide 65: POX Area

    POX AREA PROCESS DESCRIPTION: Acidulated ore from the POX Feed Surge Tanks undergoes two stages of preheating (to 95°C and then 150°C) utilizing steam generated in the two stages of pressure letdown of the autoclave discharge through high and low temperature flash vessels. Preheated feed slurry is p

  66. Slide 66: Key Process/Equipment Design Criteria

    Slide 66: Key Process/Equipment Design Criteria

    KEY PROCESS/EQUIPMENT DESIGN CRITERIA: Normal nameplate capacity of each train (when both trains -2 -2 are on-line) is 122.5 t/h ore with 4.8% S sulfur (5.88 t/h S sulfur). Design capacity of each train (when other train is off-line) is -2 -2 184 t/h ore with 4.8% S sulfur (8.82 t/h S ) Autoclave op

  67. Slide 67: CCD Area

    Slide 67: CCD Area

    CCD AREA PROCESS DESCRIPTION: Iron /Arsenic Precipitation After the Iron/Arsenic Precipitation process, the Counter Current Decantation (CCD) circuit uses a large volume of Process Water (~1350 m3/hr) to wash copper and any residual iron remaining in solution from the oxidized ore. Removing these mi

  68. Slide 68: Cyanide Leach & CIP Area

    Slide 68: Cyanide Leach & CIP Area

    CYANIDE LEACH & CIP AREA PROCESS DESCRIPTION: Iron /Arsenic Precipitation In the Cyanide Leach circuit, liberated gold is leached from the washed oxidized ore with cyanide. In the Carbon In Pulp (CIP) circuit, leached gold is loaded onto activated carbon granules. The loaded carbon is then advanced

  69. Slide 69: Elution Area

    Slide 69: Elution Area

    ELUTION AREA PROCESS DESCRIPTION: In the Carbon Elution circuit, gold which has been Iron /Arsenic Precipitation recovered on carbon in the CIP circuit is stripped from that loaded carbon and concentrated in a high- grade eluate or electrolyte solution. The eluate/electrolyte solution is then proces

  70. Slide 70: Tailings Treatment Area

    Slide 70: Tailings Treatment Area

    TAILINGS TREATMENT AREA PROCESS DESCRIPTION: Iron /Arsenic Precipitation In the Tailings Treatment circuit, cyanide contained in CIP tailings is chemically destroyed or “detoxified”. Copper and other metal salts are also neutralized and precipitated as environmentally stable hydroxides. The tailings

  71. Slide 71: TSF Area

    Slide 71: TSF Area

    TSF AREA FACILITY DESCRIPTION: The Ҫöpler Tailings Storage Facility (TSF) is currently under construction and is located in a tributary canyon on the eastern side of Sabirli Creek, approximately 4.3 km from the POX plant site by haul road. The TSF is designed to provide capacity for the disposal of

  72. Slide 72: Oxygen Area

    Slide 72: Oxygen Area

    OXYGEN AREA FACILITY DESCRIPTION: The Ҫöpler Oxygen Plant is a standard Air Liquide owned and operated facility which will supply gaseous oxygen to the Pressure Oxidation circuit “over the fence” under the terms of a long-term gas supply agreement. OXYGEN PLANT EQUIPMENT: Cold Boxes: Molecular Sieve

  73. Slide 73: Mining Operations

    Slide 73: Mining Operations

    MINING OPERATIONS OVERVIEW: Anagold operates an open pit mine to extract oxide ore for treatment on the heap leach pad and sulfide ore for treatment through the new sulfide pressure oxidation circuit. Sulfide ore mined as part of the oxide operations is currently stockpiled into high, medium and low

  74. Slide 74: Oxide Process Plant

    Slide 74: Oxide Process Plant

    Taili OXIDE PROCESS PLANT OVERVIEW: The process was designed to treat approximately 6.0 Mtpa of ore by three-stage crushing (primary, secondary and tertiary) to 80% passing 12.5 mm, agglomeration (with cement and water) to improve percolation and heap leaching on a lined heap leach pad with dilute s

  75. Slide 75: Çakmaktepe Project Description

    Slide 75: Çakmaktepe Project Description

    Tailin ÇAKMAKTEPE PROJECT DESCRIPTION: The Çakmaktepe Project is located within 4 zones of mineralization that comprise the Çakmaktepe deposit (Cakmaktepe North, East, Southeast and Central), as well as the stand-alone Bayramdere deposit. Projects are located within 5 km to 7 km of the existing Çöpl

Source: Internet Archive copy of alacergold.com

More decks from Alacer Gold Corp